This Solicitation opportunity from Michigan was posted on October 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Michigan Department of Technology, Management and Budget (DTMB), on behalf of the Department of Natural Resources (DNR) Wildlife Division, is soliciting proposals for professional engineering services to conduct a Phase 100 evaluation of the Hancock Creek Dam in Dickinson County. This project is necessitated by a 2024 safety inspection that identified slope depressions and animal burrows, as well as a November 2025 failure of the inlet pipe connection. The selected contractor will be required to evaluate the current condition of the dam and embankment and develop a feasibility report comparing two primary options: the repair and modernization of the existing structure or a full replacement. Key deliverables include conceptual design and construction estimates at 50, 90, and 100 percent completion, along with preliminary cost information for Phase 500 budgeting.
This is a not-to-exceed fee, billable-rate contract. Proposals are due by 2:00 p.m. Eastern Time on October 15, 2026, and must be submitted via the SIGMA VSS portal. Evaluation is based on a weighted scale of 80 percent for the technical proposal and 20 percent for the cost proposal. The contractor must appoint a dedicated Project Manager to handle day-to-day operations and ensure compliance with all federal and state regulations, including EPA, OSHA, and EGLE standards. Payment will be processed monthly via Electronic Funds Transfer following the submission of certified payment requests. Bidders must certify their status as a Michigan-based business and provide a detailed, time-sequenced work plan as part of their submission.
General Info
Engineering services for Hancock Creek Dam evaluation, feasibility report, and design cost estimates.
DOWNLOAD, High priority: read this first4 pages · rfp
HighAI Summary for Hancock Creek Dam Evaluation Project Statement: A project statement from the State of Michigan DTMB for the MDNR Wildlife Division seeking professional services for a Phase 100 evaluation of the Hancock Creek Dam in Dickinson County. The scope includes evaluating the current condition of the dam and embankment, providing two options (repair/modernization vs. full replacement), and developing construction estimates. Proposals are due by October 15, 2026.
DOWN
DOWNLOAD, High priority: read this firstspecifications
HighAI Summary for Hancock Creek Wildlife Flooding Plans 1949: Technical engineering plans and specifications for the Hancock Creek Wildlife Flooding project, prepared by the Michigan Department of Conservation and Development Division of Natural Resources. The document includes location maps, bench mark data, dam site profiles, channel outlet and dike sections, and construction elevations for an earth dam and concrete control structure.
PDF
PDF, High priority: read this first63 pages · contract-document
HighAI Summary for Michigan Professional Services Contract Billing Rate Rev 04-25: This document is a Professional Services Contract issued by the State of Michigan Department of Technology, Management and Budget for architectural and/or engineering services. It authorizes the contractor to provide professional services for a specified project under a billing rate not to exceed a certain amount. The contract outlines the scope of work, compensation terms, and conditions including compliance with prevailing wage laws and project schedules. It emphasizes that no construction mechanics are required unless specified and that contract modifications must be in writing. The contract is effective upon execution by authorized representatives and includes provisions for public record disclosure under Michigan's FOIA. The version is indicated as Revision dated 04-25.
DOWN
DOWNLOAD, High priority: read this first19 pages · rfp
HighAI Summary for RFP 751/26442.JBB - Hancock Creek Dam Evaluation: Request for Proposals issued by the Michigan Department of Technology, Management & Budget (DTMB) for professional services regarding the Hancock Creek Dam Evaluation in Loretto, Michigan. The project involves Phase 100 (Study) and Phase 500 (Final Design). Proposals are due by October 15, 2026, at 2:00 p.m. ET via SIGMA VSS. Evaluation is based on a Technical Proposal (80%) and a Cost Proposal (20%). A mandatory pre-proposal meeting is scheduled for October 1, 2026.
DOWN
DOWNLOAD, Low priorityinspection-report
LowAI Summary for 2024 Hancock Creek Dam Safety Inspection Report: A dam safety inspection report for the Hancock Creek Dam (ID No. 88) conducted on August 5, 2024, and issued on February 10, 2025. The report evaluates the structural condition and hydraulic capacity of the dam per Michigan's Natural Resources and Environmental Protection Act. The dam is rated in 'Fair' condition with a 'Low' hazard potential. Key recommendations include filling upstream slope depressions and rodent burrows, annual vegetation maintenance, and monitoring seepage and spillway concrete cracks by December 31, 2026.
DOWN
DOWNLOAD, Low priority11 pages · permit
LowAI Summary for Hancock Creek Dam Drawdown Permit WRP047423: Emergency permit issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) on December 10, 2025, to the Michigan Department of Natural Resources. It authorizes the drawdown of the Hancock Creek Flowage by 6 inches per day to a maximum of 2 feet to mitigate the risk of dam failure. The permit is valid until December 10, 2030.
DOWN
DOWNLOAD, Low priority1 page · other
LowAI Summary for Hancock Creek Dam Forest Road Closure Checklist 2025: A Michigan Department of Natural Resources (DNR) administrative checklist (Form R4503) used to evaluate the closure of forest roads. The document assesses health/safety, recreational impact, land management, habitat conservation, environmental damage, and ADA compliance to determine if a road should be closed.
DOWN
DOWNLOAD, Low priorityother
LowAI Summary for Hancock Creek Dam Forest Road Closure Review 2025: A Forest Road/Trail Closure Review form from the Michigan Department of Natural Resources (Escanaba Management Unit) dated 11/19/2025. The document proposes a temporary road closure of the Hancock Creek WLD dam due to deteriorating infrastructure and a compromised control structure, as recommended by EGLE.
DOWN
DOWNLOAD, Low priorityinspection-report
LowAI Summary for Hancock Creek Dam Safety Inspection Report: A dam safety inspection report for the Hancock Creek Dam, conducted on June 12, 1991, and reported on February 19, 1992. The report, prepared by James T. Pawloski, P.E., concludes the dam is in good condition with a low hazard potential classification. Key recommendations include adding one foot of compacted fill for freeboard, removing brush and trees, replacing walkway deck boards and stoplogs, and developing a written Operation & Maintenance manual.
LowAI Summary for Hancock Creek Dam Safety Inspection Report: A dam safety inspection report for Hancock Creek Dam (ID 88) in Dickinson County, Michigan, dated February 11, 2000. The report evaluates structural condition and hydraulic capacity per the Natural Resources and Environmental Protection Act. The dam is rated as 'low' hazard and is generally in good condition, though the report recommends removing vegetation and debris and establishing a written Operation and Maintenance (O&M) Plan by the end of 2000.
LowAI Summary for Hancock Creek Dam Safety Inspection Report (1995): A dam safety inspection report for the Hancock Creek Dam (ID No. 00088) in Dickinson County, prepared by James T. Pawloski, P.E. for the Michigan Department of Natural Resources. Dated August 29, 1995, based on an inspection from October 25, 1994. The report evaluates structural condition and hydraulic capacity, concluding the dam is stable with no immediate failure risks, though it recommends adding one foot of compacted fill to the embankment and removing a log from the spillway.
DOWN
DOWNLOAD, Low priority17 pages · other
LowAI Summary for Hancock Creek Dam Safety Inspection Report (2019): A dam safety inspection report for the Hancock Creek Dam (ID No. 88) in Dickinson County, MI, conducted on June 25, 2019, and issued November 25, 2019. The report evaluates structural condition and hydraulic capacity per Part 315 of the Natural Resources and Environmental Protection Act. The dam is rated as having low hazard potential and is in satisfactory condition, with recommendations to monitor a depression near the spillway and cracks in the concrete inlet riser on a quarterly basis.
DOWN
DOWNLOAD, Low priorityother
LowAI Summary for Hancock Creek Dam Safety Inspection Report (Dam ID 88): A dam safety inspection report for the Hancock Creek Dam (Dam ID 88) in Dickinson County, Michigan, conducted on October 28, 2004, and issued on December 1, 2004. The report evaluates the structural condition and hydraulic capacity of the dam, concluding it is in good condition with a low hazard potential. Key recommendations include removing trees and brush from embankments, clearing logs from the spillway, and preparing a written Operation and Maintenance (O&M) Plan by January 31, 2005.
DOWN
DOWNLOAD, Low priority2 pages · permit
LowAI Summary for Permit 14-22-0015-P: Hancock Impoundment Drawdown: Issued September 5, 2014, by the Michigan Department of Environmental Quality (MDEQ) to MDNR Wildlife. The permit authorizes a temporary 6-foot drawdown of the Hancock Impoundment on Hancock Creek for the purpose of replacing stop logs, with specific drawdown/refill rates and compliance requirements under the Natural Resources and Environmental Protection Act.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.