Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

The Cubes at Placentia Industrial Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Perris

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Placentia Ave and Wilson Ave, Perris, CA, 92571

Set-Aside

NONE

Documents

(42)

The Cubes at Placentia Biological Resources Report October 2023

PDFbiological-resources-report

NOP for The Cubes at Placentia Industrial Project DPR 21-00015

PDFnotice-of-preparation

Placentia Avenue Industrial Air Quality, GHG and Energy Impact Analysis

PDFenvironmental-impact-analysis

Environmental Impact Report Section 4.4 Cultural Resources for Placentia Industrial Project

PDFenvironmental-impact-report

Chapter 7 List of Preparers and Agencies Consulted for Environmental Impact Report

PDFother

Environmental Impact Report Section 4.5 Energy Impact Analysis

PDFenvironmental-impact-report

Environmental Impact Report Section 4.9 Hydrology and Water Quality

PDFenvironmental-impact-report

Environmental Impact Report Section 4.7 Greenhouse Gas Emissions

PDFenvironmental-impact-report

Transportation Impact Analysis Section for The Cubes at Placentia Industrial Project EIR

PDFenvironmental-impact-report-section

Environmental Impact Report Section 4.14 Utilities and Service Systems

PDFenvironmental-impact-report

Draft Environmental Impact Report for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

MSHCP Consistency Analysis Report - The Cubes at Placentia Project

PDFconsistency-analysis-report

Environmental Impact Report Section 4.1 Aesthetics for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

Noise Impact Analysis Section for The Cubes at Placentia Industrial Project EIR

PDFenvironmental-impact-report-section

2_Project Description - Cubes at Placentia Industrial Project

PDFproject-description

Cultural and Paleontological Resources Assessment Report for Placentia Avenue Industrial Project

PDFreport

Environmental Impact Report Section 4.13 Tribal Cultural Resources

PDFenvironmental-impact-report

SCH 2023120020 The Cubes at Placentia Industrial Project DEIR NOC

PDFnotice-of-completion

Environmental Impact Report Section 4.10 Land Use and Planning for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

Environmental Impact Report Chapter 4 - Environmental Analysis

PDFenvironmental-impact-report

Environmental Impact Report Section 4.8 Hazards and Hazardous Materials

PDFenvironmental-impact-report

The Cubes at Placentia Industrial Project - Environmental Impact Report Summary

PDFenvironmental-summary

Environmental Impact Report Section 4.2 Air Quality for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

The Cubes at Placentia Industrial Project Environmental Impact Report

PDFenvironmental-impact-report

Lake Creek-Placentia Project Specific Water Quality Management Plan

PDFwqmp

EMWD Comments on The Cubes at Placentia Industrial Project NOP

PDFcomment-letter

Placentia Avenue Industrial Noise Impact Analysis - City of Perris

PDFnoise-study

Placentia Avenue Industrial Traffic Impact Analysis (Revised) May 2024

PDFtraffic-impact-analysis

App F - Geotechnical Report for Proposed Warehouse Infiltration Testing

PDFgeotechnical-report

Chapter 5 Alternatives Analysis for Perris Project EIR

PDFenvironmental-impact-report-section

6_Other CEQA Considerations Environmental Impact Report Chapter

PDFenvironmental-impact-report

Phase I Environmental Site Assessment Report - Placentia Ave. Perris

PDFphase-i-esa

Preliminary Drainage Study for Lake Creek-Placentia DPR21-00015

PDFpreliminary-drainage-study

Letter of Map Revision for City of Perris Flood Insurance

PDFletter-of-map-revision

Chapter 8 References for Perris Valley Commerce Center Environmental Documents

PDFreferences

Environmental Impact Report Section 4.3 Biological Resources

PDFenvironmental-impact-report

FEMA Letter of Map Revision Determination Document for City of Perris CA

PDFletter-of-map-revision

Chapter 3 Environmental Setting - Cubes at Placentia Industrial Project EIR

PDFenvironmental-impact-report-section

Environmental Impact Report Section 4.6 Geology and Soils for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

Environmental Impact Report Introduction for The Cubes at Placentia Industrial Project

PDFenvironmental-impact-report

The Cubes at Placentia Industrial Project EIR Executive Summary

PDFenvironmental-impact-report

The Cubes at Placentia Industrial Project Draft EIR Notice of Availability

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Perris
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Perris
Office AddressN/A
Contacts
Mathew EvansContract Planner
William HalliganSenior Director
The Cubes at Placentia LLCApplicant

Interested Companies (1)

Show more
Harris & Associates
Concord, CA

Full Description

Show more
The Project Applicant proposes to construct a 573,265 square foot concrete tilt up warehouse building with a 5,000 square foot mezzanine, for a total building area of 578,265 square feet (Proposed Project). The Proposed Project would provide a total of 201 automobile parking stalls and 138 trailer stalls. The warehouse would provide a total of 104 truck dock positions, 54 docks on the north side and 50 docks on the south side. The building would have a maximum height of 50 feet. The lot coverage would be 48.29 percent where a maximum of 50 percent is allowed, and the FAR would be 0.4871, where 0.75 is allowed.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SEEKING QUALIFIED SUBCONSULTANTS IN RIVERSIDE COUNTY/SOCAL TO SUPPORT WELL REPLACEMENT PROJECT WITH WATER DISTRICT
Solicitation # seeking-qualified-subconsultants-riverside-countysocal-support-well-replacement-project-water
GHD Inc. is soliciting qualified subcontractors to support the Corydon Well Replacement Design Project for Elsinore Valley Municipal Water District in Riverside County, California, with a focus on engaging Disadvantaged Business Enterprises, Small Business Enterprises, Women-Owned Business Enterprises, Minority-Owned Business Enterprises, and other eligible firms under SBA set-aside programs. The scope of work encompasses a broad range of professional services including engineering, environmental consulting, surveying, geotechnical analysis, permitting, public outreach, and utility location, aligned with NAICS codes such as 541330 and others related to architectural and engineering services, construction, and regulatory support. Interested firms must submit a qualifications package by August 7, 2026, and request solicitation documents by 5 p.m. PST on August 14, 2026, to receive full project details, with the formal response deadline for proposals set for September 15, 2026. All interactions and submissions should be directed to Charlie Brown at charles.brown@ghd.com, and performance is expected to occur within the service area of the Elsinore Valley Municipal Water District in Southern California.
GHD Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California, under solicitation number corydon-well-replacement-c2305-1. The project entails designing a new municipal groundwater production well to replace and abandon the existing Corydon well, with work divided into two phases: Phase 1 includes technical specifications, civil site design, line-bid items for drilling and abandonment, bidding assistance, and full-time on-site construction management oversight in compliance with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design drawings along with a line-item bid schedule for equipping, testing, and commissioning. The new well must meet AWWA standards, utilize a 24-inch diameter stainless steel Ful-Flo louvered screen, match existing vertical turbine equipment, tie into the Corydon Blend station and Malaga blending location, and comply with SWRCB-DDW, DWR, and EVMWD requirements. Key deliverables include a Preliminary Design Report at up to 30% design completion, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of Record Drawings reflecting field changes alongside start-up and operator training support. The contract is governed by the Federal Acquisition Regulation with incorporated clauses including 2 CFR Subtitle A, Part 200, 2 CFR 1400 and 1401, DOI Standard Award Terms, and 48 CFR 52.203-17 for subawards over the simplified acquisition threshold. Respondents must complete mandatory certifications in Attachment “2,” including American Iron and Steel Certification, Debarment and Suspension Certification, SAM Information, Executive Order N-6-22 Certification, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Contractor Registration, and DBE Subconsultant Information. The RFP requires strict adherence to Build America Buy America Act compliance, including domestic-content documentation and waiver procedures for non-compliant materials, and prohibits procurement of equipment from Huawei or ZTE. The award will be based on demonstrated competence and professional qualifications, with evaluation factors weighted as follows: Relevant Qualifications/Experience (25%), Understanding of Project and Project Approach (25%), Scope of Work and Schedule (20%),
Ardurra Group, Inc.

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design of a new municipal groundwater production well to replace and formally abandon the existing Corydon Well on Elsinore Valley Municipal Water District (EVMWD) property, with all work conducted in compliance with California State Water Resources Control Board and Riverside County regulations. The project is divided into two phases: Phase 1 focuses on hydrogeological evaluation, aquifer analysis, well design matching the existing casing depth and sanitary seal standards per AWWA guidelines, civil and site engineering for wellhead facilities, bidding assistance, and full-time on-site construction management and hydrogeological oversight during drilling. Phase 2 involves engineering design for well equipping—including architectural, structural, mechanical, electrical, instrumentation, and controls systems—alongside support during bidding and ongoing engineering oversight during construction. Technical specifications require a 24-inch diameter stainless steel Ful-Flo louvered screen compatible with local geology, and all materials must comply with the Build America, Buy America Act and domestic content requirements under 2 CFR Part 184, with documented efforts to source U.S.-produced iron, steel, and manufactured products. The project spans from initiation in November 2026 through completion in May 2028, with a contract value not exceeding $1,000,000, partially funded by a $400,000 Bureau of Reclamation grant requiring adherence to federal administrative, audit, and procurement rules under 2 CFR Part 200. Proposals must include detailed qualifications, resumes of key personnel, relevant municipal water and groundwater project experience, current California professional licensure, DBE subconsultant participation details, and a comprehensive cost proposal broken down by task with hourly rates and incidental costs. Submissions must be made through EVMWD’s PlanetBids portal by the September 1, 2026 deadline and include mandatory certifications for debarment and suspension, lobbying compliance, American Iron and Steel compliance, executive order N-6-22 sanctions screening, insurance acknowledgment, and non-collusion declarations. Evaluation prioritizes demonstrated technical competence and experience (25%), followed by understanding of project objectives (25%), schedule and risk management (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with the award based on qualifications rather than lowest cost. The consultant must provide monthly progress reports, detailed invoices, and maintain full records for four years post-final payment subject to audit. All
GEI Consultants, Inc.

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
A/E RFQ - Ballistic Aero-Optics and Materials Range Phase 2 - Bryan, Texas
Solicitation # TAMUS-RFQ-01-3489
The Texas A&M University System, through its Office of Facilities Planning & Construction, is seeking qualified Architect/Engineer firms to support the Ballistic Aero-Optics and Materials Range Phase 2 project at the RELLIS Campus in Bryan, Texas. This initiative expands upon a facility completed in 2024 to significantly enhance capabilities in aero-optics and hypersonic testing, including extending aero-optics performance beyond 1,000 meters and hypersonic testing beyond 500 meters, while doubling the recovery tube length from 305 meters to approximately 610 meters. The project calls for the design and construction of critical infrastructure components including a new Tail Building at the south end of the range to house the relocated Laser Firing Tank and final sections of the recovery tube, as well as at least two additional test buildings aligned with project test sections. Standardized 14.6-meter range tube sections will be used throughout the expansion. The total planning budget for the project is $70,605,000, with $17,129,803 allocated specifically for the construction contract, while the remainder covers fees, furnishings, contingencies, and related expenses. Selection will proceed through a qualifications-based process where firms submit statements of qualifications via the e-Builder portal by 2:00 p.m. Central Time on September 1, 2026. The top-ranked respondents may be invited to present their qualifications in an interview, but no pricing or cost information is solicited at this stage. All firms must complete the State of Texas Subcontracting Plan form, for which guidance and a tutorial are provided by the system’s Office of Procurement & Business Services. Inquiries must be directed to Jeff Herring at the Texas A&M University System Office of Facilities Planning & Construction, with contact information provided for phone and email. The solicitation is issued under NAICS code 541330 and administered by a state educational agency with no set-aside provisions identified.
Texas A&M University System

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025815-OVERLAYS of HWY 49:06 and HWY 49:08
Solicitation # AB-2026-05586
Alberta Transportation and Economic Corridors is soliciting proposals from three pre-qualified firms—Associated Engineering Alberta Ltd., Progressive Engineering and Consulting Ltd. (dba CAP Engineering), and ISL Engineering and Land Services Ltd.—for comprehensive engineering services on two sections of Highway 49: Overlay limits 34.946 to 52.425 (WAC0077705) and 0.000 to 2.486 (WAC0077705). The scope includes preliminary engineering, detailed design, contract tendering, contract administration, construction supervision, post-construction review, and warranty inspections. Proposals must be submitted in two separate PDF files under 10 MB each: one detailing technical qualifications and the other containing the proposal fee. This is a Request for Proposal, not an Invitation to Tender, and only submissions from the listed firms will be considered. Alberta Transportation and Economic Corridors reserves the right to request clarifications, accept or reject proposals without negotiation, or negotiate changes with the selected firm. There is no reimbursement for proposal preparation costs. Selection will be based on overall value, not simply the lowest price. The deadline for submissions is September 2, 2026, at 5:30 AM MT, and inquiries should be directed to Rence Balaccua, Project Procurement Officer.
Transportation and Economic Corridors

POSTED

about 17 hours ago

DEADLINE

in 25 days
View Details