Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Sign Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Napa is soliciting bids to supply and install MUTCD-compliant street signs including stop, yield, and speed limit signs at designated intersections throughout the city. All signs must feature double-sided blue reflectors to ensure visibility and compliance with national standards. The work is to be performed exclusively within Napa, with no specified state or zip codes provided for the location of performance. This subcontract opportunity is open for responses until August 7, 2026, at 7:00 PM, with the solicitation posted on July 29, 2026. The NAICS code 238990 indicates that the work falls under other construction-related specialties, excluding building construction and heavy engineering projects. Bidders must ensure full adherence to MUTCD guidelines and deliver durable, reflectorized signage suitable for permanent outdoor installation in a public roadway environment.

General Info

Supply and install MUTCD-compliant, double-sided blue reflector street signs in Napa by August 7, 2026.

Place of Performance

Napa, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 30230810.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Citywide Striping - Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Napa
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Napa
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and install MUTCD-compliant street signs such as stop, yield, and speed limit signs with double-sided blue reflectors at specified intersections across Napa.

More opportunities from California → City of Napa

Same awarding agency

NAICS: 237310
New
SLED
Paving for Water Facilities and Leak Repairs 2026-1
Solicitation # 2026-IFB - PC-050
The City of Napa Utilities Department is soliciting bids for the Paving for Water Facilities and Leak Repairs 2026-1 project, identified as solicitation 2026-IFB-PC-050. With an estimated construction cost of 730,000 dollars, the project involves isolated pavement base repairs, specifically T-cuts over water line trenches, at various locations throughout the city. The scope of work includes approximately 20,000 square feet of base repairs, 13,000 square feet of two-inch mill and fill, traffic and pedestrian control, and the replacement of striping and markings using thermoplastic. All work must adhere to the City of Napa Standard Plans and Specifications of January 2022 and Caltrans 2026 Standards. Bids are due by November 12, 2026, at 2:00 pm via the OpenGov eProcurement system. To be eligible, bidders must possess a valid California contractor's license (A or C-12) and be registered with the Department of Industrial Relations. The contract will be awarded to the lowest responsive and responsible bidder. Required submission documents include a signed Bid Form, Noncollusion Declaration, Subcontractor List, and a bid security of 10 percent of the maximum bid amount. The successful contractor will be required to provide performance and payment bonds for 100 percent of the contract price, as well as a warranty bond for one year following project acceptance. The project is expected to begin around December 1, 2026, with a total completion timeline of 45 working days. Specific priority A locations must be completed by February 15, 2027. The contract includes liquidated damages of 1,500 dollars per day for delays. Compliance with California Labor Code prevailing wage requirements is mandatory. The City will perform acceptance testing of the Hot Mix Asphalt using the nuclear gauge method, and any failing materials must be replaced at the contractor's expense.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 hour
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS