This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1

Closed
FA813726R0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

This contract seeks a complete replacement of a 3000amp 208Volt switchgear in Building 1 at Tinker Air Force Base under solicitation number FA813726R0025, with the project titled WWYK200051. The procurement is restricted exclusively to Small Business Mandatory Award (MAC) Basic Ordering Agreement (BOA) holders, with an estimated value below $25 million, structured as a Total Small Business Set-Aside under FAR 19.5. Participation is strictly contingent upon attendance at the mandatory site visit conducted on May 14, 2026; only those prime contractors who attended are eligible to submit proposals. The solicitation has undergone multiple amendments to extend the proposal due date, ultimately setting the deadline for July 2, 2026, at 12:00 PM Central Time, with corresponding updates to CLIN titles, revised drawings, IFC design analysis, and responses to pre-bid RFIs made available in the attachments. Technical documentation, including the final IFC specifications, as-built information, switchgear specifications, and updated key drawings such as SD101 and S101 referencing the Fire Riser Repair, are essential for submission and must be accessed directly, with technical access issues requiring immediate notification to the contracting specialist. The acquisition follows Lowest Priced Technically Acceptable (LPTA) procedures, requiring proposals to meet all mandatory technical criteria without trade-offs, and all subfactors must be rated Acceptable with a Low Risk assessment for eligibility. Proposals must be submitted via email in specific acceptable formats—Word, Excel, PowerPoint, Project 2013, or PDF—without compression, password protection, or file suppression utilities. Each offer must include a signed Order Proposal Request, technical and pricing volumes with detailed breakdowns per CSI MasterFormat and DFARS fee limitations, a bid bond equal to 20% of the proposal, and confirmed SAM.gov registration with current small business certifications. The contract includes firm fixed price CLINs for the switchgear replacement, with an 180-day performance period beginning on the Notice to Proceed, and requires performance and payment bonds, compliance with EM 385-1-1 and AFMAN 91-203 for safety, submission of a comprehensive Health and Safety Plan, adherence to Buy American provisions under FAR 52.225-9, and prevailing wage rates. Work

General Info

Small business set-aside for MAC BOA holders replacing switchgear at Tinker AFB, proposals due June 16.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

48

Amendment 0001 to Solicitation FA813726R0025

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation FA813726R00250002

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation FA813726R0025

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation FA813726R0025

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation FA813726R0025

PDF, High priority: read this firstamendment
High

Environmental Requirements for Construction on Tinker AFB - Section 00 72 00

PDF, High priority: read this first89 pages · sow
High

General Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first16 pages · sow
High

General Safety Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first18 pages · specifications
High

Pre-Bid RFIs and Government Responses for WWYK200051 Replace Switchgear Bldg 1

PDF, High priority: read this first29 pages · rfi
High

RFI Responses for WWYK200051 Replace Switchgear Bldg 1

PDF, High priority: read this first22 pages · rfi
High

Section 01 32 16.00 20 Small Project Construction Progress Schedules

PDF, High priority: read this first10 pages · specifications
High

Section 01 33 00 Submittal Procedures

PDF, High priority: read this first21 pages · sow
High

Section 01 33 16.00 10 Design Data (Design After Award)

PDF, High priority: read this first30 pages · sow
High

Section 01 45 00.00 10 Quality Control Specification

PDF, High priority: read this first12 pages · specifications
High

Section 01 50 00 Contractor Facilities

PDF, High priority: read this first8 pages · sow
High

Section 01 78 00 Closeout Submittals

PDF, High priority: read this first27 pages · sow
High

Section 01 78 23 Operation and Maintenance Data

PDF, High priority: read this first14 pages · sow
High

Section L - Instructions to Offerors for Construction Project

PDF, High priority: read this first8 pages · instructions-to-offerors
High

Section M - Evaluation Factors for Award

PDF, High priority: read this first5 pages · evaluation-factors
High

Solicitation FA813726R0025 Replace Switchgear at Tinker AFB

PDF, High priority: read this firstrfp
High

Special Provisions for Working on Tinker AFB Section 00 80 00

PDF, High priority: read this first2 pages · special-provisions
High

Special Provisions for Work on or Near Airfield at Tinker AFB

PDF, High priority: read this first4 pages · special-provisions
High

Statement of Work for Switchgear Replacement at Tinker AFB

PDF, High priority: read this first19 pages · sow
High

Tinker AFB Civil Engineering Conduit Installation Specifications

PDF, High priority: read this firstspecifications
High

Tinker AFB Submittal Register for Switchgear Replacement

PDF, High priority: read this first3 pages · submittal-register
High

Wage Determination OK20260049 for Oklahoma County Building Construction

PDF, High priority: read this first7 pages · wage-determination
High

WWYK160073 Repair Fire Riser As-Recorded 3.18.24

PDF, High priority: read this first11 pages · specifications
High

WWYK200051 IFC Design Analysis Revision 01 for Switchgear Replacement

PDF, High priority: read this first104 pages · design-analysis
High

WWYK200051 Replace Switchgear Building 1 IFC Drawings Rev 1

PDF, High priority: read this first14 pages · drawings
High

WWYK200051 Replace Switchgear Drawings

PDF, High priority: read this first15 pages · drawings
High

WWYK200051 Replace Switchgear IFC Drawings

PDF, High priority: read this first14 pages · specifications
High

WWYK200051 TAFB Issued for Construction Specifications

PDF, High priority: read this first110 pages · specifications
High

830009.pdf Unreadable Document

PDF, Low priorityother
Low

B-1MEP.pdf

PDF, Low priorityother
Low

Bldg 1 - Electrical

PDF, Low priority6 pages · other
Low

EAL List for Construction Project WWYK200051 Replace Switchgear Bldg 1

XLSX, Low priority1 page · other
Low

Inspection Report for Repair Emergency Generator and Transfer Switch WWYK090044

PDF, Low priority2 pages · inspection-report
Low

Legend for New SPON Fuser Disconnect Switch

PDF, Low priorityother
Low

Pre-Bid RFI Government Response Attachment 2 Electrical Closet Pictures

PDF, Low priorityother
Low

Replace Air Conditioning Building 1 Tinker AFB

PDF, Low priorityother
Low

Section 01 42 00 Sources for Reference Publications

PDF, Low priority4 pages · specifications
Low

Table of Contents for Construction Contract at Tinker AFB

PDF, Low priority1 page · other
Low

WWYK200051 Initial Site Visit Sign-In Sheet

PDF, Low priorityother
Low

WWYK200051 Switchgear B1 Site Visit Location

PDF, Low priority1 page · other
Low

710216.pdf

PDF

730072.pdf

PDF

950213.pdf

PDF

WWYK200051_SWITCHGEAR_IFC_CAD+%282%29.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

10 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 16, 2026 to Jun 12, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 12, 2026 to Jun 19, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 19, 2026 to Jun 22, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 22, 2026 to Jul 2, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 2, 2026 to Jul 10, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 06 July 2026


Description of update:


Amendment FA813726R00250005 has been officially added to the Attachments/Links section of this solicitation. The primary purpose of this amendment is to clarify, verify, and update the Contract Line Item Number (CLIN) titles.


Accordingly, the proposal submission deadline has been extended to Friday, July 10, 2026. All interested offerors are instructed to thoroughly review the newly uploaded solicitation document and submit updated pricing for both revised CLINs by this deadline



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 23 June 2026


Description of update:


WWYK160073 Repair Fire Riser has been added to the Attachments/Links in reference to the Revised Drawings 06.22.2026; specifically the Sheet SD101 (Keynote #3) and Sheet S101 (Keynote #4) for the overall dimensions and as-built location. 



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 22 June 2026


Description of update:


Solicitation Amendment FA813726R00250004 has been posted to the Attachments/Links section, extending the proposal due date to July 02, 2026, at 12:00 PM Central Time and to also correct the Titles for CLIN 0001 & 0002. Additionally, the Pre-Bid Revised RFI Govt Response, updated drawings (IFC_Drawings), and the IFC Rev1 Design Analysis have been uploaded and are now available in the Attachments/Links.



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 12 June 2026


Description of update:


Solicitation Amendment FA813726R00250003 has been posted to the Attachments/Links section, extending the proposal due date to June 22, 2026, at 12:00 PM Central Time. Additionally, updated drawings (IFC_Drawings) have been uploaded and are now available in the Attachments/Links section.


Please note that the Government’s revised responses to the Pre-Bid RFIs are currently being finalized. We are researching the answer to one final outstanding question and will upload the Revised RFI Govt Response as soon as possible.



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 08 June 2026


Description of update:


The Government's responses to the Pre-Bid RFIs have been posted in the Attachments/Links section, along with Attachment 1 and Attachment 2 (referenced in the RFI responses). Question #13 remains under evaluation and will be published as soon as possible. Additionally, a Solicitation Amendment (FA813726R00250002) has been created and added to the Attchments/Links to extend the proposal due date to June 19, 2026 at 12:00pm Central Time.



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 03 June 2026


Description of update:


Project RFIs are still being researched for Government responses.  Due to the unknown date to post the RFIs the current proposal due date will be extended with a solicitation amendment when the RFIs are posted.



Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 02 June 2026


Description of update: 


The IFC Final Specifications Information have been uploaded and are now available in the Attachments section.


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 28 May 2026


Description of update: 


This solicitation has been amended to incorporate Clause 52.228-1. Additionally, the IFC Specifications and As-Built Information have been uploaded and are now available in the Attachments section.


The proposal due date remains unchanged: 06/12/2026.


  • Important Note: Contractors experiencing technical issues accessing the IFC Specifications must notify the Contracting Specialist immediately via email to ensure timely resolution.


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 22 May 2026


Description of update: 


WWYK200051 Switchgear Solicitation Due Date has been updated to 06/12/2026 to match the Solicitation.


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 18 May 2026


Description of update: 


WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.


The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.


Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.


Updated 14 May 2026


Description of update: 


All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than  21 May 2026 at 5:00 PM CST. 


The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


Project Solicitation Number:  FA813726R0025


Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers. 


The estimated project value is below $25M and is restricted to SB MAC BOA holders only.


Project specific documents are attached to this posting.


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 5 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.


After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.  Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit. 


You must attend the Initial Site Visit for the project to be considered eligible to propose.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
Solicitation FA8137-26-R-0040 is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for general construction services at Tinker Air Force Base, Oklahoma. The contract encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Work execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars, with a minimum guarantee of 500,000 dollars per awarded contract. The period of performance consists of a five-year base period starting March 26, 2027, with one five-year option period. The procurement is divided into a Small Business Pool, which is a 50 percent set-aside, and a Full and Open Pool. Awards are based on the Highest Technically Rated Offeror (HTRO) methodology, utilizing a Minimum Technical Threshold Rating (MTTR) based on validated self-scored matrices for technical experience, design experience, certifications, and staffing. There is no cost or price evaluation at the IDIQ level. Offerors must be registered in the System for Award Management and meet CMMC Level 1 certification requirements. Following several amendments, the final proposal response deadline was extended to November 16, 2026.
Industrial Building Construction

POSTED

6 days ago

DEADLINE

in about 15 hours
View Details
NAICS: 237310
New
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 3 days
View Details
NAICS: 238190
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

12 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS