Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

The O'Neil Center Boiler Room Bridge Structural Repairs Project-Westside Campus

Active
2026-PAD-0001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Western Connecticut State University is seeking qualified contractors to perform structural repairs on the boiler room ceiling concrete beams and the exterior concrete walkway bridge and adjacent sidewalk near Gate 6 at the O’Neill Athletic Center on the Westside Campus in Danbury, Connecticut. The work encompasses all labor and materials necessary to restore the structural integrity of these concrete elements in accordance with the Contract Documents, including plans, specifications, and referenced attachments. The project is subject to Connecticut’s Prevailing Wage Rates, and contractors must comply with state-mandated spending goals requiring a minimum of 25% participation by Small Business Enterprises and 6.25% by Minority-, Women-, and/or Disabled-owned Business Enterprises, as well as uphold non-discrimination standards enforced by the Connecticut Commission on Human Rights and Opportunities. All work must adhere to the Connecticut State Building Code, manufacturer specifications, and industry standards such as ASTM C920, NFPA 72, and NFPA 110, with inspections conducted at multiple stages including manufacturing, fabrication, and on-site installation, culminating in formal acceptance by the Owner upon issuance of a Certificate of Acceptance. Contractors must submit sealed bids by 2:30 p.m. on August 25, 2026, to the designated purchasing office at WCSU, with all proposals containing required documentation including a completed bid form, bid bond, proof of insurance, DAS prequalification certificate, CHRO compliance certifications, and labor records. The contract requires detailed submittals such as shop drawings, product samples, operation and maintenance manuals, and a schedule of values, with material substitutions permitted only upon prior written approval. Performance must comply with strict packaging and preservation standards, including delivery in manufacturer-sealed containers, proper labeling, and climate-controlled storage. The Contractor is responsible for coordinating trades, maintaining job site safety, cleaning up daily, correcting deficiencies at their own expense, and ensuring that key personnel, including the superintendent and safety officer, are approved and stationed on-site. Subcontractors performing work valued at $25,000 or more must be pre-approved, and substitutions are prohibited without documented good cause and formal authorization. Payment will be made in accordance with AIA G702 applications and the Schedule of Values, with progress payments contingent upon compliance with wage reporting and retention of funds until final acceptance is achieved. The contract has no defined monetary value provided in the solicitation, but all pricing must be submitted via a detailed, line-item schedule of values, and the project is governed

General Info

Structural concrete repairs at WCSU’s O’Neill Athletic Center with SB, M/W/DBE participation, prevailing wages, and strict code compliance.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

238190 - Other Foundation, Structure, and Building Exterior ContractorsView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(4)

WCSU-2026-PAD-0001 ONC Bridge Repairs Structural Drawings

PDFspecifications

WCSU Bid No-2026-PAD-0001 Addendum No. 1

PDFamendment

WCSU-2026-PAD-0001 O'Neill Center Boiler Room Bridge Structural Repairs Project Manual

PDFrfp

Solicitation Change Details Report for 2026-PAD-0001

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Timothy KeithPrimary Contact

Full Description

Show more
Western Connecticut State University is seeking bid proposals for all labor and materials required to provide for structural repairs needed for the existing Boiler Room ceiling concrete beams and the exterior concrete walkway bridge and adjacent concrete sidewalk near Gate 6 that serves the O’Neill Athletic Center located on the Westside Campus in Danbury, CT. Please note: The CT Department of Labor’s Prevailing Wage Rates requirement shall apply to this project. This contract is subject to state contract compliance requirements, including spending allocation goals (25% SBE and 6.25% M/W/DisBE) and non-discrimination requirements enforced by the CHRO.

Similar Contracts

Same NAICS industry code

More opportunities from Connecticut → DAS Procurement

Same awarding agency