Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tomahawk Creek Wastewater Treatment Facility Process Improvements Project

Closed
2026-017 Addendum 1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Sealed bids are solicited for Contract No. THM1-C031, covering comprehensive process improvements at the Tomahawk Creek Wastewater Treatment Facility in Johnson County, Kansas, under Solicitation No. 2026-017 Addendum 1. The scope includes multiple infrastructure upgrades aimed at enhancing operational efficiency, safety, and environmental compliance: odor control enhancements through customized rubber mat covers on BNR basins and installation of Odor Control System No. 4; separation and redirection of centrifuge slop flows to reduce solids buildup; ferric chloride feed addition to the primary sludge thickener to curb hydrogen sulfide emissions; modifications to enable direct discharge of thickened primary sludge to the co-thickened sludge wetwell, along with a fifth digester feed pump and SCADA-integrated pressure sensors; installation of a sludge cleanout manhole for future maintenance; access drive and scum pit cleanouts for primary clarifiers, plus electric actuators on six influent slide gates; replacement of potable water with plant effluent water for Micro-C dosing and rerouting discharge lines above grade for better visibility; addition of a second submersible mixer in two pre-anoxic zones to manage scum; replacement of a 21-foot ladder with a stair tower at Digester No. 3 for improved safety; replacement of corroded aluminum slide gates in the chlorine contact basin with corrosion-resistant materials; installation of an electric actuator and safety platforms on the secondary effluent gate and disk filter basins; and implementation of an isolated drainage system near ferric chloride unloading stations to prevent chemical spills from entering storm sewers, as mandated by KDHE. Bidders must submit a bid bond equal to 5% of their bid amount, issued by a surety licensed in Kansas, payable to the Johnson County Board of County Commissioners. All submissions must be made electronically via the IonWave portal in PDF format, meeting strict technical requirements including OCR, bookmarking, thumbnails, and a 10 MB file size limit. Bids are due by June 25, 2026, and must be submitted by the designated point of contact, Nicole Averell. The solicitation is open to all qualified offerors, with no set-asides specified, though local preference, apprenticeship program participation, and eligibility for individuals with disabilities or disabled veterans may be considered under state law. Contractors must comply with stringent packaging, preservation, and labeling standards for equipment, ensuring protection from moisture

General Info

Bids due June 25, 2026, for wastewater facility upgrades in Kansas, including odor control, sludge management, and safety improvements.

Documents

14

2026-017 Tomahawk Creek WWTF Process Improvements IFB Addendum 1

PDF, High priority: read this firstifb
High

Addendum No. 1 for IFB No. 2026-017 Tomahawk Creek WWTF Process Improvements

PDF, High priority: read this firstamendment
High

Bid Bond for Johnson County Wastewater Tomahawk Creek WWTF Process Improvements

DOCX, High priority: read this firstbid-bond
High

Invitation for Bid 2026-017 Tomahawk Creek WWTF Process Improvements Q&A

PDF, High priority: read this firstq-and-a
High

Questionnaire for Manufacturer Information Submission

DOCX, High priority: read this firstquestionnaire
High

Tomahawk Creek Contract 26 WWTF Expansion Electrical and Mechanical Plans V4

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion General Notes Volume 6

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion Structural and Mechanical Plans V2

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion Structural Drawings Volume 4

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion Volume 1 of 8

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion Volume 7 of 8

PDF, High priority: read this firstspecifications
High

Tomahawk Creek Contract 26 WWTF Expansion Volume 8 of 8

PDF, High priority: read this firstspecifications
High

Tomahawk Creek WWTF Process Improvements 100% Drawings

PDF, High priority: read this firstspecifications
High

Tomahawk Creek WWTF Process Improvements 100% Specifications and IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeKS, USA
Organization / AgencyKansas → Johnson County
Office AddressKS, USA
Contacts
Nicole Averell

Full Description

Show more
S e a l e d b i ds f or Bi d R e q u est No. 2026-017 f or J o h nson C o u n t y W a s te w a ter Tomahawk Creek WWTF Process Improvements Project – Contract No. THM1-C031. The w ork co n s i s ts of th e f ol l o w i n g improvements to the Tomahawk Creek WWTF : A. Odor Control Improvements: Installation of covers on the BNR Basin anaerobic and pre-anoxic basins, and addition of Odor Control System No. 4. Customized rubber mat covers will also be added to the BNR Influent Splitter Box and RAS Splitter boxes to mitigate odor complaints and improve operational flexibility for VFA production. B. Sidestream Nitrogen Treatment Improvements: Separation of centrifuge startup/shutdown slop flows from the main centrate discharges and redirection to the plant drain to reduce solids accumulation in the Centrate Holding Basin. C. Gravity Thickener H 2 S Reduction: Addition of ferric chloride feed capability to the Primary Sludge Gravity Thickener/Fermenter to reduce hydrogen sulfide generation and loading on odor control units. D. Co-Thickening Improvements: Modifications to allow thickened primary sludge (TPS) to discharge directly to the Co-Thickened Sludge (CTS) wetwell, addition of a fifth digester feed pump for continuous mixing, and installation of pressure sensors on digester feed pump discharge piping with SCADA integration. E. Sludge Cleanout Manhole: Addition of a sludge cleanout manhole over the (3) 4” CTS lines between the Solids Processing Building and Digester Control Building to facilitate future line cleaning. F. Primary Clarifier Improvements: Construction of an access drive and installation of cleanouts for scum pit drainpipes, and addition of electric actuators to six PC Influent Slide Gates at the Headworks Building. G. Micro-C Dosing Improvements: Replacement of potable water with Plant Effluent Water (PEW) as carrier water for Micro-C dosing, and rerouting of Micro-C discharge lines above grade for improved visibility and control. H. Pre-Anoxic Mixers: Addition of a second submersible mixer in pre-anoxic zones PAX1-1 and 3-1 to facilitate the movement of scum out of pre-anoxic zones. I. Digester No. 3 Access Improvements: Replacement of the existing 21-ft tall cageless ladder with a stair tower to improve safety and accessibility to the digester roof. Demo of existing ladder. J. Chlorine Contact Basin Improvements: Replacement of all aluminum slide gates with corrosion-resistant materials due to chloride-induced deterioration. K. Filter Complex Improvements: Installation of an electric actuator on the secondary effluent/filter influent gate for automated wet weather operation, and addition of safety platforms to the eight disk filter basins to enhance maintenance access and safety. L. Storm Drain Isolation near Ferric Tanks: Installation of an isolation drainage system near the ferric chloride truck unloading station to prevent chemical spills from entering the storm sewer system, as identified by KDHE. Bi d d e rs s h a l l su b m i t w i th t h e i r b i d a b i d b o n d i ss u e d b y a s u r e t y c o m p a n y l i c e n se d to do b us i n ess i n t he S t a te of K a nsas i n t h e a m o u nt of f i v e p e r ce nt (5%) of the to t al a m o u nt of th ei r b i d. S aid g u ara n tee s h a l l b e m a d e p a y a ble to the B o a rd of Co u n t y Co m m i ss i o n ers of Jo h nson C o u n t y , K a nsas. All bids shall be submitted electronically on IonWave .

More opportunities from Kansas → Johnson County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS