Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transit Bus Fueling or Charging Infrastructure Support

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors connecting Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The project requires adherence to industry standards, manufacturer specifications for cable tension and bend radius, and local codes. Bids must be submitted by September 30, 2026, and must include a completed Mandatory Bid Document with a clear bid price and authorized signature. The contractor must hold a valid state license for general contracting and maintain all necessary builder's risk and liability insurance. Performance is subject to a pre-construction meeting to approve a construction timeline, with standard work hours from 8:00 AM to 3:00 PM, Monday through Friday. Final acceptance is contingent upon the submission of a closeout package including OTDR and optical loss test results, polarity verification, and as-built documentation. Payment will be issued as a single lump sum upon project completion and the provision of required purchasing documents.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Dallas Area Rapid Transit is seeking a subcontractor to install and maintain electric vehicle charging or compressed natural gas fueling infrastructure to support its bus operations. The contract is classified under NAICS code 237130 for utility system construction and is open for bids with a response deadline of July 7, 2026. The work will involve the full lifecycle support of fueling or charging systems, including design, installation, testing, and ongoing maintenance to ensure reliable operation for DART’s transit fleet. Performance is expected to occur within Texas, though specific locations are not outlined. This opportunity is structured as a subcontract and does not include set-aside designations or specific point of contact details. Interested parties must submit proposals through the BonfireHub portal prior to the deadline.

General Info

Install and maintain EV or CNG fueling infrastructure for DART buses in Texas by July 7, 2026.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2099926.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NEW, DELECTRIC MOTORIZED DRIVE DERAIL OPERATOR | 2099926

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and maintenance of electric vehicle charging or CNG fueling infrastructure supporting DART’s bus operations.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Tile and Terrazzo Contractors

POSTED

17 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS