Traffic Control & Roadway Restoration

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Yuba City focuses on traffic control and roadway restoration for the Feather River Outfall and Diffuser Project. The selected contractor will be responsible for implementing traffic control plans specifically for Garden Highway and performing necessary roadway rehabilitation following the installation of pipelines. To ensure safe traffic flow and the restoration of road surfaces, the contractor will utilize paving equipment, cones, and traffic signage. The project is categorized under NAICS code 237310 and will be performed in Yuba City, California. Interested parties must submit their responses by the deadline of December 11, 2026.

General Info

Place of Performance

Yuba City, CA, 95993, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-RFP-1156.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Feather River Outfall & Diffuser Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Feather River Outfall & Diffuser Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Yuba City
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs traffic management and restores roadways for prime contractors on the Yuba City Feather River Outfall and Diffuser Project. Implements traffic control plans for Garden Highway and performs roadway rehabilitation following pipeline installation. Utilizes traffic signage, cones, and paving equipment. Delivers safe traffic flow and restored roadway surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of Yuba City

Same awarding agency

NAICS: 237110
New
SLED
Feather River Outfall & Diffuser Project
Solicitation # 2026-RFP-1156
The Feather River Outfall and Diffuser Project, solicitation 2026-RFP-1156, is a wastewater infrastructure construction and rehabilitation project for the City of Yuba City, California. With a total estimated value of 10 million dollars, the scope of work includes the construction of a diffuser system featuring pile supports, header pipelines, riser extensions, and elastomeric check valve ports, as well as the installation of approximately two miles of 42-inch nominal diameter outfall pipeline. Key deliverables include the completion of pump stations, siphon buildings, and bifurcation stations, supported by 119 sheets of contract drawings and technical data from PG&E and MHM Incorporated. The project is funded via a State Revolving Fund loan and is subject to both Federal and State prevailing wage requirements, including the Davis-Bacon Act. Contractors must adhere to strict safety and compliance standards, including California Labor Code 6705 for trench safety, OSHA clearances for overhead power, and Government Code section 11135 regarding non-discrimination. Insurance requirements include a 2 million dollar general aggregate for general liability and 1 million dollar limits for automobile bodily injury and property damage. Technical specifications mandate the use of the 2025 California Building Code, ASTM A380 for metal passivation, and specific ASTM standards for mortar, grout, and concrete masonry units. Payment is processed through an Application for Payment reviewed by the Engineer, requiring proof of materials being free of liens.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS