Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on October 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Town of Apex Request for Qualifications - Downtown Residential Stormwater Master Plan

Closed
State & Local
Submission Closed
Solicitation #
1015TOADRSWMP001

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses project initiation, data gathering, basis of design, detailed design, and engineering support during the bid and award phase for injection and monitoring well packages. The project must adhere to California Code of Regulations Title 22 for indirect potable reuse and follow ASCE (2007) guidelines for the Geotechnical Baseline Report. Performance is scheduled to span from April 2027 through May 2032, covering design, drilling, construction, and commissioning phases. This is a small business set-aside available to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract is structured on a time and material basis with a not-to-exceed maximum total. Proposals are evaluated based on team qualifications, level of effort, and interviews, with a maximum of 100 points available. The selected consultant must comply with the Buy America Preference for Infrastructure Projects, the Davis-Bacon Act, and other federal grant requirements. The Agency retains ownership of all project materials, and the contract is governed by the laws of the State of California and San Bernardino County.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work encompasses project initiation, data gathering, and the development of a basis of design across civil, structural, electrical, instrumentation and control, and traffic control disciplines. Key technical requirements include conducting utility research, field investigations such as potholing and geotechnical surveys, and providing design submittals at 60%, 90%, and 100% completion levels. All deliverables must adhere to the agency's Engineering Design Guidelines and be submitted as final PDF and AutoCAD files. This solicitation is a set-aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, via PlanetBids. The selection process is based on a 100-point evaluation of critical success factors, risk mitigation, stakeholder engagement, and technical strategy, with the top three ranked consultants eligible for interviews. The resulting contract will be a not-to-exceed agreement paid on a time and material basis, with a specific $50,000 allowance for mitigation measures. Compliance with 2 CFR Part 200, the Buy America Preference, and Disadvantaged Business Enterprise (DBE) requirements is mandatory.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The Sacramento County Sheriff's Office (SSO) is seeking a qualified consulting firm to evaluate the existing walk-in evidence freezer room at the Property Warehouse. The primary objective is to assess current conditions, identify deficiencies, and provide a comprehensive report recommending whether to repair or replace the equipment and related systems. The project is divided into two phases: Phase 1 involves a thorough assessment including photographs, measurements, and an improvement plan, while an optional Phase 2 covers the production of bid-ready construction documents. All work must be led by a California-licensed engineer, and any design documents must be signed and sealed by one. This is a consulting services contract only; the selected firm will not be responsible for the actual furnishing or installation of the freezer. The project must adhere to California Penal Code Section 1417.5, California Department of Justice standards, IAPE guidelines, and NIST recommendations. Funding is provided by the County, though equipment may be purchased via the Edward Byrne Memorial Justice Assistance Grant (JAG), which subjects equipment purchases to the Buy American Act and NEPA rules. Proposals must be submitted via the SacCountyE bids portal by December 18, 2026. There is no specific set-aside status for this solicitation. Payment for the assessment and design phases is contingent upon County acceptance of the completed deliverables.
DGS: CAPSD - Procurement

POSTED

1 day ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Town of Apex is seeking Statements of Qualifications from engineering firms licensed in North Carolina to develop a comprehensive stormwater Master Plan for its downtown residential core. The project covers approximately 185 acres bounded by Elm Street, Center Street, Schieffelin Road, and Highway 55 / James Street. The selected consultant will evaluate aging drainage infrastructure, assess flooding vulnerabilities caused by increased impervious surfaces, and perform hydrologic and hydraulic modeling to identify system bottlenecks. Key deliverables include a prioritized Capital Improvement Plan featuring infrastructure upgrades and green stormwater infrastructure, a grant funding strategy to identify FEMA or state DEQ resources, and public engagement efforts including workshops and presentations to the Apex Town Council. Interested firms must submit a single PDF Statement of Qualifications to Jessica Bolin by November 20, 2026, at 2:00 p.m. ET. Submissions are limited to 25 pages, excluding the cover letter, table of contents, execution form, and references, and must not include any professional services fees or hourly rates. Evaluation will be based on demonstrated competence and qualifications, with the Town potentially conducting interviews in January 2027 before announcing a selection. Final scope, schedule, and compensation will be determined through negotiations with the top-ranked firm. Written questions are due by November 6, 2026, and firms are encouraged to email their intent to submit as soon as possible.

General Info

Apex seeks engineering firms to develop a stormwater Master Plan for downtown residential.

Place of Performance

NC, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

44 mandatory

44 requirements in 7 areas

  • Submission16 · 16 must
    001

    Cost of Proposal Preparation

  • Compliance8 · 8 must
    026

    Ownership of Submitted Materials

  • Technical7 · 7 must
    034

    Firm Profile Content

  • 41 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 44 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 58 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Town of Apex
Contacts1 person available
OfficeNC, USA
Organization / AgencyNorth Carolina → Town of Apex
Office AddressNC, USA
Contacts
Steve Maynard

Full Description

Show more
Town of Apex (Town) requests Statements of Qualifications (SOQs) from qualified engineering firms or consultant teams licensed to provide professional engineering services in North Carolina to develop a comprehensive stormwater Master Plan for the downtown residential core. The selected firm will evaluate existing drainage infrastructure, assess localized flooding vulnerabilities, and identify potential projects to mitigate risks and enhance water quality. The Town intends to select one Consultant for the overall project. Services may be authorized in phases, and the Town reserves the right to contract separately for portions of the work. Final scope, schedule, deliverables, and compensation will be established during contract negotiations. Interested firms are requested to email Jessica Bolin at Sign up to see this detail as soon as practicable to indicate their intent to submit. Include the firm name and the primary contact’s name and email address. This notice does not substitute for the required SOQ submission. Publication Date/Time: 10/12/2026 12:00 PM Closing Date/Time: 11/20/2026 2:00 PM Contact Person: Jessica Bolin, PE, CFM Stormwater Engineering Manager Sign up to see this detail Miscellaneous: Deadline to submit written questions Friday, November 6, 2026 by 12:00 p.m. ET Town responses to questions (anticipated) Friday, November 13, 2026 Statement of Qualifications Due Friday, November 20, 2026 by 2:00 p.m. ET Evaluation (anticipated) December 2026 Interviews (anticipated, if required) January 2027 Selection Announcement (anticipated) January 2027

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS