Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trail Repair Services - U.S. Army Corps of Engineers, Savannah District

Closed
W912HN26S0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and over 35 buildings, requiring the contractor to provide all labor, equipment, and materials for mowing, string trimming, edging, and cleanup. Turf must be maintained between 3 and 4 inches in height, and any identified deficiencies must be corrected within 48 hours at no additional cost. The contract consists of an initial one-year term with options for four additional one-year renewals, contingent upon funding and satisfactory performance. This is a small business set-aside opportunity open to various SBA-certified categories, including VOSB, SDVOSB, WOSB, and HUBZone small businesses. Award will be granted to the responsible offeror who is technically acceptable and provides the lowest price. Technical acceptability requires evidence of Kentucky state registration and licensure, verification of eligibility via the SAM portal, and the submission of a detailed technical proposal, safety program, and equipment list. Contractors must adhere to the Federal Acquisition Regulation and Davis-Bacon Act labor standards, including the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Additionally, contractors must provide proof of insurance and the ability to secure performance and payment bonding. All quotes must be submitted electronically to the designated purchasing email by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 561730
New
MI 2026-10 Landscaping Services
Solicitation # MI 2026-10
Adams and Associates, Inc., operating on behalf of the U.S. Department of Labor, is soliciting bids for landscaping services at the Miami Job Corps Center in Florida. The scope of work involves the maintenance of a 15-acre lot, including lawn cutting for the school front and outer perimeter, weed killer treatment for planting beds and sidewalks, bush trimming, and the maintenance of baseball and volleyball fields. The period of performance is scheduled from November 1, 2026, to October 31, 2027. Bids must be submitted by October 23, 2026, and will be evaluated based on the most responsible bidder rather than the lowest cost alone. Eligible vendors must be registered in SAM.gov with a valid Unique Entity ID and possess all necessary business and employee licenses for the State of Florida. Required bid documentation includes a vendor questionnaire, W9, Authority to Commit, and a list of references for those without prior experience with the Center. Contractors must maintain comprehensive general liability insurance of $1,000,000 per occurrence, along with workers compensation and automobile liability insurance. The contract is subject to the Service Contract Act and Davis-Bacon Act, requiring adherence to specific wage determinations and payroll submission for service incidents exceeding $2,500. Additionally, personnel must comply with strict security protocols, including searches and a no-fraternization policy with students. Payment terms are NET 30 days from the date of invoice.
Miami Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for designated lots in Nespelem and Omak, Washington. The scope of work requires the contractor to provide all necessary labor, equipment, and transportation to perform grass cutting, weed and vegetation control, and the removal of loose garbage and abandoned materials. Additionally, the contractor is responsible for the decommissioning and removal of designated products, equipment, and fixtures, ensuring all waste is transported to authorized disposal or recycling facilities in compliance with local, state, and federal regulations. A final site inspection is required to ensure properties are left in a clean, safe, and orderly condition, with a mandate to immediately report any discovered hazardous or contaminated materials. Proposals must be submitted by 3:00 p.m. PST on November 5, 2026, and should not exceed 30 single-spaced pages. Evaluation is based on a 100-point scale considering reliability, effectiveness, and budget, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. The contract term is for an as-needed period of up to three years, subject to yearly tribal appropriations and funding availability. Selected contractors must provide proof of insurance, professional resumes for key personnel, and a certification regarding debarment and suspension. Furthermore, contracts exceeding 100,000 dollars require a performance bond; otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 6 hours ago

DEADLINE

in 16 days

General Info

NAICS

561730 - Landscaping Services

Place of Performance

Clarks Hill, SC, 29821, USA

Set-Aside

SBA

Documents

1

Bartram Trail Bridge Inventory and Restoration Attachments

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more

SOURCES SOUGHT NOTICE


Trail Repair Services


U.S. Army Corps of Engineers, Savannah District


This is a Sources Sought Notice issued in accordance with FAR Part 10. The purpose of this notice is to conduct market research to identify potential sources and industry capabilities that will inform the development of the forthcoming solicitation. This notice does not constitute a solicitation, request for proposal, or commitment by the Government. No contract will be awarded from this announcement.


This Sources Sought Notice is issued solely for information and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. Responses are not offers and will not be accepted by the Government to form a binding contract. Respondents are responsible for all costs incurred in responding to this notice.


This commercial service acquisition will be awarded on a Firm-Fixed-Price (FFP) basis. This is a 100% Small Business Set-Aside conducted under FAR Part 13, Simplified Acquisition Procedures.


PROJECT OVERVIEW


The U.S. Army Corps of Engineers (USACE), Savannah District, anticipates issuing a solicitation for the following requirement:


Requirement: Procurement of trail repair services for 19.61 miles (103,518 ft) of damaged trail on the Bartram Trail located within South Carolina and Georgia within the J. Strom Thurmond Dam and Lake Project Area. Trail repair shall consist of clearing and re-establishing the tread (Walking Surface), marking the trail, repairing or replacing 11 foot bridges, and repairing minor creek crossings.


Address: J. Strom Thurmond Dam and Lake, 510 Clarks Hill Highway, Clarks Hill, SC 29821


Delivery Schedule: Contractor shall conduct mobilization, demobilization, and trail repair at the J. Strom Thurmond Project as specified in this PWS within the period of performance (POP). Contractor shall provide project start dates within 14 days of issuance of contract award.


The POP shall be for 180 DAYS FROM DATE OF AWARD OF CONTRACT


Scope of Work:


  • Trail Corridor Clearing: The contractor will remove trees, brush and other obstacles within the established trail corridor. The current corridor is 4-8 feet wide and 10 feet high. The trail will be cleared to a width of not less than (NLT) 60" for all terrain. Clearing heights of all trail construction should be NLT 10'. Any additional clearing should be kept within the already cleared bounds.
    • All trees and small brush that are in the actual tread of the trail will be grubbed out and removed 2" below bare soil to avoid dangerous stabs and tripping hazards in the trail. The contractor should not flush cut trees with the bare soil. No tree over 4" in diameter will be cut without prior approval from the COR. All trees and brush, which extend over the trail, should be cut at or below ground level, without leaving any sharp edges that could be hazardous. Trees next to the trail need not be grubbed.
    • All waste materials from trees and brush will be pulled a minimum of 10 feet away from away from the trail.
    • Tread Repair: The trail tread should be repaired or re-established down to bare mineral soil. The finished trail will be free from organic material except as approved by the COR, where building through the organic layer is not desired for environmental or other reasons. The repaired tread should be between 18" and 24" in width. The full bench construction method will be employed on all side hills greater than 15%. The back slope should be properly angled at no greater than 60% on all sections of the full bench trail. The tread should out slope a minimum of 3-5%. The tread shall be free of all stubs. Waste materials from the tread construction must be blended into the natural environment in a manner which does not create noticeable debris piles. Waste materials will not be placed in a manner that would create a berm on the low side of the trail or impede drainage of the trail.
  • Trail markings: The contractor will re-mark the trail corridor by painting yellow paint hatches 4 ½' - 5' above the ground, 4" X 8" in size. Hatches will be painted on the right sides of the trail for each direction of travel every 75"- 100'. Marking should be minimal along the trail as required to provide adequate trail sight line identification. Any present existing marked tree should be repainted.
    • Yellow carsonite posts will be placed every 1/2 mile along the main trail. The contractor will place brown stickers on each post indicating the distance marked.
    • White carsonite posts will be utilized on the Lake Springs Loop portion of the trail marking every 1/2 mile.
    • Yellow carsonite posts with stickers will be placed at each trailhead or crossing. Stickers on the yellow carsonite posts at trailheads or crossings will indicate trail direction, hiking and bikes only, no motorized vehicles or horses.
  • Minor Creek Crossings: The contractor will remove any debris located within minor creek crossings. Concrete brick or similar material will be placed in each minor creek crossing to establish a satisfactory surface for walking and riding non-motorized bicycles across the crossing.
  • Foot Bridges: 11-foot bridges as outlines in attachment 2 will be repaired or replaced depending on the severity of the damage to each. Foot bridges will be repaired or replaced with treated lumber. Boards for the walking surface will be spaced to provide drainage of water. A suitable cloth material will place, covered with chicken wire, and secured on the walking surface. All foot bridges will be properly anchored and secured so in a manor that establishes a satisfactory and safe crossing.
    • Bridge Abutments (As Required): Contractor shall prepare abutments foot bridge-sites locations (two abutments per site), as required. Clear all obstructive debris, stumps and roots in an area 8 ft. wide X 10 ft. long. Abutment areas shall be graded as necessary and left level. Upon completion of each abutment, the disturbed ground shall be covered with a grass-seed to reduce erosion.

REQUIREMENT DETAILS


  • Construction Waste Materials: All non-degradable material will be removed from the trail.
  • Contractor shall be responsible for correcting any violation notices, complying with all environmental laws, and repairing any damage caused by their operations to public or private property, including landscaping.
  • Contractor shall provide all labor, equipment, materials, and services for operations which includes, but not limited to, repair of the tread (walking surface), bench cut repairs, foot bridge repairs, and water crossing repairs.
  • Contractor shall coordinate delivery schedules with the COR to minimize disruption to park visitors and operations.
  • All work shall be accomplished in a safe manner in accordance with the EM 385-1-1 dated 15 March 2024 and OSHA standards.
  • The contractor shall be duly licensed in accordance with the city’s, state’s, and county’s statutory requirements to perform the work.
  • All trucks and equipment must comply with all applicable federal, state, and local rules and regulations to include USACE EM 385-1-1.


NAICS CODE & PSC


NAICS Code: 561730 - Landscaping Services


PSC: S208 - housekeeping- landscaping/groundskeeping



SUBMISSION REQUIREMENTS


Interested firms are invited to submit a capability statement that includes the following information:


  • Company name, address, point of contact, phone number, and email
  • Business size and socio-economic status (Small Business, 8(a), HUBZone, SDVOSB, WOSB, etc.) under the applicable NAICS code
  • Description of relevant experience providing performance-based services for trail restoration
  • Ability to meet the delivery schedule and logistical requirements
  • Feedback or recommendations that may assist the Government in refining the solicitation (e.g., delivery methods, quality assurance, industry standards)

RESPONSE INSTRUCTIONS


Responses shall be submitted electronically in PDF format to:


Brasier, Stephanie A CIV USARMY CESAS (USA) Stephanie.Brasier@usace.army.mil


CC Gaeth, Paul R A09 MSG SAS Paul.R.Gaeth@usace.army.mil


Subject line: Sources Sought Response – Trail Repair Services, USACE Savannah District


Due Date: 11 Feb 2026


This Sources Sought Notice is issued solely for information and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. Responses are not offers and will not be accepted by the Government to form a binding contract. Respondents are responsible for all costs incurred in responding to this notice.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 541620
New
Federal
Requirement to support the Formerly Used Defense Sites (FUDS) Program Single Award Task Order Contract (SATOC)
Solicitation # W912HN-27-S-1001
The United States Army Corps of Engineers Savannah District is conducting market research for a Single Award Task Order Contract (SATOC) to provide comprehensive Environmental Consulting Services (ECS) in support of the Formerly Used Defense Sites (FUDS) program. Under NAICS code 541620, the selected contractor will provide program management, administrative, logistical, and community relations support for the South Atlantic Division. Key responsibilities include maintaining the FUDSMIS database and FUDS Documents portal, developing Project Management and Site Management Action Plans, coordinating Cost-to-Complete estimates, and managing community outreach activities such as Restoration Advisory Board meetings and the creation of Section 508-compliant materials. All task orders under this contract will be performance-based in accordance with FAR 37.6 and FAR 37.102, utilizing a tailored Quality Assurance Surveillance Plan (QASP). The prime contractor must possess a Facility Clearance (FCL) and ensure personnel complete required OPSEC and Controlled Unclassified Information training. Additionally, personnel performing IA/IT services must comply with DoD 8570.01-M certifications. Deliverables must be uploaded to government-controlled platforms to prevent vendor lock-in. Interested respondents must submit their business identification, size status, and corporate structure via the provided survey link by November 18, 2026.
Environmental Consulting Services

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract under NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small control tower, a small arms range operations control area, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, latrine pads, and various building information systems. Supporting infrastructure requirements include electric service, site improvements, cybersecurity measures, and sustainability and energy measures. The period of performance is 720 calendar days following the notice to proceed. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, and offerors must maintain active registration in the System for Award Management (SAM). Technical requirements emphasize rigorous standards for underground electrical distribution, telecommunications outside plant infrastructure, and the installation of metal roof and wall panels. Key deliverables include facility records for roofing systems and a comprehensive spare parts list for telecommunications. Acceptance of work is contingent upon successful testing in accordance with NETA ATS and RUS Bull 1753F-201 standards, with specific manufacturer warranties required for metal wall panels.
Commercial and Institutional Building Construction

POSTED

about 9 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
Federal
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging Select Sites
Solicitation # W912HN27S5000
The Savannah District Corps of Engineers is conducting a sources sought market research effort to identify capable contractors for the FY26 Atlantic Intracoastal Waterway maintenance dredging project. The scope of work involves unclassified dredging at Hell Gate and Florida Passage in Chatham County, Georgia, and Fields Cut in Jasper County, South Carolina. The project requires dredging to an authorized width of 150 feet and a depth of 12 feet, with an estimated total removal of 265,000 cubic yards of material. Dredged sediment will be transported via pipeline or alternative methods to beneficial use sites or confined upland containment areas, with some transport distances reaching up to 9 miles. The estimated magnitude of this requirement is between 5 million and 10 million dollars, falling under NAICS code 237990 with a size standard of 45 million dollars. The expected duration of performance is 165 days from the notice to proceed. Contractors must demonstrate capabilities in hydraulic cutterhead dredging, island shaping to specific slopes, and the use of low ground pressure or aquatic equipment for soft foundations. Additionally, the government is seeking evidence of experience operating in environmentally sensitive areas, managing high vessel traffic, and working within tidal cycles featuring flows up to 4 feet per second. Responses must be submitted via PIEE by November 20, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS