Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on October 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tinker AFB MACBOA WWYK250172 Replace Walls of Iszard Pool

Closed
FA813726R0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This solicitation, FA813726R0016, is a total small business set-aside under NAICS code 238990 for the replacement of walls at the Iszard Pool House, located in Building B5730 at Tinker Air Force Base, Oklahoma. The project is restricted exclusively to Small Business Contracting (MAC BOA) holders based at Tinker AFB, and only prime contractors holding this status are eligible to submit proposals or attend the mandatory initial site visit, which was held on March 25, 2026. Failure to attend the site visit renders a proposal ineligible. The estimated value ranges between $500,000 and $1,000,000, and the acquisition will be awarded using Lowest Priced Technically Acceptable (LPTA) procedures, where technical acceptability and full compliance with Order Proposal Request (OPR) terms, conditions, representations, and certifications serve as mandatory pass/fail gates before price evaluation proceeds. The contract is firm fixed price, requiring detailed pricing broken down by CLIN structure, with design costs showing labor categories and rates to comply with DFARS 236.606-70, and construction costs subtotaled by CSI Master Format divisions using AF Form 3052 or an approved equivalent. Proposals must be submitted by June 15, 2026, via email without file compression or password protection, and must include a signed Model Order, bid bond equal to at least 20% of the proposal amount, and confirm SAM registration and small business status. Performance must commence within 10 days of notice to proceed and complete within 330 calendar days. All work occurs at Tinker AFB, and contractor personnel must comply with base access requirements, including REAL ID Act compliance, obtain necessary identification and vehicle passes, and return them upon contract termination. The contractor must establish a comprehensive inspection and quality control system that includes weekly submission of inspection logs and corrective actions to the government, adhere to EM 385-1-1 safety standards, account for personnel during emergencies, and provide performance and payment bonds as required by FAR 52.228-15. Invoicing and payment must use the Wide Area WorkFlow (WAWF) system with designated DoDAACs, and all documentation must conform to FAR and DFARS clauses including those on gratuities, anti

General Info

Wall replacement at Tinker AFB pool house, $500K-$1M, small business MAC BOA only.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

0, OK, 73145, USA

Set-Aside

SBA

Documents

14

250172_ATT11 Drawings - Structural and Construction Notes

PDF, High priority: read this firstdrawings
High

Amendment 0001 to Solicitation FA813726R0016 - Extension of Offer Due Date

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation FA813726R0016

PDF, High priority: read this firstamendment
High

FA813726R00160002 - Replace Walls of the Iszard Pool House, B5730

PDF, High priority: read this firstrfp
High

RFI Responses WWYK250172 Replace Interior Walls of Iszard Pool House

PDF, High priority: read this firstrfi
High

Solicitation FA813726R00160001 - Replace Walls of Iszard Pool House

PDF, High priority: read this firstrfp
High

Solicitation FA813726R00160001 - Replace Walls of Iszard Pool House B5730

PDF, High priority: read this firstrfp
High

Solicitation FA813726R0016 Replace Walls of Iszard Pool House

PDF, High priority: read this firstrfp
High

Solicitation FA813726R00310001 - Install MNS and Replace Heat Detectors B976

PDF, High priority: read this firstrfp
High

SOW for Replace Walls of Iszard Pool House, Project WWYK250172

PDF, High priority: read this firstsow
High

Submittal Register Schedule Document

PDF, High priority: read this firstsubmittal-register
High

Wage Determination OK20260049 for Oklahoma County Building Construction

PDF, High priority: read this firstwage-determination
High

Wage Determination OK20260049 for Oklahoma County Building Construction

PDF, High priority: read this firstwage-determination
High

WWYK250172 Site Visit Sign-in Sheet

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts
Nicholas Appleby

Full Description

Show more

28 October 2026


An Amended Solicitation has been created to cancel the project due to funding. Amendment has been attached.


===========================================


11 June 2026


UPDATED TO ADD Correct Amended SOLICITATION FA813726R00160001


Proposal due date:  15 June 2026


===========================================


29 April 2026


UPDATED TO ADD Amended SOLICITATION FA813726R00160001 5/14/2026


Proposal due date:  15 June 2026


============================================


This posting is for Tinker AFB - MAC BOA Holders ONLY.


Project Solicitation Number:  FA813726R0016


Project Title: WWYK250172 – REPLACE WALLS OF ISZARD POOL HOUSE
Project Location: Tinker AFB -B5730
Repair Walls of the Iszard Pool House at project location within B5730 at Tinker Air Force Base (AFB) Oklahoma 73145


The estimated project value is between $500,000 and $1,000,000 and is restricted to SB MAC BOA holders only.


Project specific documents are attached to this posting.


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


This posting is for Tinker AFB - MAC BOA Holders ONLY.  


After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 3 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.   ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.


Initial Site Visit was held on 25 March 2026.


You must have attended the initial site visit to be considered eligible to propose..


This posting is for Tinker AFB - MAC BOA Holders ONLY.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
WWYK240015 - Rehab Tanks 62501E & 62501W
Solicitation # FA813726R0020
This solicitation, identified as WWYK240015 and referencing FA813726R0020, is exclusively open to holders of the Tinker Air Force Base MAC Basic Ordering Agreement and pertains to the rehabilitation of two industrial storage tanks—62501E and 62501W—located within the Tinker AFB Industrial Waste Treatment Plant. The scope of work includes replacing the cathodic protection systems for both tanks, repairing or replacing the internal coatings and associated piping to four control valves, recoating exterior stairs and raised platforms, and removing contaminated waste in an environmentally compliant manner. Proposals must be submitted by June 2nd, 2026 at 1400 to SSgt Isaac Demmers via email, and attendance at the mandatory site visit held on April 24th, 2026 is required for eligibility. All respondents must have base access or submit an Entry Access List for personnel requiring entry. Project-specific documents, including drawings, specifications, and the Statement of Work, are accessible through DOD SAFE upon request, with additional as-built drawings and specifications available from the 72 ABW/CE Engineering Support office on base. The contract is structured under a Firm Fixed Price (FFP) arrangement with a 310-calendar-day performance period beginning upon receipt of the Notice to Proceed. Evaluation follows a Lowest Priced Technically Acceptable (LPTA) process, where all technical subfactors—including capability and management, project narrative, and schedule—must be rated Acceptable to advance, with price serving as the sole differentiator among qualified offerors. Proposals must be organized into three volumes: Technical, Price, and Order, adhering to strict formatting rules requiring Arial 12-point font, 1.5 line spacing, and specific margin requirements. The Technical Volume must detail methodology, site verification, protection of government property, and supporting documentation; the Price Volume must include a CSI Master Format Level IV breakdown and AF Form 3052; and the Order Volume must contain a fully executed Model Order. Payment will be processed exclusively via Wide Area WorkFlow (WAWF) using the designated DoDAAC F87700, with acceptance occurring at the destination location on Tinker AFB. Required certifications include Unique Entity Identifier and CAGE code validation through SAM.gov, and compliance with FAR clauses covering gratuities, contingent fees, anti-kickback procedures, and inspection
Commercial and Institutional Building Construction

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS