Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Traffic Control & Signage Provider

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement establishes a partnership for the supply and installation of temporary traffic control devices on Caltrans highway projects. The provider is responsible for deploying active message signs via Portable Changeable Message Signs and implementing Type F Temporary Concrete Barriers. To ensure maximum highway safety, all barrier systems must be MASH Test Level 3 compliant and sourced from the Authorized Materials List. The project falls under NAICS code 238990 and is managed through the California Department of Transportation. Interested parties must submit their responses by November 18, 2026, to provide a fully installed traffic control system that meets all specified safety and operational requirements for prime contractors.

General Info

Subcontract for Caltrans traffic control devices and MASH compliant barriers by November 18, 2026.

Documents

This scope was carved out of 05-1K4514.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Landscape planting.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs temporary traffic control devices for prime contractors on Caltrans highway projects. Deploys Portable Changeable Message Signs (PCMS) and Type F Temporary Concrete Barriers. Utilizes MASH Test Level 3 compliant barrier systems from the Authorized Materials List for highway safety features. Delivers an installed traffic control system and active message signs.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
UC Botanical Garden Access Improvements - Phase 2 (Fountain Plaza) - REBID
Solicitation # 12044B
Solicitation 12044B is a lump-sum contract issued by the University of California, Berkeley, for the Phase 2 access improvements of the Fountain Plaza at the UC Botanical Garden. The project scope includes repaving and modifying the plaza, salvaging existing bricks for the owner, patching adjacent asphalt, and relocating existing furniture while installing new owner-provided furniture. A key deliverable is the construction of a concrete bench, with an add alternate for using pre-cast materials instead of cast-in-place concrete. The estimated construction cost for the project is 160,000 dollars. To be eligible for award, bidders must hold a current California A General Engineering Contractor license and be registered with the Department of Industrial Relations. Mandatory requirements include participation in the full pre-bid conference and site tour held on November 3, 2026. Bidders must submit a statement of experience on company letterhead documenting three to five comparable landscaping projects valued at 160,000 dollars or more, completed within the last five years in the nine Bay Area counties. Specifically, the contractor must demonstrate experience with a custom curved cast-in-place concrete bench and a curved concrete wall. Bids are due by November 16, 2026, via the BuildingConnected portal, and must comply with the UC Fair Wage of at least 15 dollars per hour and prevailing wage requirements.
University of California, Berkeley

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238990
New
SLED
El Segundo Recreation Park Phase 1 Improvement Project Teen Center And Teen Plaza
Solicitation # PW 25-13
The City of El Segundo is soliciting bids for the Recreation Park Teen Center and Teen Plaza Renovation Project (PW 25-13), located at 405 E Grand Ave, El Segundo, California. The project aims to create a safe and inviting environment for teenagers, featuring the construction of tutoring centers, art studios, game rooms, classrooms, and meeting rooms, along with supporting food service areas, restrooms, and office spaces. The scope also includes site improvements such as a skatepark with specific concrete requirements, sports equipment installation, landscaping, and ADA-compliant parking. Bids are due by December 9, 2026, and must be submitted in a sealed opaque envelope addressed to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder based on a combination of the lump sum base bid, unit prices, contractor delay damages, and accepted alternates. Awardees must provide a bid bond, performance and payment bonds, and certificates of insurance. The project is subject to California prevailing wage requirements and domestic sourcing standards, including the Buy American Act and Build America Buy America. Performance begins upon the issuance of a Notice to Proceed, with a required contract schedule submitted within fifteen days of the award. Payment will be made via monthly invoices within thirty-five days of receipt, subject to a five percent retention fee.
City of El Segundo

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS