This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern AZ
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract is for the rehabilitation of RV camping pads and associated utility infrastructure across multiple work centers on the Kaibab National Forest in Northern Arizona, with a primary focus on eleven pads at the Tanglefoot Work Center and Tusayan Ranger Station, and optional work to extend improvements to thirteen additional pads at Jacob Lake and Big Springs Work Centers. The base scope includes clearing overgrown pads, subgrade preparation, gravel placement and compaction, replacement of water and sewer connections, limited replacement of water and sewer lines, and upgrading electrical service pedestals to include dedicated 20-, 30-, and 50-amp weatherproof receptacles in lockable enclosures mounted at least three feet above grade. Mandatory deliverables include brown and blue marker posts, as-built drawings marked in red, a submitted Quality Control Plan approved in writing prior to work commencement, and digital copies of manufacturer literature for all materials. Optional work encompasses subsurface utility locating, septic system inspection and replacement, propane line installations for 24 pads, and additional utility line upgrades. The contract is a firm-fixed price solicitation with a total small business set-aside under NAICS code 237110, and only small businesses certified under the SBA size standard of $45 million in revenue may respond. All proposals must include pricing for every line item, including optional scopes, and must acknowledge Amendment 0001. Proposals must be submitted as sealed envelopes by 12:00 Noon Mountain Time on May 28, 2026, to the designated address or via email to Melissa Heckenlaible. The contract requires strict compliance with federal labor standards including prevailing wage rates under the Davis-Bacon Act, payroll recordkeeping, apprenticeship requirements, and Copeland Act protections. Contractors must provide bid, performance, and payment bonds, with the latter two due within 10 days of the Notice to Proceed. Performance must begin within 10 calendar days of the Notice to Proceed and be fully completed, including cleanup, within 220 calendar days. Technical proposals must demonstrate the ability to meet the Schedule of Work, with failure to address any unachievable requirement leading to rejection. Evaluation will be based on technical responsiveness, acceptable past performance, and fair and reasonable pricing, with award going to the highest technically rated offeror without tradeoffs. The contractor must maintain comprehensive records of all inspections and tests, and all materials must be delivered in original manufacturer packaging with labels intact. Compliance with Buy American provisions, anti
General Info
Agency
NAICS
Place of Performance
Flagstaff, AZ, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
*****UPDATE AS OF 5-22-2026 10:40AM MOUNTAIN TIME*****
THE REQUEST FOR INFORMATION (RFI - QUESTIONS AND RESPONSES) IS POSTED AS AN ATTACHMENT.
ANY CONTRACTOR WISHING TO SUBMIT A PRICE QUOTE MUST ACKNOWLEDGE THE AMENDEDMENT 0001 SOLICITATION WITH THEIR PRICING PACKAGE.
TITLE OF NEWLY UPLOADED AMENDMENT DOCUMENT WITH RFI: "AMENDMENT_127EAX26Q0017_0001"
*******************************************
Trailer pad utility upgrades and improvements for the North Kaibab and Tusayan Ranger Districts - Housing & Utility upgrades (on-site housing for firefighters and staff).
This project will consist of the rehabilitation of eleven (11) RV camping pads, six (6) at the Tanglefoot Work Center and five (5) at Tusayan Ranger Station. Pad rehabilitation consists of clearing overgrown pads; subgrade preparation, new gravel placement and compaction for parking pads; replacement of water and sewer connections; limited replacement of water and sewer lines; and replacement of electrical components on existing electrical service pedestals.
This project also includes optional work items for the rehabilitation of an additional thirteen (13) RV pads, eight (8) at Jacob Lake Work Center and five (5) at Big Springs Work Center; subsurface utility locating; television inspection and flow testing of an existing septic system; replacement of septic tank and leach field; replacement or installation of propane lines and connections for twenty-four (24) RV pads; and additional water and sewer line replacement.
More opportunities from Department Of Agriculture → Csa Southwest 7 Usda-Fs
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS