Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tinker AFB MACBOA WWYK190067 Repair Fire Suppression System B2136

Closed
WWYK190067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

37

190067_ATT11_Revised Drawings - Life Safety and Egress

PDF, High priority: read this firstspecifications
High

Amendment 0001 to Solicitation FA813725R0012

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation FA813725R0012

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation FA813725R0012

PDF, High priority: read this firstamendment
High

Environmental Requirements for Construction on Tinker AFB - Section 00 72 00

PDF, High priority: read this first89 pages · sow
High

General Decision OK20250049 - Oklahoma Wage Determination

PDF, High priority: read this firstwage-determination
High

General Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first16 pages · sow
High

General Safety Requirements for Construction on Tinker Air Force Base

PDF, High priority: read this first18 pages · specifications
High

Govt Response to RFI 1 - Repair Fire Suppression System B2136 (WWYK190067)

PDF, High priority: read this firstq-and-a
High

Repair Fire Suppression System, Maint Hangar B2136 - Specifications

PDF, High priority: read this firstspecifications
High

Section 01 32 16.00 20 Small Project Construction Progress Schedules

PDF, High priority: read this first10 pages · specifications
High

Section 01 33 00 Submittal Procedures

PDF, High priority: read this first21 pages · sow
High

Section 01 33 16.00 10 Design Data (Design After Award)

PDF, High priority: read this first30 pages · sow
High

Section 01 45 00.00 10 Quality Control Specification

PDF, High priority: read this first12 pages · specifications
High

Section 01 50 00 Contractor Facilities

PDF, High priority: read this first8 pages · sow
High

Section 01 78 00 Closeout Submittals

PDF, High priority: read this first27 pages · sow
High

Section 01 78 23 Operation and Maintenance Data

PDF, High priority: read this first14 pages · sow
High

Solicitation FA813725R00120001 - Repair Fire Suppression System

PDF, High priority: read this firstrfp
High

Solicitation FA813725R0012 - Repair Fire Suppression System

PDF, High priority: read this firstrfp
High

SOW - Repair Fire Suppression System, Maint Hangar B2136

PDF, High priority: read this firstsow
High

SOW - Repair Fire Suppression System, Maint Hangar B2136 (WWYK190067)

PDF, High priority: read this firstsow
High

Special Provisions for Working on Tinker AFB Section 00 80 00

PDF, High priority: read this first2 pages · special-provisions
High

Special Provisions for Work on or Near Airfield at Tinker AFB

PDF, High priority: read this first4 pages · special-provisions
High

Wage Determination Amendment

PDF, High priority: read this first8 pages · amendment
High

Wage Determination OK20250049 - Oklahoma County

PDF, High priority: read this firstwage-determination
High

WWYK190067 Amendment of Solicitation

PDF, High priority: read this first18 pages · amendment
High

WWYK190067 - Liquidated Damages - Repair Fire Suppression System, Maint Hangar B2136

PDF, High priority: read this firstcontract-document
High

WWYK190067 Repair Fire Suppression B2136 Pre-Bid RFI Responses

PDF, High priority: read this firstq-and-a
High

WWYK190067 Repair Fire Suppression System B2136 - Government RFI Responses

PDF, High priority: read this firstq-and-a
High

WWYK190067 Submittal Register - Repair Fire Suppression System, Main Hangar B2136

PDF, High priority: read this firstsubmittal-register
High

Section 01 42 00 Sources for Reference Publications

PDF, Low priority4 pages · specifications
Low

Table of Contents for Construction Contract at Tinker AFB

PDF, Low priority1 page · other
Low

Tinker General Requirements Change Log - Aug 2022

PDF, Low prioritymodification
Low

Visit Sign-in Sheet - 23 Jan

PDF, Low priorityother
Low

WWYK190067 Green Procurement Statement

PDF, Low priority1 page · other
Low

190067_Drawings.zip

ZIP

WWYK190067-Site+Visit+Sign+in+Sheet-+17+April.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Presolicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more

**UPDATED 23 SEP 2025**


Solicitation Amendment 003 uploaded to reflect revised SOW and WD.


Only those who initially sent proposals are allowed to propose. 


Proposals due no later than 4:30PM on 29 September 2025. 


**UPDATED 29 MAY 2025**


The Government has provided an amendment to the solicitation with proposal and signed copies of the solicitation and all amendments due on or before 6 June 2025 by 4:30PM Central time.


**UPDATED 27 MAY 2025**


The Government Team is reviewing RFIs that could potentially impact Proposals. Proposals will be postponed temporarily. The RFI responses and Solicitation Amendment will be posted here with a future proposal due date. Please check back here for updates.



**UPDATED 13 MAY 2025**


Solicitation Amendment uploaded to reflect revised SOW/Drawings, WD & second RFI response from the Governmnent. 


Proposals due no later than 4:30PM on 27 May 2025. 



**UPDATED 30 APRIL 2025**


Solicitation uploaded along with supporting documents, proposals due no later than 4:30PM on 20 May 2025. 


**UPDATED 17 APRIL 2025**


Please see attached updated SOW and Drawings. 


RFIs from the site visit today are due 24 April. Please ensure you are sending all emails to both POCs for this project. 



**SECOND SITE VISIT**


1. Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site is due NLT 1600 CST, Monday, 14 April 2025. In your RSVP email confirmation, please indicate if any of your members need base access. If a Contractor/Sub‐contractor fail to meet this deadline, the site visit information will not be released to your organization. 


Only seven individuals will be allowed per contractor.


2. Site visit date will be April 17, 2025 at 1000. Calendar Invite will be sent to only those who have RSVPd.


3. IAW BOA guidelines; Small Business Set‐Aside. (If >$25 mil).


4. IAW FAR 36.204(g): The estimated price should be described in terms of the following price range: Between $5,000,000 and $10,000,000.


**UPDATED 10 APRIL 2025**


Government responses to site visit RFIs have been attached



**ONLY AVAILABLE TO TINKER AFB MAC BOA HOLDERS**


TAFB MAC BOA CONTRACTORS,


Please see the attached document for the Tinker MACB Project:  WWYK190067 - Repair Fire Suppression System, B2136 (MACB)


**ONLY TINKER AFB MAC BOA HOLDER MAY ATTEND THE SITE VISIT AND PROPOSE**


1. Site visit attendance by the MAC BOA Prime Contractor is mandatory to be considered responsive. 


2. Site visit date: (23 January 2025).  RFIs are due on Thursday January 30, 2025 COB.


3. IAW MAC BOA guidelines; Small Business Set-Aside. (If >$25 mil). 


5. . IAW FAR 36.204(f): The estimated price should be described in terms of the following price range: Between $5,000,000 and $10,000,000.


**ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE **

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS