Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of The Interior was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Tioga Bridge Rehabilitation

Closed
140L4326Q0078Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
ITB # 002-26 Asphalt Road Resurfacing and Milling
Solicitation # PE-62350-NONST-2026-000000015
The City of Fort Oglethorpe is soliciting sealed bids for ITB #002-26, which involves asphalt road resurfacing and milling on various city streets within Fort Oglethorpe, Georgia. The project scope includes traffic control, milling and patching, recycled asphalt concrete leveling, Superpave Type II asphalt, bitumen tack coat, and thermoplastic striping. Work will be performed on specific streets such as Century Station Drive, Outpost Drive, and others, depending on available funding. The project must be completed by June 30, 2027. Bids must be delivered to the City Clerk and Assistant Finance Director by Thursday, December 3, 2026, at 2 p.m. The award will be granted to the lowest responsive and responsible bidder who is a GDOT-approved contractor and adheres to GDOT specifications. A critical requirement is that the awarded company must self-perform at least 70 percent of the work. Bidders must submit a complete package in a specific order, including the Bid Proposal Form, Bid Fee Form, Execution of Bid Form, Exception Sheet, Affidavit of Non-Collusion, Certificate of Insurance, and an E-Verify Compliance Affidavit. Additionally, contractors must provide a Georgia Occupational Tax Certificate and maintain minimum Worker's Compensation and General Liability Insurance. All written inquiries must be submitted by November 20, 2026.
City of Fort Oglethorpe

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Tioga Bridge Rehabilitation contract is a Firm Fixed Price Construction solicitation issued by the Bureau of Land Management’s Oregon State Office under solicitation number 140L4326Q0078, with a response deadline of August 22, 2026. The project entails the resealing of the Tioga Pedestrian Bridge in Roseburg, Oregon, using copper naphthenate and linseed/pine-tar treatments under full environmental containment to safeguard surrounding natural resources. The work includes mobilization, installation of a containment system with supporting calculations, surface preparation, coating application, site cleanup, and demobilization, all to be completed within a strict 75-day performance period beginning within 10 days of the notice to proceed. The contract is a Total Small Business Set-Aside under FAR 19.5, requiring offerors to self-certify as small businesses and provide UEI and CAGE codes. The acquisition follows a Lowest Price Technically Acceptable (LPTA) methodology, where technical acceptability based on demonstrated experience with similar bridge coating and containment projects serves as a mandatory pass/fail threshold; only technically acceptable offerors will be evaluated on price, with the lowest quotation selected for award. All work must comply with FP-24 Standard Specifications, OSHA standards, and federal environmental laws including the Clean Air Act, Clean Water Act, and Executive Order 12088. Key contractual requirements include mandatory submission of liability insurance and performance/payment bonds via email prior to work commencement, strict controls on substitutions of key personnel or materials requiring prior written approval, and immediate reporting of any archaeological or historical findings. Invoicing must be done electronically via the Treasury’s IPP platform, and wage determinations for truck drivers are limited to Davis-Bacon rates only when operating on-site or hauling between the site and nearby dedicated facilities. Site visits are strongly encouraged, and offerors must submit a two-part proposal: a narrative detailing relevant project experience and a completed Standard Form 1442 with pricing, both emailed directly to designated government contacts by August 21, 2026, 5:00 p.m. Pacific Time.

General Info

Tioga Bridge rehabilitation under LPTA, small business set-aside, 75-day deadline, environmental containment, copper naphthenate treatment.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

OR

Set-Aside

SBA

Documents

3

Amendment 0001 - Solicitation 140L4326Q0078

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 - Solicitation 140L4326Q0078 Cancellation

PDF, High priority: read this firstamendment
High

Solicitation 140L4326Q0078 Tioga Bridge Rehabilitation IFB

PDF, High priority: read this first106 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 22, 2026 to Aug 27, 2026. The notice title changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Oregon State Office
Contacts1 person available
OfficePORTLAND, OR, 97204, USA
Office AddressPORTLAND, OR, 97204, USA
Contacts

Full Description

Show more
The Tioga Pedestrian Bridge requires timber resealing and full environmental containment to protect surrounding natural resources during application of copper naphthenate and linseed/pine-tar treatments.

More opportunities from Department Of The Interior → Oregon State Office

Same awarding agency

NAICS: 238210
Federal
T--NHOTIC AV SYSTEM REPLACEMENT
Solicitation # 140L4326Q0126
Solicitation 140L4326Q0126 is a request for a firm-fixed-price commercial service contract to replace the audio-visual systems at the National Historic Oregon Trail Interpretive Center in Oregon. The scope of work includes the full replacement of AV systems in the Flagstaff Gallery, Orientation Gallery, Trading Camp, Camp Life, and Theaters 1, 2, and 3, as well as the public address system. Additionally, the contractor is responsible for updating the Leo Adler Theater sound and lighting systems, installing interactive touch-screen kiosks, and creating a small-scale greenscreen studio for tele-learning. The project requires the replacement of all AV-related low and medium voltage wiring and communication cabling, with the contractor adhering to OSHA regulations, building codes, and ABA compliance. This total small business set-aside opportunity has a period of performance from December 1, 2026, to November 30, 2028. Award decisions will be based on the most advantageous offer considering technical approach, past performance on similar contracts, and fair and reasonable pricing. The contractor is responsible for all labor, materials, and the disposal of installation debris, while the government will provide the system content for the contractor to load and test. Payments will be processed electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System. All offerors must maintain active representations and certifications in the System for Award Management and comply with the Service Contract Act Wage Determinations for the applicable Oregon counties.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

8 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS