Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Threemile Slough Pipeline Crossings Remediation and Decommissioning Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.

General Info

PG&E remediates and decommissions aging pipelines in Threemile Slough, California, with environmental restoration and state oversight.

Place of Performance

State Route 160 and Sherman Island East Levee Road, Rio Vista, CA, 94571

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Environmental Science Associates (ESA)Seattle, WA

Full Description

Show more
Pacific Gas and Electric Company (PG&E) is proposing the Threemile Slough Pipeline Crossings Remediation and Decommissioning Project (Project), which consists of four primary components: project area preparation and equipment mobilization, remediation of the active L-131Y and L-131Z pipelines within Threemile Slough, removal of the terrestrial and submarine portions of the previously abandoned L-131 East and West pipelines, and post-construction restoration of the Project area and demobilization activities. Each Project component includes a defined series of steps summarized in the Mitigated Negative Declaration. Long-term operations of the active L-131Y and L-131Z pipelines would not differ from existing conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the Bristol Alliance of Companies. The scope of work involves comprehensive upgrades and repairs to the fueling system, including upgrading tank automatic tank gauges (ATG), repairing dispenser and offload concrete, installing emergency fuel shut-off (EFSO) systems, and mounting leak detector probes on two diesel above-ground storage tanks. Additional requirements include providing concrete circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man control for truck loading, and modifying tank access platforms. All tanks must be cleaned and vapor-free before work begins, and the project must adhere to UFC, NFPA, and ASTM standards, as well as ADA and ABA accessibility guidelines. This firm-fixed-price solicitation (W9128F27RA054) uses a Lowest Price Technically Acceptable (LPTA) selection process. Proposals must be submitted in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the contract duration, and a technical approach, and a separate pricing volume. The period of performance is 410 calendar days, with a final delivery date of June 18, 2027. The contractor is required to maintain a quality control system complying with FAR 52.246-12 and must adhere to Davis-Bacon Act wage determinations. There is no specific set-aside status for this contract.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 30 days
View Details
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, materials, insurance, and permits to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. The installation includes a 2500-gallon gasoline tank and a 1000-gallon diesel tank, along with new concrete pads, side-mount dispensers, pumps, and a magnetic digital Automatic Tank Gauge. To maintain operations during the project, the contractor must provide temporary gasoline and diesel tanks with metered dispensers. This is a Small Business Reserve Procurement, limited to certified small businesses. The procurement has established participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-owned Small Business Enterprises (VSBE). The contract is estimated between $100,000 and $500,000, with the award based on the lowest responsive and responsible bidder. All work must comply with Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, as well as API standards 650, 620, and recommended practice 1604. Final acceptance is contingent upon approval from the Facility Manager and DNR Project Engineer, and requires the submission of inspection certificates and disposal manifests.

POSTED

3 days ago

DEADLINE

in 24 days
View Details
NAICS: 237120
New
SLED
27-006 Gas Utility Installer
Solicitation # 27-006
The City of Commerce is seeking a gas utility installer for a one-year contract, with options to renew annually for up to three additional years. The scope of work focuses on the installation of gas mains using directional boring, specifically including 3-inch and 4-inch polyethylene gas mains and 3-inch tap, stop, or bottom out steel tie-ins. This is a solicitation for a SLED organization in Georgia, and there is no specified set-aside status for this opportunity. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet the timeline (5 points). The City reserves the right to select the response that is in its best interest. Payment is processed 30 days after the completion of construction and successful testing of all installed products, subject to available funds. Contractors must provide a bid bond of at least 5% and a performance bond equal to 100% of the construction contract amount upon completion. Required insurance includes general liability covering $1,000,000 per incident and Georgia-mandated workman's compensation. Additionally, the successful vendor must provide operator qualifications, a drug and alcohol testing plan, and submit PHMSA Drug and Alcohol Testing Data to the City on a quarterly basis. Submissions must be delivered in a sealed package by December 21, 2026.
City of Commerce

POSTED

4 days ago

DEADLINE

in 29 days
View Details
NAICS: 237120
New
SLED
Restoration Projects Statewide Order Draft Program Environmental Impact Report
Solicitation # 2019100230
The State Water Resources Control Board is managing a series of statewide restoration projects under a Program Environmental Impact Report to enhance aquatic and riparian habitats for anadromous salmonids and native species. A primary focus of these efforts is the Sunset Weir and Pumps Fish Passage Project in Sutter County, which involves removing the existing Sunset Weir from the Feather River to restore fish migration, installing five fish screens at the Sunset Pumps intake, constructing a new wet well, replacing outdated water diversion infrastructure, and stabilizing the left bank with vegetated rock slope protection. Additionally, the project includes filling the downstream scour pool and capping it with spawning grade gravel to create suitable substrate. These initiatives are part of a broader set of restoration activities across California, including projects in Butte, Fresno, Madera, Siskyou, Shasta, Tehama, and Plumas counties. Key deliverables across these sites include the construction of fishways, floodplain excavation, and the creation of side channels and habitat units. All projects are conducted in compliance with the California Environmental Quality Act and the Public Resources Code, with various agencies such as the Wildlife Conservation Board and the Central Valley Flood Protection Board serving as lead or responsible agencies. Performance for specific sites, such as the Arroyo Canal project, includes long-term land use leases extending through 2045.
State Water Resources Control Board

POSTED

4 days ago

DEADLINE

N/A
View Details

More opportunities from California State Lands Commission

Same awarding agency

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS