Transformer Refurbishment and Maintenance

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Energy → Western Sierra Nevada RegionView Agency

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 89503326QWA000417.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Transformer Refurbishment

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Western Sierra Nevada Region
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs core technical refurbishment of the KY3A transformer for prime contractors on WAPA power plant projects. Re-gaskets the unit, repacks all radiator valves, pulls a 12-hour vacuum, and performs vacuum filling with 20 post passes. Uses OEM-specified gaskets and vacuum filling systems. Complies with OEM specifications and 40 U.S.C. chapter 37 safety standards. Delivers a fully refurbished and operational transformer.

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
1089 – Cafeteria freezer #1 & Cooler #4 Replacement
Solicitation # 26-137
This subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, involves the full removal and replacement of Cafeteria Freezer #1 and Cooler #4. Freezer #1 requires replacement due to significant frame and door damage causing freeze-ups, while Cooler #4 must be replaced due to an inoperable unit, a sagging ceiling, and drainage backups. Additionally, the project includes correcting the exit door of the main Electrical Room to ensure compliance with NEC 2020 110.26.C (3) by installing panic hardware and ensuring the door opens toward the egress. The work must adhere to all state and local codes, EPA and OSHA regulations, and the Davis-Bacon Act WD # IN20260002. Bids must be submitted as a single lump sum with a detailed cost breakdown and a timeline for substantial completion by September 11, 2026. Attendance at the mandatory site visit on September 3, 2026, is required for consideration. Award will be based on best value rather than the lowest price. Qualified offerors must provide a valid Indiana Contractor's License, proof of specific automobile and workers' compensation insurance, and a 90-day bid guarantee. The contractor is required to provide a sequenced construction schedule within 10 days of the Notice to Proceed and must provide all training, manuals, and keys as a prerequisite for final acceptance. A one-year guarantee of workmanship and manufacturer warranties are required upon substantial completion.
Adams & Associates, Inc.

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details
NAICS: 811310
New
Replace Ice-machine in café
Solicitation # 26-138
Adams & Associates, Inc., on behalf of the U.S. Department of Labor, is soliciting a single lump sum contract for the full removal and replacement of a non-functional ice maker at the Atterbury Job Corps Center in Edinburgh, Indiana. The existing unit requires replacement due to a failed evaporator coil and other internal component failures. This is a small business set-aside solicitation under NAICS code 811310. A mandatory site visit was scheduled for September 3, 2026, and only vendors who attended this conference are eligible to bid. Proposals are due by September 11, 2026, at 3:00 PM. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Selected contractors must hold a valid Indiana Contractor's License and provide proof of automobile liability and workers' compensation insurance, naming Adams and Associates, Inc. as an additional insured. The project requires strict adherence to Davis-Bacon Act wage determinations, EPA and OSHA regulations, and state of Indiana codes. Deliverables include a fully operational ice maker, a one-year workmanship guarantee, manufacturer warranties, and all relevant operating manuals. Work must commence within 14 days of the Notice to Proceed, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

NAICS: 811310
New
Federal
Transformer Refurbishment
Solicitation # 89503326QWA000417
Solicitation 89503326QWA000417 is a firm fixed-price request for quote issued by the Western Area Power Administration under the Department of Energy for the refurbishment of the KY3A transformer at the Corning Power Plant in Red Bluff, California. This procurement is a total small business set-aside under NAICS 811310. The scope of work involves the refurbishment of a 10,000/12,500 kVA three-phase unit manufactured by Hevi-Duty Electric, with specific maintenance requirements including a full re-gasket of the unit, repacking all radiator valves, and pulling a vacuum on the unit for 12 hours. All work must adhere to original equipment manufacturer specifications, FCC regulations, and applicable federal, state, and local laws. The period of performance is scheduled from October 1, 2026, to October 31, 2026. The government will award the contract based on a tradeoff analysis to determine the best overall value, evaluating price, technical offering, proposed schedule, and past performance. Offerors must submit a quote on company letterhead, a signed SF 1449, and a technical volume demonstrating compliance with the Performance Work Statement via email to the contracting officer. Key deliverables include a safety and health plan, a spill prevention and cleanup plan, and a detailed work schedule. Additionally, contractors must comply with California Department of Food and Agriculture and CARB vehicle labeling requirements, ensuring equipment identification numbers are clearly visible on vehicles. Labor must be compensated according to the Department of Labor Service Contract Act wage determination for the relevant California counties.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

3 days ago

DEADLINE

in 4 days
View Details
NAICS: 237130
Federal
COTP Series Capacitor Two-Phase Design Build
Solicitation # Spec. No. 1108
The California Oregon Transmission Project (COTP) Series Capacitor Bank Replacement is a firm-fixed-price, two-phase design-build construction project managed by the U.S. Department of Energy's Western Area Power Administration. The project involves the engineering, procurement, and construction of four 525kV series capacitor banks at the Maxwell Capacitor Switching Station and the Tracy, Olinda North, and Olinda South substations. With an estimated magnitude exceeding 80 million dollars, the project requires the replacement of existing banks with in-kind units, with a final completion deadline of June 30, 2033. The procurement process utilizes a best-value tradeoff approach, where a qualification phase identifies up to five offerors based on corporate experience, technical competency, and past performance before proceeding to a final selection phase focusing on technical solutions, key personnel, and price. Key contractual requirements include the submission of performance and payment bonds within 10 days of award and strict adherence to federal prevailing wage determinations for Colusa, Shasta, and Alameda counties. The contract includes specific provisions for liquidated damages related to delays in returning capacitor banks to service and allows for equitable adjustments due to import tariffs imposed starting in 2026. Security is a primary focus, requiring comprehensive background checks for all personnel and approved Technology Acquisition Justifications for any equipment interfacing with the WAPA network. All invoicing must be processed electronically through the Treasury's Invoice Processing Platform, and the contractor is responsible for ensuring all equipment is sourced through authorized channels to prevent counterfeit parts.
Power and Communication Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 25 days
View Details