Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

THUMS D-505 Well Sidetrack Program at Island Freeman

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

THUMS Long Beach CO. is proposing to sidetrack well D-505 in the Wilmington Oil Field from Island Freeman, aiming to access additional hydrocarbon pay zones using the existing wellhead infrastructure without requiring new or expanded facilities. The project involves reworking the designated well with API number 0423720265 to enhance production efficiency while maintaining compliance with environmental and operational regulations under the jurisdiction of the California Department of Conservation, Geologic Energy Management Division. Permit #7056642 has been submitted for approval to authorize this sidetrack activity, which is classified as a rework rather than a new drilling operation. The California Conservation, Department of is the overseeing agency, with the project forecasted and posted on July 20, 2026, and a point of contact listed as Hafiz Ali-Mohammed, Associate Oil & Gas Engineer, reachable via email and phone for project-related inquiries. Pradeep Thallapalle serves as the agent for further coordination, and all activity is centered in California, with no indication of out-of-state involvement or facility expansion. The project does not require public solicitation or set-aside provisions as it falls under regulatory permitting rather than federal contracting, and the primary objective remains focused on subsurface optimization within the existing Wilmington field footprint.

General Info

Sidetrack well D-505 in Wilmington Field to enhance production using existing infrastructure under California regulatory permit.

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

Los Angeles Offshore, Wilmington, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for THUMS D-505 Well Sidetrack Program

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Hafiz Ali-MohammedAssociate Oil & Gas Engineer
Pradeep ThallapalleAgent

Full Description

Show more
THUMS proposes to sidetrack well D-505 in the Wilmington field from Island Freeman. The sidetracks consist of adding pay from an existing well head that will not require new or an expansion of facilities. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving permit #7056642 for THUMS Long Beach CO. to rework the well listed below, in the Wilmington Oil Field. API #0423720265 Well Name: D-505

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
SLED
Aera San Ardo Two (2) Wells Administrative GroupingAera Energy LLC has been granted regulatory approval by the California Department of Conservation, Geologic Energy Management Division to sidetrack two existing oil and gas wells in the San Ardo Oil Field, specifically API numbers 0405322272 and 0405322013, to access remaining hydrocarbons and restore production without abandonment or environmental enforcement triggers. The work will be conducted entirely within the existing 20,000 square foot well pad footprints for each well, with no expansion of surfaces, roads, staging areas, or pipelines, and no new grading or topographic changes will occur. Operations are expected to take approximately 17 operational days per well and include routine vegetation management for fire and road maintenance. The project qualifies for categorical exemptions under California’s Environmental Quality Act, specifically Class 1 for minor alterations to existing facilities, Class 2 for replacement or reconstruction of existing structures, and Class 4 for minor land alterations, as defined in 14 CCR §§ 15301, 15302, and 15304, with additional compliance under Sections 1684.1–1684.2 for oil field operations. No federal acquisition regulations or standard contract clauses apply, as this is a state-regulated permitting action, not a competitive procurement, and no pricing, invoicing, payment, or contracting officer details are specified. The activity is administrative in nature, with CalGEM as the lead regulatory authority, and the project is forecasted with a posted date of July 20, 2026, and no solicitation number. Point of contact for administrative and technical inquiries is Michael Cannon of CalGEM, with Jeffrey Young of Aera Energy listed as a secondary contact.
California Conservation, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 213111
New
SLED
825603_Aera Energy LLC_WFAera Energy LLC, through CalNRG Operating, LLC, has proposed the rework of Lloyd 262, a water flood injector well with API number 0411122032 located in the Ventura Oil Field within Ventura County, California. The well, originally drilled and completed as an injector in 2010, is currently active and situated on an existing, well-maintained pad with access already established. The rework will involve minor wellbore and casing interventions using existing infrastructure, requiring no new surface disturbance, no changes to flowlines, and no installation of new facilities. The operation is expected to last between 10 and 15 days, during which produced water will be used for well work via existing lines, while fresh water will be brought in solely for cement blending. The project falls entirely within the existing oilfield boundary and does not impact vegetation or alter the capacity or number of any surface facilities. Environmental review under the California Environmental Quality Act (CEQA) has been satisfied through categorical exemptions, including Class 1 for existing facilities, Class 2 for replacement or reconstruction, and Class 4 for minor land alterations, with no unusual circumstances identified that would warrant further environmental analysis. The project site is outside the High Pressure Zone as defined by Senate Bill 1137 and compliant with CalGEM regulations under 14 CCR §1684.1 and §1684.2. The California Department of Conservation, Geologic Energy Management Division (CalGEM), has certified the exemption on July 14, 2026, with the notice posted on July 20, 2026. No federal contract clauses, procurement terms, pricing data, delivery specifications, or award evaluation factors are included, as this is a state-regulated well rework permit under CEQA rather than a federal acquisition contract. The primary point of contact for regulatory and administrative matters is Chris Alcock, Associate Oil and Gas Engineer at CalGEM, with inquiries directed to the Ventura office at 4820 McGrath Street, Suite 210.
California Conservation, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 213111
New
SLED
THUMS (B-773) Well Rework Program at Island WhiteTHUMS Long Beach Co. is undertaking a well rework operation on the B-773 production well in the Wilmington Oil Field, located offshore on Island White near Los Angeles, California, under permit #7056609 issued by the California Department of Conservation, Geologic Energy Management Division (CalGEM). The project involves restoring well integrity by squeezing cement into damaged sections of the existing casing, installing a new 6-5/8-inch casing liner above the current liner, cleaning out to total depth, and deploying new production equipment. The work is classified under California Environmental Quality Act (CEQA) categorical exemptions as a minor alteration, replacement, and maintenance of an existing oil and gas facility with no significant environmental impact, specifically referencing Sections 15301, 15302, and 15304 of the California Code of Regulations. All activities are confined to the existing well site and must conform to state regulatory standards, including Public Resources Code provisions governing well maintenance and environmental protection. The project is not governed by Federal Acquisition Regulation (FAR) standards or federal procurement procedures; instead, it operates under California’s regulatory framework for oil and gas operations. There is no disclosed contract value, pricing structure, or payment terms, and no formal solicitation or award process is outlined. The place of performance is clearly defined by geographic coordinates and legal land description, with inspection and acceptance occurring at the well site under CalGEM’s oversight. THUMS Long Beach Co. is the responsible contractor, while CalGEM serves as the authoritative regulatory body with no designated contracting officer’s representative or technical reviewer identified. The project relies on environmental compliance documentation rather than federal representations, certifications, or socioeconomic classifications, and no invoicing systems, accounting codes, or delivery schedules are specified in the available materials. All interactions and permitting are coordinated through CalGEM’s Southern District office in Long Beach.
California Conservation, Department of

POSTED

6 days ago

DEADLINE

N/A
View Details
NAICS: 213111
New
SLED
THUMS (B-102) Well Rework Program at Island WhiteTHUMS Long Beach Co. is authorized to rework the B-102 well, API #0423720395, located offshore in the Wilmington Oil Field at Island White in Los Angeles County, California. The project involves remedial operations to restore well integrity by squeezing cement to repair existing casing damage, running and cementing a new 7-inch casing liner above the existing liner, cleaning out the wellbore to bottom, and installing new downhole injection equipment. The work is intended to maintain the well’s operational function without expanding its use or causing new surface impacts. Regulatory approval for this activity was granted by the California Department of Conservation, Geologic Energy Management Division (CalGEM) under Permit #7056611, following determinations that the project qualifies for categorical CEQA exemptions under 14 CCR §§ 15301, 15302, and 15304, which cover minor alterations, repair of existing facilities, and limited environmental changes. No federal acquisition regulations or contractual clauses are applicable, as this is a state-regulated industrial activity governed by California environmental and wellbore integrity standards, including 14 CCR §§ 1684.1 and 1684.2. The well site coordinates are latitude 33.75350189 and longitude -118.15943909, and the legal description is Section 8, Township 05S, Range 12W, B&M: SB. The project is classified as a forecast and does not include a defined contract value, pricing, line items, or financial obligations. There is no stated period of performance, delivery schedule, or FOB terms, and no funding details such as AAC, TAS, or ACRN are provided. Inspection occurs on-site at the well location, with formal acceptance handled by CalGEM at its Southern District Office in Long Beach, California. The contractor, THUMS Long Beach Co., is responsible for executing the work in compliance with state regulations, while CalGEM serves as the approving authority with no designated Contracting Officer’s Representative or technical representative named in the documentation. No procurement evaluation factors, representations, certifications, socioeconomic classifications, or special requirements such as security clearances or OCI provisions are applicable. The project was posted on July 16, 2026, with certification dated July 15, 2
California Conservation, Department of

POSTED

6 days ago

DEADLINE

N/A
View Details