Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Traffic Control & Work Zone Management

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with the State of California Department of Transportation involves providing temporary traffic control and safety management for prime contractors on Caltrans highway projects in Sacramento. The selected provider will be responsible for installing construction area signage, operating traffic control systems, and deploying specialized equipment including Automated Flagger Assistance Devices and Portable Changeable Message Signs to ensure a safe and compliant work zone. Qualified candidates must hold a Caltrans Traffic Control certification to perform the work under NAICS code 237310. The solicitation was posted on October 12, 2026, and requires a response by the deadline of November 5, 2026.

General Info

Traffic control subcontract for Caltrans Sacramento projects; requires certification; deadline November 5, 2026.

Documents

This scope was carved out of 03-3G5904.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Butte County At Various Locations

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides temporary traffic control and safety management for prime contractors on Caltrans highway projects. Installs construction area signs, operates traffic control systems, and deploys Portable Changeable Message Signs (PCMS) and Automated Flagger Assistance Devices (AFAD). Requires Caltrans Traffic Control certification. Delivers a safe, compliant work zone.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking a subcontractor for road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum project has an estimated value between $100,000 and $250,000. The scope of work includes the replacement of 62,500 square feet of asphalt across five specific areas, including the Guard Shack, Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas. Additionally, the contractor is responsible for repairing five storm sewer drain structures and patching five potholes using hot-mix asphalt, ensuring all work meets industry standards and proper drainage grades. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted using the MTC Bid for Lump Sum Contract form. To be considered, bidders must complete a mandatory physical site visit and provide a detailed cost breakout on company letterhead. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project must be completed within 90 consecutive business days following the Notice to Proceed. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and compliance with prevailing wage determinations. Payment is based on percentage of completion using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful punch list inspection and the submission of closeout documents, including a Notice of Final Completion and a Certificate of Release of Liens.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237310
New
SLED
Dove Landing Phase 1 Milling and Paving
Solicitation # PE-66276-NONST-2027-000000030
The City of Social Circle is soliciting bids for the Dove Landing Phase 1 Milling and Paving project located off Vine Circle in Social Circle, Georgia. The scope of work includes furnishing all materials, labor, tools, and equipment for contract milling and repaving at a 2-inch thickness, with 4-inch deep patch milling using 9.5mm Superpave Type 2 asphalt. Additional requirements include concrete curb and gutter replacement, driveway cut and repair using minimum 5-inch 3000psi concrete per GDOT Standard Spec 430, and up to 2,100 linear feet of permanent grassing. The contractor is responsible for roll testing the pavement subgrade after milling, with a maximum of three calendar days allowed between milling and resurfacing. A standard one-year warranty is required upon completion, and the project is intended for completion during the current season. Bids must be submitted to Robbie Groves at the City of Social Circle by 2:30 p.m. on Thursday, October 15, 2026, with a public opening following at 2:40 p.m. The bid packet must include a bid form, a notarized Contractor Affidavit verifying E-Verify compliance, and a bid bond for 5 percent of the total bid amount, though cash, cashier's checks, or irrevocable letters of credit are acceptable. An informational Certificate of Insurance is required at the time of bidding, while the awarded contractor must provide proof of workers compensation and liability insurance naming the City of Social Circle as an additional insured, along with performance and payment bonds equal to 100 percent of the contract price. The City reserves the right to waive informalities and award the project to the bidder deemed to be in the best interest of Social Circle within 45 days of the bid opening.
City of Social Circle

POSTED

about 16 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Butte County At Various Locations
Solicitation # 03-3G5904
Solicitation 03-3G5904 is a cost-plus-time construction project issued by the State of California Department of Transportation for work at various locations on Route 70 and Route 99 in Butte County. The project has an estimated value of 3,160,000 dollars and primarily involves furnishing and placing polyester concrete overlays and replacing joint seals. Performance must be completed within a bid duration of 50 to 70 working days. The contract is governed by the 2025 Standard Specifications and Standard Plans, with specific requirements for bridge removal, concrete compressive strength, and the use of vacuum attachments for abrasive blasting near traffic. Bids are due by November 5, 2026, and will be evaluated based on the total bid. To be considered responsive, contractors must hold a Class A license or a combination of Class C-8 and C-12 licenses and meet a 5 percent Small Business Enterprise participation goal. A 3 percent goal is also established for Disabled Veteran Business Enterprises. Special environmental and safety mandates include strict packaging and labeling for asbestos-containing materials, the submission of a public safety plan, and the use of ACI certified personnel for quality control. Award preferences are available for certified small businesses, providing a bid comparison reduction of up to 50,000 dollars or 5 percent of the low bidder's total.
Highway, Street, and Bridge Construction

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS