The Contractor shall perform all engineering and construction services for the Supply and Installation of Wind and Solar Hybrid Power Systems at the Border Crossing / Customs Station in Kizil-Art and Kulma, Tajikistan.

Awarded
SGE500-12-C-0032Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, schedule preparation, mobilization, demobilization, and right-of-way restoration. Key deliverables include the installation of contractor-provided 48-strand buried fiber optic cable and district-provided 48-strand all-dielectric fiber, starting from the Hoskins 345kV substation control building. Work must be completed by April 15, 2027, with an expected award date on or before November 25, 2026. Qualified bidders must demonstrate the completion of at least three similar projects within the last five years and provide certifications regarding litigation and bonding history. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet, current labor and equipment rates, and a proposed schedule. The contract will be awarded to the responsible bidder with the best evaluated bid based on price, technical conformance, and general qualifications. Payment terms specify that 95 percent of the price is paid upon acceptable performance, with 5 percent retained until final acceptance. Contractors are required to maintain comprehensive insurance coverages, including Commercial General Liability of 1 million dollars per occurrence and Workers Compensation as required by the State of Nebraska.
Nebraska Public Power District

POSTED

about 13 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 19 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 19 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Office of Acquisition Management is awarding a contract to LLC Engineers and Technology for the supply and installation of Wind and Solar Hybrid Power Systems at the Kizil-Art and Kulma border crossing stations in Tajikistan. This project, requested by the INL Office at the US Embassy Dushanbe, has an estimated cost of 187,500.00 dollars. Once completed, the facilities will be transferred to the Tajikistan Government Border Control Section. This acquisition is being conducted as other than full and open competition due to unusual and compelling urgency. The project was originally funded through the Asian Development Bank but was delayed by technical issues and extreme weather at high elevations. LLC Engineers and Technology was selected because they possess the necessary workforce and project knowledge to complete the work within the limited summer building season. Utilizing this contractor avoids a lengthy re-solicitation process that would delay completion until 2013 and void existing equipment warranties. The contractor has agreed to finish the project at the original contract price and warranty terms.

General Info

Agency

N/A

Contract Value

$187,500

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
David A. CubittProcurement Specialist

Full Description

Show more
JUSTIFICATION AND APPROVAL (J&A) FOR OTHER THAN FULL AND OPEN COMPETITION SGE500-12-C-0032 1. The Office of Acquisition Management, Regional Procurement Support Office Frankfurt, (A/LM/AQM/RPSO-F) is conducting this acquisition for the supply and installation of Wind and Solar Hybrid Power Systems at the border crossing stations in Kizil-Art and Kulma, Tajikistan. The requesting agency is the INL Office at the US Embassy Dushanbe, Tajikistan. Upon completion of this project, the Border Crossing Stations will be turned over to, and operated, by the Tajikistan Government Border Control Section. The estimated cost to finish this project is $187,500.00. 2. Nature and/or description of the action being approved. This is a new contract requirement for the Department of State. In August 2009, the Asian Development Bank (ADB) in Dushanbe was provided funding by the US Government to have two Border Crossing Stations constructed within the country of Tajikistan. One Border Crossing Station was to be built on the border of Tajikistan and China in the region of Kulma and the other station was to be built on the border of Tajikistan and Kyrgyzstan, in the region of Kizil-Art. The requirement is to have this project completed with a Department of State contract. 3. A description of the supplies or services required to meet the Department's needs. Completion of the supply and installation of the Wind and Solar Hybrid Power Systems for these two facilities. 4. An identification of the statutory authority permitting other than full and open FAR 6.302-2, Unusual and compelling urgency. 5. A demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited. It is recommended that LLC Engineers and Technology be issued a contract to complete this project. The completion of the equipment supply and installation project has been delayed a year due to inclement weather and technical problems. The building season at those high elevations (above 4,200 m) only lasts a few months in the summer. The original contract between this company and the ADB Bank was cancelled before completion, due to the previously mentioned delays. The ADB Bank is returning the unused portion of the funding to the US Government to fund the completion of this project. LLC Engineers and Technology has an experienced workforce at hand; they have the plan to finish equipping these structures, and they know what remains to be done to finish the project. All of these are time saving and cost saving factors. The company is willing to finish the project at the original awarded contract price and would cost the government no additional funds and complete the project this year. To complete a new solicitation process would require at least five months. It would require a completely new Statement of Work to describe the current status of the project, allow for proposal submission and evaluation and contract award. This would extend the project timeline past the viable working months. Under these circumstances, the remaining work would not be completed until 2013. This would impact / void the warranty on all previously supplied equipment, even before the building becomes occupied. The standard equipment supply and installation contract carries a one year warranty period. A newly assigned contractor will not assume warranty responsibility for equipment supplied, and work previously performed by another company. This contractor has had their contract closed prematurely by the ADB bank. This contractor has announced that they would complete the remainder of the contract requirements at the original contract price and warranty terms; no additional costs in this respect. The power equipment supply and installation in these two Border Crossing stations is a high-interest item between the U.S. Government and the Tajik Government. 6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable. N/A 7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable. The bank fulfilled the requirement for advertising the projects on a national level; and compared technical evaluations and pricing of an adequate number of proposals for this project. In August 2009, the Asian Development Bank advertised the project solicitation in newspapers throughout Tajikistan. The bank has procurement processes and requirements that they must follow; similar to our own Federal Acquisition Regulations. Four proposals were received and evaluated for the original supply and installation of Wind and Solar Hybrid Power Systems at these two facilities; LLC Engineers and Technology was the winning contractor. 8. A description of the market survey conducted and the results or a statement of the reasons a market survey was not conducted. N/A 9. Any other facts supporting the use of other than full and open competition. LLC Engineers and Technology is available, willing, and capable of performing the required work at price, terms, and conditions not achievable by re-soliciting under full and open competition. 10. A listing of sources, if any, that expressed, in writing, an interest in the acquisition. None 11. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. Include a statement that This J&A for other than full and open competition will be published on FedBizOpps in accordance with FAR Section 6.302-2 within 30 days of award.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS