Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 4, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Top Lake Trail Construction

Awarded
AG-05GG-S-08-0040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor across a 25-foot width, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. Technical requirements include the implementation of complete electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a set-aside for Disadvantaged Business Enterprises. Interested parties must coordinate with the primary point of contact, Andrew Burk, regarding the submission process.
Granite Construction Company

POSTED

about 1 hour ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
6893
Solicitation # 49749
Solicitation 49749, titled Taxiway Light Bases and Extensions at Logan International Airport, is a procurement opportunity issued by the Massachusetts Port Authority for construction and equipment acquisition. The project is funded under Airport Improvement Program Project Number 3-25-0010-XX and requires the delivery of materials to the Massport warehouse at the Central Stockroom in East Boston, Massachusetts. Bidders must provide at least seven calendar days of advance notice before shipping materials, which should be delivered in the fewest bulk shipments possible. The award will be based on the best interest of the Authority rather than the lowest cost. Compliance requirements are extensive, including adherence to the Davis-Bacon Act for labor wages, the Occupational Safety and Health Act of 1970, and Clean Air and Water Pollution Control requirements for contracts exceeding 100,000 dollars. Bidders must submit specific Buy American certifications via Appendix IIC-1 or IIC-2 to be considered responsive. Additionally, the contract mandates compliance with Civil Rights Title VI, Section 504 of the Rehabilitation Act, and various federal prohibitions regarding foreign-owned entities, specific telecommunications equipment, and unmanned aircraft systems. Preference in hiring will be given to qualified veterans and disabled veteran-owned small businesses.
Massachusetts Port Authority - Goods & Services

POSTED

about 1 hour ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 5 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Awarded on July 31, 2008, the Top Lake Trail Construction project, solicitation number AG-05GG-S-08-0040, was issued by the USDA Forest Service's Okanogan-Wenatchee National Forest. Located near Leavenworth, Washington, within the Glacier Peak and Henry M. Jackson Wilderness areas, the project involved the construction of approximately 3,600 feet of trail. The scope of work included mobilization, clearing, grubbing, excavation, the creation of rolling dips, and the construction of a shallow stream ford. The contract required completion within 90 calendar days from the Notice to Proceed. Technical specifications for the project detailed precise engineering requirements for trail infrastructure. These included typical trail cross sections with a width of 915mm, specific benching requirements based on sideslope percentages, and the installation of rock retaining walls with 600mm widths and 300mm embedment. Additional requirements covered the construction of ditches with a 1:1 slope and 12-inch depth, as well as strict clearing limits requiring a height clearance of 3 meters and lateral clearing of 1.2 meters on both the uphill and downhill sides.

General Info

USDA Forest Service contract for 3,600 feet of trail construction in Washington state.

Contract Value

$18,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

This project is located northwest of Wenatchee, Washington in Chelan County. From Wenatchee, drive west on Highway 2, turn ri, LEAVENWORTH, WA, 98826, USA

Set-Aside

NONE

Award Issued Date

Documents

8
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityspecifications
Low
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Okanogan-Wenatchee National Forest
Contacts2 people available
OfficeWENATCHEE, WA, 98801, USA
Office AddressWENATCHEE, WA, 98801, USA
Contacts
Mariah R MorrisContract Specialist
Ellen A KinamonProcurement Technician

Full Description

Show more
The Top Lake Trail Construction project will relocate a portion of the Top Lake Trail #1506 starting at the Top Lake Trailhead. The work will consist of the construction of approximately 3,600 feet of new trail. There are no restrictions on the use motorized or mechanized equipment in the project area. Items of work will include: construction of a 36 inch wide full bench trail with drainage structures and features as needed. This project is located northwest of Wenatchee, Washington, near the Top Lake Trailhead, Chelan County. The performance period is 90 calendar days with a desired start date being August 1, 2008. The Government's estimate is between $25,000 and $100,000. A 100% payment bond or irrevocable letter of credit is required after award. The NAICS code is 237990. No set asides will be utilized. No formal site visit is anticipated.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS