Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Arizona was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRAFFIC SIGNAL VISIBILITY; 3 INTERSECTIONS, PHOENIX (RSAP/HSIP TRAFFIC SIGNAL VISIBILITY 3 LOCATIONS)

Closed
ST89320171State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 21 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The project focuses on safety enhancements at three key intersections in Phoenix: Jesse Owens Parkway and Baseline Road, 7th Street and McDowell Road, and Cave Creek Road and Greenway Parkway. Work will be conducted within the existing footprint of each intersection to modernize traffic signal systems with new equipment, including flashing yellow arrows for left-turn movements and upgraded pedestrian signal components. Additional improvements involve installing ADA-compliant curb ramps and targeted crosswalk illumination to enhance pedestrian visibility and accessibility. These upgrades aim to reduce conflict points, improve signal clarity for drivers, and create safer, more inclusive crossing conditions for all users. The solicitation for this project is numbered ST89320171 and was posted on July 16, 2026, with a response deadline of August 11, 2026. It is managed by the Arizona Department of Design and Construction Procurement under a state and local government agency (SLED) type. The project is headquartered in Phoenix, Arizona, and all work must be performed locally at the specified intersections. For inquiries, contact Sadie Thompson, Contract Specialist I, via phone at 602-534-1509 or email at sadie.thompson@phoenix.gov. The initiative is part of broader regional efforts to improve intersection safety through infrastructure modernization funded under traffic signal visibility programs.

General Info

Modernize traffic signals and add ADA ramps at three Phoenix intersections to enhance safety and accessibility.

Agency

Arizona → Design and Construction ProcurementView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(4)

ST89320171-1 Final Plans for Traffic Signal Visibility Project

PDFcontract-document

City of Phoenix Traffic Signal Visibility 3 Intersections IFB ST89320171

PDFifb

ST89320171 Traffic Signal Visibility 3 Intersections Phoenix IFB

PDFifb

City of Phoenix Project Addendum No. 1

DOC2 pagesamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA
Organization / Agency
Arizona → Design and Construction Procurement
View Agency Profile
Office AddressPHOENIX, AZ, 85003, USA
Contacts
Sadie ThompsonContract Specialist I

Interested Companies (18)

Show more
Utility Construction
Queen Creek, AZ
William Charles Construction
Rockford, IL
Asuse
Tempe, AZ

See All 18 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The scope of work for this project consists of safety improvements at three intersections implemented within each existing intersection's footprint: Jesse Owens Parkway and Baseline Road, 7th Street and McDowell Road, and Cave Creek Road and Greenway Parkway. The project includes modernization of the traffic signal system by installing new signals, incorporating flashing yellow arrows for left-turn movements, and upgrading pedestrian signal equipment. Additional improvements include upgrading of ADA-compliant curb ramps, and targeted crosswalk illumination to improve pedestrian visibility. These enhancements are intended to increase overall intersection safety by improving signal visibility, reducing conflict points, and providing safer, more accessible pedestrian crossings. The project includes modernization of the traffic signal system by installing new signals, incorporating flashing yellow arrows for left-turn movements, and upgrading pedestrian signal equipment. Additional improvements include upgrading of ADA-compliant curb ramps, and targeted crosswalk illumination to improve pedestrian visibility. These enhancements are intended to increase overall intersection safety by improving signal visibility, reducing conflict points, and providing safer, more accessible pedestrian crossings.

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS