Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 6, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Third Generation Forward Looking Infrared (3GEN FLIR) Dewar Cooler Bench (DCB)

Closed
W909MY-20-R-C025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
Federal
Egyptian Navy Autonomous INTelligence System (AINTS) Platform Integration
Solicitation # N0003926RE014
The Naval Information Warfare Systems Command (NAVWAR) is soliciting proposals under RFP N0003926RE014 for the Egyptian Navy Autonomous Intelligence Systems (AINTS) Platform Integration. This Foreign Military Sales effort supports the PEO C4I International Integration Program Office (PMW 740) and involves the design, engineering, procurement, integration, testing, installation, and training for AINTS capabilities. The scope of work includes the delivery of specialized hardware such as Electronic Support Measures (ESM) and Communications Intelligence (COMINT) equipment, Unmanned Surface Vehicles (USVs), and spare parts, alongside technical assistance and Field Service Representative (FSR) support. The contract is estimated for award between June 2027 and June 2030 with a three-year period of performance. The acquisition utilizes a hybrid pricing structure consisting of Cost Plus Fixed Fee (CPFF) for labor, Cost-Reimbursement for travel and other direct costs, and Firm-Fixed-Price (FFP) for materials and equipment. Award will be based on best value, with non-cost factors weighted as significantly more important than cost. Proposals must be submitted in three volumes via the Procurement Integrated Enterprise Environment (PIEE) portal. Due to the inclusion of Controlled Unclassified Information (CUI) and Top Secret requirements, interested parties must submit a signed Non-Disclosure Agreement to access the full Statement of Work. Large business offerors are further required to provide a Small Business Subcontracting Plan ensuring at least 10 percent of subcontracted awards go to small business concerns.
Naval Information Warfare Systems

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 334511
New
PROCESSOR,DISPLAY A — 7010015222097 — N0038326QNB29
Solicitation # N0038326QNB29
Solicitation N0038326QNB29, issued by NAVSUP Weapon Systems Support Philadelphia, is a total small business set-aside for the teardown, evaluation, repair, and modification of LC Processors (NSN 7B22-01-522-2097). The scope includes an initial induction of 17 units with option pricing requested for up to 25 units over a three-year period, with a possible three-year extension. The contractor is responsible for providing all labor, facilities, and tooling to return units to a Ready For Issue condition, as the government will not provide manufacturing aids. Key technical requirements include the use of SAE-AS22759 series wire instead of MIL-W-81381 and compliance with MIL-STD-130 for markings and ISO 9001 or SAE AS9100 for quality management. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Award evaluation includes SPRS risk assessments for item, price, and supplier risk. Contractual terms include a one-year warranty after delivery, FOB Destination shipping, and a 90-day delivery window. Specific provisions are in place for Beyond Economical Repair and Missing on Induction determinations, both requiring DCMA concurrence. All work must be performed at the identified facility, and any changes to repair manuals or sources require approval from the Procuring Contracting Officer. Packaging must adhere to MIL-STD-2073-1, and electronic invoicing is required via the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

VA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc
Contacts2 people available
OfficeALEXANDRIA, VA, 22331-0700, USA
Office AddressALEXANDRIA, VA, 22331-0700, USA
Contacts
Michael Sampson

Full Description

Show more
The Army Contracting Command-Aberdeen Proving Ground (ACC-APG) Belvoir Division is conducting market research on behalf of the US Army Product Manager Ground Sensors, in accordance with Federal Acquisition Regulation (FAR) Part 10. The purpose of this Market Research is to identify potential sources that have the skills, experience, knowledge, and capabilities required to manufacture and deliver Third Generation Forward Looking Infrared (3GEN FLIR) Dual Band Infrared Dewar Cooler Bench (DCB) under Low Rate Initial Production (LRIP) and Full Rate Production (FRP) contracts. The 3GEN FLIR program is currently in the Engineering and Manufacturing Development (EMD) Phase of the Acquisition Life Cycle. Upon the completion of the EMD Phase and entrance into the Production and Deployment Phase, the US Army plans to award an LRIP contract for 3GEN FLIR DCBs. The purpose of the LRIP contract is to establish an initial production base for 3GEN FLIR DCBs and permit an orderly increase in the production rates leading to FRP. During LRIP, the US Army plans to procure approximately 400 3GEN FLIR DCBs over a 2 year period. Upon completion of Operational Test and Evaluation, the US Army plans to procure over 9,000 DCBs during FRP. The DCB is defined as the assembly and integration of the following 6 sub-assemblies and electronic modules: a. Integrated Dewar /Cooler b. Dual Band Infrared Focal Plane Array (FPA) Format: HD 1280x720P: Mid-Wave Infrared (IR) Long-Wave IR. c. In-Dewar Variable Aperture Mechanism d. Control Electronics for the FPA, Variable Aperture Mechanism, B-kit Communications, and Video Output e. Control Electronics for the Cooler f. Mechanical bench The DCB will be provided as Government Furnished Property (GFP) for integration into an upper assembly composed of Optics and Video Processing electronics called the B-Kit. The integration work will be performed by the B-Kit supplier. The DCB and B-Kit sub-assemblies and electronic modules, defined under RFI W909MY-20-R-C025 will be integrated on host platforms to compose a 3GEN FLIR sensor. The DCB is currently defined by the following technical documents: a. A3347043: Performance Specification for the DCB b. A3347044: DCB Interface Control Document (ICD) c. A3347045 Drawing - 3GEN FLIR DCB Mechanical Drawing The documents listed above are Distribution D restricted. The documents are authorized for use by the Department of Defense (DoD) and U.S. DoD contractors only. These documents also contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. These documents will be disseminated in accordance with provisions of DoD Directive 5230.25. In order to be considered technically responsive, sources must have a fully qualified DCB that has either completed System Verification Review (SVR) and Functional Configuration Audit (FCA) or where the supplier can demonstrate with data that their design meets all of the requirements in the technical documents defined above. Sources must be willing to provide these results, if requested, to verify that the DCB meets the requirements of the Government's functional baseline as defined by the DCB Performance Specification, ICD, and Mechanical Drawing. Companies or organizations may request copies of these documents by providing their Point of Contact information listed below to Sharon Minor at Sharon.R.Minor.civ@mail.mil and must clearly state if and how they meet the conditions under which they can receive the documents referenced above. In addition, companies requesting the above information must register for an account with an internet accessible portal known as the Corporate Management System Online (CMS II). Registrants will access the CMS II website (https://www.mycmsportal.com) and follow instructions to complete registration. Documents are currently available for viewing in the CMS II under the 3GEN FLIR folder so the registrants must specifically request access to only the 3GEN FLIR folder. Access to the 3GEN FLIR folder documents will only be granted upon verification that criteria dictated by Distribution D and export control restrictions are met by registered companies or organizations. Foreign participation is excluded. SECRET Clearance, at a minimum, is required. No classified information will be provided as part of this RFI, however, in the event of any subsequent Request for Proposal or Request for Quotation, classified information may become part of that solicitation and will be required as part of any resulting contract. Sources will be required to complete an abbreviated design review prior to LRIP manufacturing to demonstrate the design meets stated performance requirements within cost, schedule, and risk. Sources responding to this Request for Information (RFI) are requested to provide answers to the following questions with as much detailed information as possible: 1. Brief summary of the company Company Information Company Name: Company CAGE Code: Company DUNS Number. If your Company holds a GSA Schedule contract (541 or other), please provide the Schedule number Company: Address Company Phone # Company email: Company Representative and Business Title: Company Socioeconomic Classification -- (Small Business (SB), (8)(a), Woman-Owned (WOSB), Economically-Disadvantaged Women-Owned (EDWOSB), Veteran-Owned and Operated(VOSB), Service-Disabled Veteran-Owned, (SDVOSB), or Historically Underutilized Small Business-Zone (HUBZone), Historically Black College and Universities/ Minority Institutions (HBCU/MI)) 2. Describe plans to have a Government qualified DCB by the time of LRIP award and under what contract(s) the work was performed. 3. Describe capability to build and test a production representative DCB in accordance with the technical documents listed above. 4. Describe an execution plan for producing first articles, conduct a first article test, and enter production. At a minimum the plan should include: a. A detailed timeline from theoretical contract award to delivery of LRIP items. Within the timeline, please include major milestones of first articles, contractor qualification testing, and transition to production. b. Any major capital purchases, key tests, engineering, and documentation required to produce requested items. c. Any Government Furnished Equipment, Government assisted testing, or Government facilities required. d. A risk assessment for each item your company believes they can produce. e. Ramp rate and maximum monthly capacity your company believes they can produce. f. Estimated lead time for new orders after qualification. g. Rough order of Magnitude (ROM) costs for Non-Recurring tasks to set up and qualify first article. Please separate cost estimates by major milestones, key events, and key equipment purchases. 5. Identify sources of supply for any components or assemblies for which you are likely to subcontract production. Standard off the shelf components, such as catalog items, do not need to be addressed. a. What are the supplies being subcontracted? b. Will any SBs be the supplier, if so what percentage will be supplied by SBs? 6. Will any of your manufacturing, assembly, or engineering be accomplished outside the USA? If so, please provide details on how you will keep this program International Trade in Arms Regulations compliant. 7. Describe your company's approach to manage and mitigate obsolescence. At a minimum include the following: a. Obsolescence tracking and industry monitoring b. Assessment if the current design is producible without additional design work c. Potential issues ordering long lead or custom items d. Capability to redesign out obsolete components and produce and qualify a replacement item. 8. Provide a Rough Order of Magnitude (ROM) unit cost of each item which you wish to produce at the below quantity range bins. If separate Non-Recurring Engineering (NRE) costs are required, as per question 6 please provide an estimated cost for the NRE broken down into what your company believes are logical decision points from the execution plan. If NRE is to be amortized across a buy it may be included here with explanation. a. 10-25 b. 26-50 c. 51-100 d. 101-200 e. 200+ 9. Is your company planning on business arrangements with other companies? If so, please advise of the process used in selecting members. 10. Please provide details regarding proposed joint ventures, teaming arrangements, strategic alliances, and/or other business arrangements to satisfy these requirements. Offerors are encouraged to identify teams, indicating each team member's size based upon the NAICS code of the work that the team member may be doing. 11. What are the core competencies of your employees that would support these requirements? Also, please provide the total number of individuals currently employed by your company that are capable of supporting the requirements. 12. Does your company have a SECRET facility or access to one? 13. Do all of the employees that would support this requirement have a security clearance? If not, what percentage of employees that will be involved in this effort, have a security clearance? 14. Please provide your current facility size to include storage capabilities. 15. Discuss existing production capacity. If you do not currently have a production line what quantities are required to start one and keep it running. Additionally, what minimum quantities per year are necessary to maintain the industrial base? 16. Does your firm possess an approved Defense Contract Audit Agency (DCAA) accounting system? QUESTIONS 17 - 19 ONLY APPLY TO THE SMALL BUSINESS RESPONDENTS: In addition to the above, small businesses responding should provide the following information: 17. If you identify your company as a Small Business or any of the Small Business subcategories above, then is your company interested in being a prime on this contract?If so please inform how you will meet the limitations on subcontracting Clause 52.219-14. 18. Under the current SB size standard, do you anticipate your company remaining a small business for at least the next three years, under the stated NAICS code 334511? The Government will use this information to assist in determining if this effort is eligible as a small business set aside. 19. If you are a small business, can your company sustain if not paid for 90 calendar days? 21. The Government requests that interested parties with the capabilities to meet the above requirements should electronically submit White Papers of not more than twenty (20) pages, 8.5" x 11" paper, 12-point, Times New Roman font, with a minimum of one (1) inch margins all around. Responses to Small Business Questions 20 thru 24 are not counted in the above stated twenty (20) page limitation. Any information submitted by respondents to this sources sought notice is totally voluntary and at no cost to the Government. This information will help the Government form its acquisition strategy. All information received in response to this sources sought synopsis that is marked "Proprietary" will be handled accordingly. Responses will not be returned nor will receipt be confirmed. No solicitation exists; therefore, do not request a copy of a solicitation. 22. Please provide the following Point of Contact information on all responses: Responses are due no later than 3:00 PM EST (local time at Fort Belvoir, VA) on 06 August 2020. Email responses should not exceed 5 Megabytes (MB). Responses received after this date and time may not be reviewed. Send responses electronically to: Michael Sampson, Contract Specialist, email: michael.sampson18.civ@mail.mil Sabin A. Joseph, Contracting Officer, email: sabin.a.joseph.civ@mail.mil Sharon Minor, PM GS, 3GEN FLIR COR, email: Sharon.R.Minor.civ@mail.mil Contracting Office Address: Army Contracting Command, APG-Fort Belvoir 10205 Burbeck Road, Bldg 362 Fort Belvoir VA 22060-5811

More opportunities from Department Of Defense → W6QK Acc-Apg Cont Ct Wash Ofc

Same awarding agency

NAICS: 335999
New
Federal
Power Distribution and Illumination Systems, Electrical (PDISE)
Solicitation # W909MY27RA001
The Department of the Army, through the Army Contracting Command-Aberdeen Proving Ground, has issued a Sources Sought and Request for Information for the build-to-print manufacture, assembly, and delivery of Power Distribution and Illumination Systems, Electrical (PDISE). These ruggedized, man-portable systems are designed to connect mobile power generation to mission equipment in harsh tactical environments. The potential requirement focuses on four specific configuration items: the M200 and M100 A/P Feeder Systems, the M40 A/P Distribution System, and the M46 Utility Assembly. All production must strictly adhere to Government Technical Data Packages and military standards, including MIL-DTL-53126 for general specifications, MIL-DTL-53072 for Chemical Agent Resistant Coating, and MIL-DTL-22992 for Class L connectors. The government is utilizing this market research phase to identify qualified large and small business sources under NAICS codes 335999 and 335313. Key areas of interest include industry production capacity, lead times for long-lead materials, and the ability to perform First Article Testing (FAT) within 360 days after contract award. Interested vendors must provide a detailed response by November 6, 2026, including corporate experience, technical capabilities, quality certifications such as ISO 9001:2015 or AS9100D, and Rough Order of Magnitude pricing for quantity ranges between 1 and 200 units. This information will be used to determine the final acquisition strategy and the feasibility of a small business set-aside.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS