Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on December 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terminal Development Program Definition Plan (PDP)

Closed
2025-RFQ-100State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
Public Safety Building Space Needs Assessment and Renovations
Solicitation # RFP27-009
Glynn County, Georgia, has issued Request for Proposal RFP27-009 seeking a qualified architectural and planning firm to conduct a comprehensive Space Needs Assessment for the Police Department and provide design services for the renovation of the facility's second floor. The project is divided into two primary phases: an initial assessment to evaluate existing conditions, staffing, and security requirements, followed by the development of construction documents, engineering plans, and cost estimates specifically for the second-floor renovation. The selected consultant must ensure all designs adhere to accessibility, life safety, and law enforcement-specific security and access control standards. Proposals must be submitted electronically via the County's eProcurement portal by November 12, 2026, at 1:30 pm, consisting of a separate technical proposal and fee proposal. Evaluation is based on a weighted system focusing on professional qualifications (25%), project manager and team experience (25%), cost (18%), understanding of project scope (15%), firm reputation (15%), and local preference (2%). Required documentation includes a representation affidavit, Georgia Security and Immigration affidavits, and proof of ADA compliance. The successful contractor must maintain general liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as 1 million dollars in automobile insurance and workers compensation. The contract requires adherence to the Georgia Security and Immigration Compliance Act and the implementation of equal employment opportunity policies. Payments are processed within 30 days following the validation of applications for payment by the contract administrator. A site visit for the second floor of the Glynn County Police Department is scheduled for October 23, 2026.
PROCUREMENT

POSTED

about 7 hours ago

DEADLINE

in 22 days
NAICS: 541310
New
SLED
ARCHITECTURAL AND ENGINEERING DESIGN SERVICES
Solicitation # 25-R09
The Stanislaus Council of Governments (StanCOG) is soliciting proposals for architectural and engineering design services to modify its facility at 1407 I Street in Modesto, California. The primary objective is to convert a former bank teller area into a boardroom and meeting chamber capable of accommodating a 16-member board, agency staff, and the public, featuring a dais for 17 members, a speaker's podium, and provisions for acoustic separation and Spanish-language interpretation. A secondary objective involves remodeling the agency's new office space. The project encompasses a full design lifecycle, including programming, schematic design, construction documents, bidding, and construction administration. Selection will be based on demonstrated competence and professional qualifications in accordance with California Government Code section 4525 et seq. Proposers must be registered in SAM.gov and eligible to receive federal funds, adhering to 2 CFR Part 200, FTA Circular 42201.G, and Title 49 CFR Part 29 regarding debarment and suspension. The contract requires compliance with California Labor Code Section 1775 for prevailing wage rates and mandates adherence to the Americans with Disabilities Act and DOT non-discrimination provisions. Submissions must include a technical proposal limited to 30 pages and a separate cost proposal featuring fixed fees for each phase. Payment is processed monthly within 30 calendar days of receiving an acceptable invoice.
Project Delivery

POSTED

about 21 hours ago

DEADLINE

in 17 days
NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Utah

POSTED

about 22 hours ago

DEADLINE

in 10 days
NAICS: 541310
New
SLED
Architectural and Engineering Design Services — Rec Center Locker Room Renovation
Solicitation # 26-082-RFP
The City of West Sacramento is soliciting proposals for architectural and engineering design services to renovate approximately 3,378 square feet of locker room facilities at the West Sacramento Recreation Center. The project, identified as CIP-60022, aims to replace deteriorated flooring, grout, and ventilation with a modern, functional design across the women's, men's, and family locker suites. The work is structured into three fiscal year phases: Phase 1 focuses on plumbing and floor/wall finishes, Phase 2 addresses ventilation, and Phase 3 covers lockers and benches. A critical requirement is the development of a construction phasing plan that allows the facility to remain in continuous public operation. The selected consultant will serve as the design professional of record, responsible for producing coordinated construction documents and 3D renderings at 30, 65, and 95 percent milestones. Key regulatory requirements include compliance with the 2010 ADA Standards for Accessible Design and the 2022 California codes, with the Division of the State Architect serving as the authority having jurisdiction. Proposals are due by December 4, 2026, and will be evaluated based on proven ability, cost-effectiveness, qualifications, and acceptance of the City's standard contract. The contract incorporates federal award provisions, including certifications regarding debarment, suspension, and the Byrd Anti-Lobbying Amendment for awards exceeding 100,000 dollars.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Lakeland Linder International Airport, owned and operated by the City of Lakeland, Florida, has seen significant growth in its commercial air service since June 2024, marked by the expansion of Avelo Airlines from two based aircraft to nine non-stop destinations. The airport’s commercial terminal, originally built in 2001 for general aviation purposes and modified in 2011 and again in 2024, currently includes key facilities such as ticketing kiosks, baggage claim, rental car counters, security screening lanes, passenger hold rooms, and various administrative and support offices. Recent improvements also focused on parking and wayfinding to accommodate rising passenger demand. Recognizing ongoing space and facility constraints, the airport initiated a Terminal Area Master Plan and updated the Airport Layout Plan to guide future terminal development. The City is now soliciting expertise to develop a Terminal Development Program Definition Plan (PDP) aimed at refining and validating these earlier plans. The work includes revisiting the Terminal Area Master Plan recommendations, confirming spatial needs to meet regulatory requirements and secure funding, and producing a conceptual design for terminal expansion and remodeling phases, complete with architectural renderings. Additionally, the project will result in a detailed definition document encompassing rough order of magnitude cost estimates, funding and delivery strategies, and an implementation schedule with high-level phasing. Responses to this solicitation, issued on December 24, 2025, are due by January 23, 2026, with contact points provided for project coordination.

General Info

Lakeland Linder Airport seeks expertise for terminal expansion planning, design, cost estimates, and implementation schedule.

Documents

11

2025-RFQ-100 Terminal Development Program Definition Plan

PDF, High priority: read this first32 pages · rfq
High

2025-RFQ-100 Terminal Development Program Definition Plan (PDP)

PDF, High priority: read this first32 pages · rfq
High

Contractor Annual Audit Form

PDF, Low priority1 page · other
Low

Contractor Safety Evaluation Form

PDF, Low priority3 pages · other
Low

Human Trafficking Affidavit for City of Lakeland Contract Compliance

DOCX, Low priority1 page · affidavit
Low

Indemnification Agreement 2025 - Consultant - FDOT/City of Lakeland

DOCX, Low prioritycontract-document
Low

Indemnification Agreement 2025 Vendor City of Lakeland

DOC, Low priority2 pages · contract-document
Low

Indemnification Agreement for Consultant Services 2025

DOC, Low priority2 pages · contract-document
Low

Indemnification Agreement for Contractor - City of Lakeland 2025

DOC, Low priority2 pages · contract-document
Low

Lakeland Linder International Airport Terminal Area Master Plan Draft Report 2025

PDF, Low priority106 pages · planning-report
Low

Indemnification_2025_Contractor_-_FDOT.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Lakeland Linder International Airport
Contacts2 people available
OfficeLakeland, FL, 33801, USA
Office AddressLakeland, FL, 33801, USA
Contacts
Richard NelsonAirport Planning Manager
Linda AlspaughPurchasing Agent

Interested Companies (44)

AtkinsRéalis USATampa, FL
The Kleingers GroupSt. Petersburg, FL
Construction 95LAUDERHILL, FL

See All 44 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Lakeland Linder International Airport (LAL or airport) is owned and operated by the City of Lakeland, Florida (City). On June 13, 2024, commercial air service returned to LAL with Avelo Airlines providing twice weekly service to New Haven, CT. Since then, Avelo Airlines has grown their operation to include two (2) based aircraft with expanded service to nine (9) non-stop destinations. The current commercial terminal was constructed in 2001 to serve as a General Aviation (GA) Fixed Based Operator (FBO) and airport administration facility. Subsequently, it was modified in 2011 and again in 2024 to serve returning commercial air service. At this time, the commercial terminal includes the following: ticketing (five (5) kiosks), baggage claim (one (1) belt), visitor information booth, four (4) rental car counters, restrooms (pre and post security), security screening checkpoint (two (2) lanes), passenger hold room, post security market, pre security restaurant, airport administration offices, security offices, law enforcement office, and janitorial/electrical/mechanical spaces. Additionally, improvements to the airport's parking lot and wayfinding signage were also made. In 2024 as passenger demand and facility constrains continued to increase, it was determined that it was time for the airport to reevaluate the buildout of the terminal area as shown on the airport's approved Airport Layout Plan (ALP). This resulted in the commissioning of a Terminal Area Master Plan (TAMP) and Airport Layout Plan (ALP) update based on current forecasts of aviation activity. As a result of those two projects, the City is now seeking assistance with the development of a detailed Terminal Development Program Definition Plan (PDP). Project goals include the following: 1) Review, validate, and update recommendations from the Terminal Area Master Plan (TAMP), to allow for further refinement of the building concept. 2) Review spatial requirements ensuring the terminal is right-sized for the needs of the airport so regulatory body acceptance and funding can be obtained. 3) Develop a refined Phase IA (terminal expansion) and Phase IB (existing terminal remodel) conceptual design, inclusive of architectural renderings. 4) Develop a project definition document identifying ROM (Rough Order of Magnitude) costs, a funding plan, a delivery plan (ex. CMAR, Design/Bid/Build, Design/Build), and an implementation strategy (schedule and high-level phasing).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS