Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on September 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Towing Equipment Maintenance and Compliance Inspections

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811192
New
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This project involves the removal and replacement of the existing light rail vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The scope of work includes the installation of industrial wash equipment, programmable controls, a water reclamation and filtration system, a new foundation and prefabricated canopy, and necessary electrical and plumbing upgrades. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, bidders must be approved through a pre-qualification process by submitting a Statement of Qualifications and a completed qualification questionnaire via the OpenGov portal. The final deadline for pre-qualification submissions is November 16, 2026, at 2:00 pm PT. Minimum eligibility requires a valid California contractor's license with at least 10 years of experience as a Class A (General Contractor) or Class B (General Building) classification. Bidders must also provide proof of bonding capacity, maintain liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, and ensure all entities in a joint venture are separately pre-qualified. Evaluation is based on a scoring matrix and interviews, with a minimum total score of 55 points required to avoid disqualification. Because the work occurs in an active light rail environment, the selected contractor must comply with VTA safety and operating procedures and coordinate closely to minimize operational impacts. Additionally, the contractor and all subcontractors must be registered with the California Department of Industrial Relations and comply with prevailing wage and apprenticeship requirements.
Engineering and Program Delivery

POSTED

about 21 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Palm Springs in California is seeking a subcontractor for Towing Equipment Maintenance and Compliance Inspections. The scope of work involves performing scheduled maintenance, conducting safety checks, and providing certification for towing equipment to ensure full compliance with SAE J706 standards, manufacturer specifications, and city re-inspection requirements. This opportunity was posted on September 15, 2025, with a response deadline of October 14, 2025. The project falls under NAICS code 811192, focusing on specialized equipment maintenance and safety certification to maintain operational standards.

General Info

Palm Springs seeks a subcontractor for towing equipment maintenance and compliance safety inspections.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ 12-25.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Official Police Towing and Storage Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palm Springs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform scheduled maintenance, safety checks, and certification of towing equipment to meet SAE J706, manufacturer specs, and city re-inspection requirements.

More opportunities from California → City of Palm Springs

Same awarding agency

NAICS: 237310
SLED
East Palm Canyon Bridge Project
Solicitation # 12-04
The East Palm Canyon Bridge Project (City Project No. 12-04) is a construction solicitation by the City of Palm Springs, California, for the widening and rehabilitation of the East Palm Canyon Drive Bridge and surrounding infrastructure. The scope of work is divided into three phases, encompassing bridge and roadway widening, architectural treatment and lighting, the construction of a bus pad, retaining walls, and a soundwall, as well as storm drain improvements and the relocation of an SCE capacitor bank. Additional add-alternate work includes expanded cold plane and overlay limits, water valve adjustments, and survey monument reestablishment. The project is estimated at 12 million dollars for the base bid and 380,000 dollars for the add-alternate work, with a total performance period of 350 working days from the date of the Notice to Proceed. The contract is governed by the 2024 Greenbook Standard Specifications for Public Works Construction and the 2021 Caltrans Standard Specifications. Award will be based primarily on the lowest overall cost to the City, provided the bidder is responsive and responsible. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Buy America standards for materials, and strict environmental restrictions, specifically prohibiting construction equipment in the Palm Canyon Wash during the Casey’s June Beetle flight season from March 1 through June 30. Bidders must submit all documentation electronically and provide a bid bond, with the requirement to replace the performance bond with a warranty bond for 25 percent of the final contract price upon completion.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS