Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on November 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TINKER AFB MAC BOA WWYK200323 REPAIR HVAC DIFFUSER AND DUCTWORK B3001

Closed
WWYK200323-PFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 20 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Tinker AFB, OK, 73145, USA

Set-Aside

SBA

Documents

151

13 48 00 Seismic Protection for Mechanical Equipment Specification

PDF, High priority: read this firstspecifications
High

Concrete Reinforcing Specification Section 03 20 00.00 10

PDF, High priority: read this firstspecifications
High

Electric Duct Heaters Specification Section 23 82 43.00 40

PDF, High priority: read this firstspecifications
High

Fire Alarm Reporting System, Radio Type Specification Section 28 31 33.00 10

PDF, High priority: read this firstspecifications
High

Fire Detection and Alarm System Specification Section 28 31 00.00 10

PDF, High priority: read this firstspecifications
High

Fire Detection and Alarm System Specification Section 28 31 64.00 10

PDF, High priority: read this firstspecifications
High

Guide Specification for Forced Hot Water Heating System

PDF, High priority: read this firstspecifications
High

HVAC System Cleaning Specification Section 23 01 30.41

PDF, High priority: read this firstspecifications
High

Interior Signage Specification Section 10 14 00.20

PDF, High priority: read this firstspecifications
High

LonWorks Direct Digital Control for HVAC Specification

PDF, High priority: read this firstspecifications
High

Section 03 11 13.00 10 Structural Cast-In-Place Concrete Forming

PDF, High priority: read this firstspecifications
High

Section 03 30 00 - Cast-in-Place Concrete

PDF, High priority: read this firstspecifications
High

Section 03 39 00.00 10 Concrete Curing Specification

PDF, High priority: read this firstspecifications
High

Section 03 62 16 Metallic Non-Shrink Grouting Specification

PDF, High priority: read this firstspecifications
High

Section 04 20 00 Unit Masonry Specification

PDF, High priority: read this firstspecifications
High

Section 05 05 23.16 Structural Welding Specification

PDF, High priority: read this firstspecifications
High

Section 05 12 00 Structural Steel Specification

PDF, High priority: read this firstspecifications
High

Section 05 40 00 Cold-Formed Metal Framing Specification

PDF, High priority: read this firstspecifications
High

Section 05 50 13 Miscellaneous Metal Fabrications Specification

PDF, High priority: read this firstspecifications
High

Section 06 20 00 Finish Carpentry Specifications

PDF, High priority: read this firstspecifications
High

Section 06 41 16.00 10 Plastic Laminate Clad Architectural Cabinets

PDF, High priority: read this firstspecifications
High

Section 06 61 16 Solid Surfacing Fabrications Specification

PDF, High priority: read this firstspecifications
High

Section 07 12 00 Built-Up Bituminous Waterproofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 14 00 Fluid-Applied Waterproofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 19 00 Water Repellents Specification

PDF, High priority: read this firstspecifications
High

Section 07 21 16 Mineral Fiber Blanket Insulation Specification

PDF, High priority: read this firstspecifications
High

Section 07 24 00 Exterior Insulation and Finish Systems Specification

PDF, High priority: read this firstspecifications
High

Section 07 31 13 Asphalt Shingles Specification

PDF, High priority: read this firstspecifications
High

Section 07 42 13 Metal Wall Panels Specification

PDF, High priority: read this firstspecifications
High

Section 07 42 63 Fabricated Wall Panel Assemblies Specification

PDF, High priority: read this firstspecifications
High

Section 07 51 13 Built-Up Asphalt Roofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 52 00 Modified Bituminous Membrane Roofing Specification

PDF, High priority: read this firstspecifications
High

Section 07 62 13 Copper Sheet Metal Flashing and Trim Specification

PDF, High priority: read this firstspecifications
High

Section 07 72 20 Gravity-Type Roof Ventilators Specification

PDF, High priority: read this firstspecifications
High

Section 07 84 00 Firestopping Specification

PDF, High priority: read this firstspecifications
High

Section 08 11 13 Steel Doors and Frames Specification

PDF, High priority: read this firstspecifications
High

Section 08 11 16 Aluminum Doors and Frames Specification

PDF, High priority: read this firstspecifications
High

Section 08 14 00 Wood Doors Specification

PDF, High priority: read this firstspecifications
High

Section 08 33 23 Overhead Coiling Doors Specification

PDF, High priority: read this firstspecifications
High

Section 08 34 01 Forced Entry Resistant Components Specification

PDF, High priority: read this firstspecifications
High

Section 08 34 19.10 20 Rolling Service and Fire Doors Specification

PDF, High priority: read this firstspecifications
High

Section 08 36 13 Sectional Overhead Doors Specification

PDF, High priority: read this firstspecifications
High

Section 08 41 13 Aluminum-Framed Entrances and Storefronts Specification

PDF, High priority: read this firstspecifications
High

Section 08 51 13 Aluminum Windows Specification

PDF, High priority: read this firstspecifications
High

Section 08 51 23 Steel Windows Specification

PDF, High priority: read this firstspecifications
High

Section 08 52 00 Wood Windows Specification

PDF, High priority: read this firstspecifications
High

Section 08 56 53 Blast Resistant Tempered Glass Windows Specification

PDF, High priority: read this firstspecifications
High

Section 08 71 00 Door Hardware Specifications

PDF, High priority: read this firstspecifications
High

Section 08 81 00 Glazing Specification

PDF, High priority: read this firstspecifications
High

Section 09 22 00 Supports for Plaster and Gypsum Board

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more
**ONLY AVAILABLE TO TINKER AFB MAC BOA HOLDERS** TAFB MAC BOA CONTRACTORS, Please see the attached document for the Tinker MACB Project: WWYK200323-REPAIR HVAC DIFFUSER AND DUCTWORK, B3001 POST P51-R59. **ONLY TINKER AFB MAC BOA HOLDER MAY ATTEND THE SITE VISIT AND PROPOSE** 1. Site visit attendance by the MAC BOA Prime Contractor is mandatory to be considered responsive. Please respond to provide an RSVP response with the number of Prime Contractor and Sub-Contractor personnel expected to attend to the below points of contact (POC) with confirmation of intent to attend the initial site visit NLT 2:00pm CST, Friday 8 November 2024. If a MAC BOA Prime Contractor fails to meet this RSVP deadline, the initial site visit information will not be released to your organization. 2. Attached you will find an Entry Authorization List (EAL) Excel spreadsheet, please fill in all information for individuals who will need base access that do not currently have base access to include any Prime Contractor and Sub-Contractor personnel that plan on attending the initial site visit. Provide email copy of the Excel spreadsheet to the below POCS NLT 2:00pm CST, Tuesday 12 November 2024. 3. Estimated Initial Site visit date: (21 November 2024). A meeting invite will be sent out with the firm initial site visit date and time to all Prime Contractors that respond per paragraph 1 above. Do not make travel plans until the firm initial site visit date/time is provided. 4. IAW MAC BOA guidelines; Small Business Set-Aside. (If >$25 mil). 5. IAW FAR 36.204(e): The estimated price should be described in terms of the following price range: Between $1,000,000 and $5,000,000. **ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE **

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS