Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Thermal Storage Technologies for Mission Assurance at Tinker AFB

Active
72ABW-CE-RFI-Thermal_StorageFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Defense, specifically the FA8137 Afsc Pzioc, has issued a special notice regarding thermal storage technologies for mission assurance at Tinker Air Force Base in Oklahoma. This request for information seeks technical capabilities and solutions to enhance mission reliability through advanced thermal storage systems. Interested parties must submit their responses by September 30, 2026. Primary coordination for this effort is managed by Zachary Bright and Christopher Columbus, with the performance of the work centered at Tinker AFB.

General Info

DoD seeks thermal storage technology solutions for Tinker AFB by September 30, 2026.

Agency

Department Of Defense → FA8137 Afsc PziocView Agency

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)View NAICS

Place of Performance

0, OK, 73145, USA

Set-Aside

NONE

Documents

(1)

tinker_afb_thermal_storage_rfi.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Organization / Agency
Department Of Defense → FA8137 Afsc Pzioc
View Agency Profile
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts
Zachary Bright
Christopher Columbus

Full Description

Show more

See attached for specific request.

Similar Contracts

Same NAICS industry code

NAICS: 541715
New
Federal
NextSTEP-3 Appendix B: Moon Base Demonstrations
Solicitation # M2M-MSFC-0001
The solicitation for NextSTEP-3 Appendix B: Moon Base Demonstrations, issued under solicitation number 80MSFC26R0003 by NASA Marshall Space Flight Center, seeks industry-led demonstrations to advance the development of a permanent lunar base at the Moon’s South Pole, aligning with national space policy goals of sustained lunar presence and deep space exploration readiness. This initiative targets technology readiness levels 6 and above to bridge the gap between innovation and operational mission needs, with an emphasis on architectural studies, risk reduction, and capability maturation rather than hardware production. The procurement employs a two-step process: initial White Paper submissions followed by invited full proposals under a Multi-Award Task Order Contract (MATOC) structure, with all awards structured as Firm-Fixed-Price contracts featuring performance-based milestone payments. The solicitation operates under a dual-path approach, combining Directed-Topic Calls that address specific, evolving mission needs with Open-Topic Calls that invite broader, unanticipated innovations—though submissions duplicating Directed-Topic concepts will be deemed ineligible. Evaluation is based on a non-trade-off, best-value selection process where Technical Capability (including Capability and Past Performance) is weighted at 1,000 points and must meet minimum thresholds for eligibility, while Price is assessed solely for reasonableness and completeness and does not factor into ranking. Proposals must adhere to strict formatting rules, including page limits and submission as a single searchable PDF, with key personnel qualifications, organizational conflict of interest plans, and intellectual property disclosures required as attachments. All contractors must maintain active SAM.gov registration, submit required certifications and representations, and comply with NASA-specific clauses related to data rights, payments, changes, subcontracting, whistleblower protections, and safety and liability waivers. Performance will be conducted under the NASA FAR Supplement, with invoicing required through the NASA Shared Services Center and all delivery and inspection terms left intentionally unspecified, reinforcing the analytical nature of deliverables—reports, models, simulations, and feasibility studies—rather than physical products. The contracting office at Huntsville, Alabama, remains the point of contact, with questions directed to the designated Contracting Officer, and submissions must be completed by the stated deadline to remain valid.
NASA Marshall Space Flight Center

POSTED

about 9 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
WWYK200270 CNSLD Demo Convert Space to Drug Testing Office, B7037
Solicitation # FA813726R0041
This procurement is restricted exclusively to Tinker AFB MAC BOA Holders and pertains to the conversion of space in Building 7037 into a drug testing office under project title WWYK200270 CNSLD Demo Convert Space to Drug Testing Office. The estimated value ranges between $1,000,000 and $5,000,000, and the acquisition is structured as a Total Small Business Set-Aside under NAICS code 236220. Only prime contractors who attended the mandatory site visit on July 15, 2026, at 10:00 AM at the front door of B7037 are eligible to submit proposals. All interested MAC BOA holders were required to RSVP by July 13, 2026, and must provide an Entry Access List if any personnel require base access; subcontractors must be sponsored by a prime contractor for site access. The solicitation number is FA813726R0041, and while the formal RFP remains in draft, project-specific documents including the Statement of Work, IFC plans, wage determination, architectural and engineering drawings, and facility standards have been provided. The work requires full logistical, architectural, and structural execution with field verification of all Government-provided data, and must comply with Tinker AFB-specific standards across Divisions 01, 02, 08, 09, 10, 13, 22, 23, 31, 32, and 33. All submittals, including shop drawings, specifications, and progress reports, must be electronically delivered via DoD SAFE, optical disk, or email using approved formats and file naming conventions, with digital signatures required on all signed documents. The Contractor must establish a quality control system in accordance with specification section 01 45 00.00 10, maintain records of inspections, and submit weekly progress reports to compute payments and track schedule adherence. Key personnel must be identified with resumes submitted within five days of NTP, and all staff must visibly wear company identification. Compliance with EM 385-1-1 safety standards is mandatory, including reporting all incidents and participating in required drills. The project requires submission of a baseline schedule within ten days of NTP, a training plan 30 days before final inspection, and DD Form 1
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker AFB 2026 Multiple Award Construction Contract (MACC) is an indefinite delivery indefinite quantity (IDIQ) vehicle aimed at delivering a wide array of sustainment, maintenance, repair, renovation, and minor construction services across real property facilities at Tinker Air Force Base in Oklahoma. The contract will support complex projects requiring coordination among multiple construction trades and may involve engineering design by licensed professionals. Work will be executed under three methods: Design-Build, where the contractor develops the full design from a 15% schematic baseline; Construction with Limited Design, where the government provides a 35% to 65% design and the contractor completes remaining design elements; and Construction Only, where the government delivers a complete 100% design package. Contractors must furnish all materials, labor, equipment, testing, and quality control necessary to deliver a fully functional end product as specified in each task order. The contract includes a five-year base period with a potential five-year option, and it is governed under NAICS code 236210 with a small business size standard of $45 million. It is structured as a partial small business set-aside, reserving a portion of opportunities for qualified small businesses. Offerors must maintain active registration in the System for Award Management (SAM) to remain eligible for award, with non-compliance potentially leading to disqualification. The government commits to timely negotiation of equitable adjustments following change orders, with a target of 120 days to definitize such adjustments from receipt of a complete proposal. Proposals are due by August 12, 2026, and while the notice does not constitute a commitment to award, it sets the foundation for future task order solicitations under the MACC, with primary contact information provided for inquiries and submissions.
Industrial Building Construction

POSTED

3 days ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
Federal
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation # FA813726R0026
This solicitation, identified as FA813726R0026 and titled WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19, is exclusively reserved for SBA-certified Women-Owned Small Businesses (WOSB) under NAICS code 236220 for a firm-fixed-price construction contract. The project requires the complete design and construction of a facility at Tinker Air Force Base, Oklahoma, with performance to be conducted at the specified location in Coffeyville, Oklahoma. The contractor must assume sole responsibility for both design and construction, delivering a fully operational system meeting stringent technical standards, including HVAC controls, plumbing, electrical infrastructure evaluation, and compliance with National Electrical Code, NFPA 70E, and Tinker AFB-specific facility standards. All work must be completed within 240 calendar days after notice to proceed, with liquidated damages set at $330.42 per calendar day for delays. The solicitation includes detailed requirements for as-built drawings in AutoCAD format, TAB and DALT reports, O&M manuals, and adherence to specialized construction standards such as Mason Industries vibration isolation guides and SSPC QP 8 and QS 1 certifications for coating work, as well as ICRI Tier 2 certification for concrete repairs. All proposals must meet strict pass/fail gates including contractor responsibility verification in SAM and technical acceptability, with the award being made on a Lowest Price Technically Acceptable (LPTA) basis. Proposals must be submitted with an Electronic Cost Model in unlocked Microsoft Excel format, broken down by CSI division or salient work features, along with a detailed Technical Proposal that avoids mere recitation of the SOW and instead demonstrates a concrete methodology for meeting each requirement. Performance is governed by a comprehensive suite of FAR and DFARS clauses, including provisions for changes, suspension of work, warranty of construction, accident prevention, cleaning up, security prohibitions, and compliance with Project Labor Agreement requirements. Key compliance obligations include obtaining performance and payment bonds, appointing a Security Representative, completing Controlled Area Training and Entrance Procedures, and strictly adhering to material handling standards such as manufacturer-original packaging, asbestos-free insulation, and MIL-STD-129/130 marking. Offerors are required to attend an initial site visit on July 20, 2026, at the Northwest Parking Lot of Building 9001, with base access arrangements submitted
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Federal
TINKER AFB MAC BOA-WWYK260007- Renovate Pratt & Whitney Area - B3001
Solicitation # FA813726R0033
This solicitation is issued exclusively to Tinker Air Force Base MAC BOA Holders for the complete interior renovation of the second-floor elevated platform within Building B3001, adjacent to post WX 107 110, to address damage from a prior flood. The project, identified as WWYK260007 under solicitation FA813726R0033, is a sole-source design-build effort requiring the contractor to furnish all design, engineering, materials, labor, equipment, and quality control services under a firm fixed price arrangement. The effort falls under NAICS code 236220 and is a Total Small Business Set-Aside, with a size standard of $45 million in annual receipts. Proposals must be submitted by 2:00 PM CST on July 8, 2026, to Dorothy Inoa with a copy to Sharla Flowers Brandon, and must conform to strict formatting rules including Microsoft Office or Adobe Acrobat PDF files without password protection or zip archives, using at least Arial 8-point font, and must include a technical volume with a project narrative, a pricing volume broken down by CSI Master Format divisions and design versus non-design costs, and a completed Model Order with all fill-ins addressed. The proposal must be accompanied by a bid bond equal to a minimum of 20% of the proposal amount and include written confirmation of SAM.gov registration and compliance with all representations and certifications. Attendance at the Initial Site Visit conducted on May 28, 2026, is mandatory for eligibility to submit a proposal, and only MAC BOA Prime Contractors may RSVP directly; subcontractors must be sponsored by a Prime. All personnel requiring base access must submit an Entry Access List, and all individuals must comply with REAL ID Act requirements and obtain a Common Access Card if needed for physical or logical access. The contract demands a Project Manager and Design Project Manager, with no more than two key roles held by one person, and prohibits a Project Superintendent from assuming the Quality Control Manager role. Performance must begin within ten calendar days of the notice to proceed and be completed within 329 calendar days. The contractor is responsible for an inspection system, a comprehensive Quality Control Plan aligned with specification 01 45 00.00 10, a Health and Safety Plan, FOD awareness training, and a daily tool tracking system for work near operational aircraft. Liquidated damages of $227.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
17829397-Decommission & Demo CRAC Units at B3001, Annex G, Tinker AFB
Solicitation # FA813726R0045
This contract is a solicitation issued by the Department of Defense for a WOSB set-aside under NAICS code 236220, specifically targeting SBACertified Women-Owned Small Businesses to perform the decommissioning and demolition of two obsolete Computer Room Air Conditioning (CRAC) units at Building 3001, Annex G, Tinker Air Force Base in Oklahoma City. The work requires comprehensive restoration of the affected data center space including architectural, mechanical, electrical, and structural repairs to the floor, walls, and ceiling systems to ensure the facility is returned to a safe, clean, and fully operational condition. All proposals must be submitted by September 1, 2026, and only contractors who attend the mandatory Initial Site Visit on August 5, 2026, will be eligible to submit a bid. Interested parties must RSVP for the site visit by 2:00 p.m. CST on August 3, 2026, and must disclose whether their personnel require base access; if so, an Entry Access List must be submitted with the RSVP. Project-specific documents are not available on SAM.gov and must be requested via email from the designated contracting points of contact, Austin Elm and Sharla Flowers. Only prime contractor email addresses are accepted for document distribution and site visit coordination, and all communication must be routed through these designated points of contact.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Federal
Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Solicitation # FA813726R0043
This solicitation is exclusively for Tinker Air Force Base MAC BOA holders and pertains to the complete replacement of Industrial Waste Lift Stations 6N and 6S at Building B62501 on Tinker AFB, Oklahoma. The project requires the contractor to provide full design and engineering services, along with all materials, labor, equipment, testing, quality control, and incidentals needed to demolish and install new lift stations while evaluating the feasibility of consolidating the two units into a single system and reusing or rehabilitating existing wet well structures with coating or liner systems. A mandatory site visit conducted on July 21, 2026, is a condition for eligibility to submit a proposal, and attendance was confirmed through a pre-solicitation RSVP process that required base access clearance details via an Entry Access List. All RFI submissions must be directed to SSgt Isaac Demmers by July 27, 2026, at 1400, and the final proposal deadline is August 31, 2026. The work must comply with Tinker AFB’s 2025 Electrical, Mechanical, and Fire Protection Standards, as well as applicable military and OSHA regulations, including adherence to MIL-STD-129R and MIL-STD-130N for marking and labeling, and AFI 90-821 and OSHA 1910.1200 for hazardous material handling. Contractors must follow the base’s safety protocols under EM 385-1-1, ensure key personnel are OSHA 30-Hour certified, enforce a drug-free workplace, and coordinate safety with subcontractors. Proposals must be submitted electronically via DoD SAFE using a strict naming convention, and all submissions must include design documentation, as-built records, and verification of compliance with base-specific technical criteria. The contracting office is FA8137 AFSC PZIOC, with primary contact Isaac Demmers and secondary support from Tamra Torres; the COR is Randall Floyd, though no contract type, estimated value, or award methodology is disclosed.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 17 days
View Details