This Combined Synopsis/Solicitation opportunity from Bbg United States Agency For Global Media was posted on May 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transmission Line Pole Maintenance, Edward R. Murrow Transmitting Station - Greenville, NC

Closed
951700-24-R-0150Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221122
New
Federal
BFSU Electricity Services
Solicitation # 75H70927BAO_002
The Department of Health and Human Services, Billings Area Indian Health Service, has issued a Sources Sought notice under solicitation 75H70927BAO_002 to identify capable vendors for the BFSU Electric Utility Services project. The requirement involves providing continuous electric utility services to the Blackfeet Service Unit, Government quarters, and the Heart Butte Clinic in Montana to support critical life-saving equipment and 24/7 patient care operations. The anticipated period of performance consists of a twelve-month base year starting January 1, 2027, with four subsequent twelve-month option years, contingent upon funding availability. This opportunity is designated as a Buy Indian Set-Aside, prioritizing Indian Economic Enterprises (IEE) and Indian Small Business Economic Enterprises (ISBEE) in accordance with the Buy Indian Act. To qualify as an IEE, a business must be at least 51 percent owned by Indians, Federally Recognized Indian Tribes, or Alaska Native Corporations, with at least 51 percent of contract earnings accruing to these entities and management controlled by Indians. Interested vendors must submit a capability statement and the Buy Indian Act Indian Economic Enterprise Representation Form to the designated point of contact by November 6, 2026. Responses must specifically demonstrate the firm's ability to meet IEE definitions and provide evidence of relevant experience in utility services.
Billings Area Indian Health Svc

POSTED

3 days ago

DEADLINE

in 12 days
NAICS: 221122
New
Federal
BIL – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES
Solicitation # DE-FOA-0002736
The Department of Energy, through the National Energy Technology Laboratory and the Grid Deployment Office, is offering formula grants to States and Indian Tribes under solicitation DE-FOA-0002736 to enhance electric grid resilience against disruptive events such as natural disasters, wildfires, and extreme weather. The program focuses on implementing resilience measures, including the use of microgrids and battery-storage subcomponents. Funding is expected to be approximately 459 million dollars annually over a five-year period from fiscal year 2022 to 2026, with an initial performance period of five years that may be extended up to ten years. Eligible applicants must provide a program narrative detailing their subaward criteria and methods, as well as a resilience project package and quarterly monitoring reports. Award priority is given to projects providing the greatest community benefit in rural or urban areas, with specific requirements to ensure a fair percentage of funds reach small utility distributions selling no more than 4 million megawatt hours annually. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages on construction work exceeding 2,000 dollars, Buy America mandates for iron, steel, and manufactured products, and alignment with NERC CIP and NIST cybersecurity frameworks. Administrative costs are capped at 5 percent of the total federal grant allocation. Applications must be submitted via FedConnect by February 18, 2027, and must include a Unique Entity Identifier from the SAM.
National Energy Technology Lab

POSTED

5 days ago

DEADLINE

in 4 months
NAICS: 221122
New
SLED
FIRM ELECTRICITY SUPPLY SERVICES
Solicitation # 3162-27
The New Hampshire Department of Administrative Services is soliciting bids under RFB 3162-27 for a certified Competitive Electric Power Supplier to provide firm electricity supply services. The procurement follows a two-phase evaluation process where bidders are first assessed on qualification criteria—including quality, reliability, and coordination of service per RSA 21-I:17-b—and subsequently evaluated on pricing for those who qualify. The contract is for a firm fixed, full-requirements supply with an estimated start date of November 1, 2026, and pricing requests cover 12, 24, and 36-month terms. One specific account group, PG1 Eversource Group 2, has an estimated annual usage of 6,775,357 kWh. The successful vendor must be registered to conduct business in New Hampshire, be in good standing with the Secretary of State, and maintain certification with the New Hampshire Public Utilities Commission. Compliance with NEPOOL, ISO New England, and Local Distribution Company requirements is mandatory. Administrative terms include payment via ACH or Procurement Card within 30 days of invoice receipt, with single billing by the LDC being acceptable. The agreement is governed by Chapter Adm 600 Procurement and Property Rules and NH RSA Chapter 91-A. Bids are due by October 27, 2026, and must be submitted electronically to the Bureau of Purchase and Property.
Department Of Administrative Services

POSTED

5 days ago

DEADLINE

in 3 days
NAICS: 221122
New
Federal
36-Month Electrical Distribution Testing
Solicitation # 36C24727Q0044
Solicitation 36C24727Q0044 is a firm-fixed-price requirement issued by the Department of Veterans Affairs Network Contracting Office 7 for the inspection, testing, adjustment, calibration, preventive maintenance, and infrared thermographic scanning of electrical distribution equipment. This total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) covers three Georgia locations: the Joseph Maxwell Cleland Atlanta VA Medical Center, the Fort McPherson VA Clinic, and the Trinka-Davis Veterans Village Clinic. The scope includes a wide array of assets such as distribution panelboards, transformers, switchboards, and automatic transfer switches, with all work required to adhere to ANSI/NETA MTS, NFPA 99, NFPA 110, and OSHA standards. The project is a single, non-recurring action requiring all field work to be completed within 240 calendar days of the Notice to Proceed, with a final consolidated report due within 270 days. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process. To be deemed technically acceptable, offerors must demonstrate at least five years of experience in healthcare or industrial facilities and provide certified technicians, including a Level II certified thermographer. Companies must either be NETA Accredited or provide an objective equivalent, including a documented quality-assurance program and test instruments calibrated within the last 12 months. Key deliverables include a proposed work schedule and phasing plan due within 14 days of the Notice to Proceed, the application of durable adhesive test labels to all serviced assets, and detailed engineering service reports. The scope specifically excludes arc-flash labeling, study-level engineering, and internal UPS service.
247-NETWORK Contract Office 7 (36C247)

POSTED

5 days ago

DEADLINE

in 3 days

General Info

Contract Value

$0

NAICS

221122 - Electric Power Distribution

Place of Performance

Grimesland, NC, 27837, USA

Set-Aside

NONE

Award Issued Date

Documents

2

USAGM RFP 951700-24-R-0150 Amendment P00001 Q&A

PDF, High priority: read this firstamendment
High

USAGM RFP 951700-24-R-0150 Transmission Line Pole Replacement IDIQ

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBbg United States Agency For Global Media → Office Of Contracts
Contacts2 people available
OfficeWASHINGTON, DC, 20237, USA
Office AddressWASHINGTON, DC, 20237, USA
Contacts
Tisa Harvin Contracting Officer
Rodney Nelson Contract Specialist

Full Description

Show more
SECTION B SCHEDULE OF SERVICES ALL PROSPECTIVE OFFERORS ARE ENCOURAGED TO READ AND UNDERSTAND THE ATTACHED REQUEST FOR PROPOSALS IN ITS ENTIRETY PRIOR TO RESPONDING TO THIS SOLICITATION. This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Contract (hereinafter "Contract") between the U.S. Agency for Global Media (hereinafter referred to as the "USAGM"), an entity of the Government of the United States of America, with its headquarters located at 330 Independence Avenue, SW, Washington, DC, 20237, U.S.A. and (TBD) (hereinafter "Contractor"). This requirement consists of the following components: (1) Standard Maintenance that addresses annual schedule for the replacement of defective transmission line poles; and, (2) Non-Standard Maintenance to include: (a) Unscheduled/Emergency pole replacement activities, and, (b) Emergency Services to repair fallen or sagged transmission lines. Acquisition Authority: This acquisition is conducted under the authority of the Federal Acquisition Regulation (FAR) Subpart 13.5 - Simplified Procedures for Certain Commercial Items and FAR Part 12 - Acquisition of Commercial Items. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-04; dated 05/01/2024. To view the latest Federal Acquisition Circulars (FAC) go to https://www.regulations.gov. Contract Term: The contract term is for a period of performance beginning June 01, 2024 through May 31, 2029 to include five (5) Ordering Periods of one year each. Task/Delivery Orders (TO/DOs) may be issued at any time during the five year ordering period. The performance period will be specified in each TO/DO and may extend beyond the IDIQ period of performance expiration I order to complete the TO/DO. Contract Type: This is an IDIQ contract, Task Order/Delivery Order awards issued against this contract will be placed using the procedures described in Section G, Contract Administration Data. The types of Task Orders (TO) or Delivery Orders (DO) issued against this contract will be awarded on a Firm Fixed Price (FFP) basis in accordance with Federal Acquisition Regulation (FAR) 16.5, Indefinite-Delivery Contracts, and also as set forth in Section G, Contract Administration Data, and Section I, Contract Clauses. The performance periods will be specified in the TO/DOs and may include an extension beyond the IDIQ period of performance expiration date by six (6) months. SUMMARY OF SERVICES The contractor shall provide qualified manpower having specialized knowledge, skills, and aptitudes to perform maintenance routines on high powered shortwave transmission line systems to include: (1) replacement of transmission line poles varying in heights between 25 to 35 feet; (2) repair transmission line sections that have fallen, sagged, or broken; (3) operate standard utility equipment such as line boom trucks, manlift devices, and tensioners; and, (4) comply with all Federal, State, and local safety regulations to ensure maximum protection of personnel and equipment. The Contractor shall manage and supervise all aspects of labor necessary to satisfy the requirements set forth in this contract. Descriptions of required services are contained in Section C and associated attachments. All work shall be performed in accordance with the terms and conditions of this contract and safety rules set forth by the station Chief Engineer and Safety Officer. Safety of personnel and quality workmanship are an integral part of this contract. STANDARD SERVICES The primary component of this contract is the firm-fixed-price component for the contractor's provision of scheduled maintenance services as defined Section C. The firm-fixed-price includes all work, including furnishing all labor and services - unless otherwise specified. The price shall include all labor and overhead (including cost of Workers Compensation and required insurance). The Government will provide all materials and supplies required for Standard Services. Use of Government equipment may be accommodated based on availability and prior approval by the station Contracting Officer Representative (COR). Station historically has replaced 35 to 50 poles each year. Standard Services include transmission line pole replacement activities based on an annual assessment and schedule provided by the station. The station will conduct an annual assessment of transmission line poles. Replacement requirements shall be provided to the contractor no later than 15 May. Contractor shall coordinate scheduling for the performance of pole replacement activities within 30 days of receipt of annual requirements. NON-STANDARD SERVICES Non-Standard Services, or emergency services, are generally corrective repairs by the Contractor to restore station program operations or maintain field conditions predicated on a failed transmission line delivery system and/or pole replacement activity not identified on the annual inspection report covered under standard services routines. PRICES/COSTS All TO/DOs issued will be subject to the pricing set forth in IDIQ Pricing Tables. The rates set forth in the IDIQ Pricing Table reflect all fully-burdened direct labor hours. The fully-burdened labor rates include all direct labor and indirect costs applicable to that direct labor (such as fringe benefits, overhead, G&A), and profit. In any case, proposed rates for TOs/DOs shall not exceed the ceiling rates established in the contract. Any labor categories and rates proposed for a TO/DO that are not established in the IDIQ contract shall be incorporated within the master IDIQ contact upon approval by the USAGM Contracting Officer, prior to a TO/DO award. The USAGM will pay the Contractor a fixed price for Standard Maintenance pole replacement services that have been satisfactorily performed. The USAGM will also pay the Contractor for all itemized Non-Standard services ordered by the Government for satisfactorily completed work. Transmission line repairs shall be priced per incident based on span of repairs and reasonable time and materials (T&M) as determined by Non-Standard services for emergency pole replacement shall be priced as a fixed offset price from standard services replacement pricing. SERVICE CONTRACT ACT (SCA) AND DEPARTMENT OF LABOR WAGE DETERMINATIONS This IDIQ Contract will be subject to the Service Contract Act (SCA) and Department of labor Wage Determinations (WDs) (Federal Acquisition Regulations 22.1006, 22.1007 and 22.1008). The SCA applies to every contract entered into by the United States or the District of Columbia, the principal purpose of which is to furnish services in the United States through the use of service employees. Contractors and subcontractors performing on such Federal contracts must observe minimum wage and safety and health standards, and must maintain certain records, unless a specific exemption applies. Every service employee performing any of the Government contract work under a service contract in excess of $2,500 must be paid not less than the monetary wages, and must be furnished fringe benefits, which the Secretary of Labor has determined to be prevailing in the locality for the classification in which the employee is working or the wage rates and fringe benefits (including any accrued or prospective wage rates and fringe benefits) contained in a predecessor contractor's collective bargaining agreement. The wage rates and fringe benefits required are specified in the SCA wage determination included in the contract. If no wage determination has been made applicable to the contract, employees performing work under the contract must be paid not less than the federal minimum wage provided in section 6(a)(1) of the Fair Labor Standards Act (reference https://www.dol.gov/whd/regs/compliance/hrg.htm). All provisions of the SCA except the safety and health requirements are administered by the Wage and Hour Division. Geographical Areas Covered Under SCA The SCA applies to all work performed within the United States. For purposes of the SCA, the term "United States" includes any State, the District of Columbia, Puerto Rico, the Virgin Islands, Outer Continental Shelf lands as defined in the Outer Continental Shelf Lands Act, American Samoa, Guam, Wake Island, Johnston Island, and the Commonwealth of the Northern Mariana Islands. The SCA does not apply to work performed in any other territory under the jurisdiction of the United States or any United States base or possession within a foreign country. Also, the SCA does not apply to work performed on ships operating in international or foreign waters. If a portion of the contract services is performed within the United States and a portion is performed outside the United States, the SCA applies to the portion performed in the United States. The minimum wage rates and fringe benefits applicable to the first twelve months of the contract period are outlined in the applicable U.S. Department of Labor Wage Determinations (WDs) for Pitt County, North Carolina. (Attachment J.1) Wage determinations are available at: https://beta.sam.gov SECTION C DESCRIPTION/SPECIFICATION/STATEMENT OF WORK C.1 CONTRACT REQUIREMENTS C.1.1 Introduction (a) The Contractor will furnish equipment, tools, transportation, services, labor, and other items which may not be specifically cited that are required for Standard Services to include annual transmission line pole replacement, and Non-Standard Services to include (1) emergency replacement of transmission line poles and (2) repair to transmission line delivery systems. Work to be performed at the Edward R. Murrow Transmitting Station B-Site facility located at 3919 VOA Site B Road, Grimesland, NC (Near Blackjack, NC). (b) C.5 provides specific guidance regarding the execution and deliverables by the Contractor. C.1.2 General Requirements (a) Contractor shall use only OSHA approved equipment and observe safety procedures to ensure that contract and potentially affected employees are safeguarded at all times. Prior to any work on transmission lines, Contractor shall verify that line has been properly de-energized, grounded, and locked out. (b) All work shall be performed during normal business hours from 7:00 AM to 4:30 PM, Monday through Friday unless otherwise approved by the authorized Contracting Officer's Representative (COR) (c) The Government shall provide all materials to include: replacement poles, cross arms, hardware for cross arm refit, insulators as required, sand, and all miscellaneous hardware i.e., screws, bolts, nuts, etc. Contractor shall provide standard materials of the trade to include ropes, leveling devices, hand and power tools, grips, etc. (d) All replacement poles shall be located in the station's 'pole yard'. Contractor shall provide for all transportation and equipment to move the poles to the specific work area. (e) Contractor shall be liable for any damage to Government Furnished Equipment and/or transmission line poles and insulators that is directly attributable to contractor misuse of equipment or worker negligence during a repair activity. (f) Work shall be performed on a single transmission line only. After inspection and acceptance of all work associated with the transmission line by the station COR, subsequent transmission lines may be addressed. (g) When performing work in the antenna fields, all contractor personnel shall wear RF personal monitors. Monitors to be furnish by the Station. Contractor shall be responsible for all issued monitors and shall be liable for any damage or loss of the monitoring devices. (h) Should RF levels exceed permissible levels at the work site, contractor shall ensure that all personnel are removed from the detected areas until levels are restored to safe working conditions. (i) Prior to commencement of work activity, Contractor and COR shall discuss specific procedures related to each configuration and common practices for pole and cross arm replacement. (j) Contractor equipment shall be stored in designated areas only. Equipment shall not be stored in the antenna fields unless specifically stated by the COR. (k) Contractor shall be responsible for the removal of all waste and debris from the facility to include defective poles, wood members, replaced hardware, and other work related waste. As appropriate, Contractor may use station waste container for small item disposal. C.2 SCOPE OF WORK C.2.1 Standard Services (a) Standard services include all labor, equipment, and transportation for the replacement of wooden transmission line poles. The station maintains approximately 1800 wooden transmission line poles to provide delivery of broadcasts from the transmitter facility to the antenna structures. Traditionally, the station replaces 30 to 50 poles each year as part of a regular preventative maintenance program. (b) Contractor shall be provided a list, (see Attachment J.2 for current year list), no later than May 15th of each year during the contract period to define the specific scope required for the annual pole replacement activity. (c) Station shall mark/tag each pole identified for replacement. (d) Contractor, in conjunction with the station COR, shall coordinate a schedule for the mobilization of contractor and priority and schedule for each transmission line run. Schedule shall be coordinated to ensure that the replacement of all defective poles is accomplished by September 30th of the applicable year. (e) There are nine (9) different pole configurations employed for the transmission line delivery systems. (1) Type 1, 30 foot, Single Mast Cross Arm Type 1, 30' Single Mast Suspended Hanger (2) Type 2, 25 foot, Single Mast Crossarm Type 1, 30' Single Mast Overhead Suspension (3) Type 3, 30 foot, Single Mast Feedline Type 3, 30 Foot Pole, Feed Line (4) Type 4, 30 foot, Dual Mast Termination Line Type 4, 30 Foot Dissipation Line (5) Type 5, 30 foot, Termination Line End Pole Type 5, 30 Foot Dissipation Line End Pole (6) Type 6, 35 foot, Cross Feed Type 6, 35 Foot Pole, Cross Feed (7) Type 7, 30 foot, Turn Pole Type 7, 30 Foot Pole, Turn Pole (8) Type 8, 30 foot, Cradle Pole Type 8, 30 Foot Pole, Cradle Pole (9) Type 9, 30 foot, Brace/Tension Pole Type 9, 30 Foot Pole, Brace/Tension Pole C.2.2 Non-Standard Services Non-Standard services include all labor, equipment, and transportation for (1) the replacement of wooden transmission line poles not specifically addressed within Standard Services annual schedule and (2) repair of transmission lines and insulators that have fallen, sagged, or broken. Contractor shall be notified by telephone for all Non-Standard/emergency service requirements. Contractor shall be required to respond to the COR within 24 hours to discuss the requirement. Based on the severity and impact of the requirement, the COR and Contractor will coordinate mobilization times. Mobilization to the facility for all Non-Standard services shall NOT exceed 72 hours from the COR and Contractor initial discussion. (a) Pole Replacement Pole replacement activities addressed under non-standard services require similar work efforts as defined for standard services, however, generally call for enhanced response from the contractor and/or unplanned mobilization to fulfill repair requirements. In the event that an emergency pole replacement requirement is discovered during regular mobilization of standard services, the replacement shall be considered an amendment to the standard service requirements and replacement performed at Standard Service pricing. Station shall provide all poles. cross arms, insulators, and specialized hardware required to facilitate pole replacement activities. (b) Transmission Line Repairs Contractor shall be required to provide all labor and equipment required to repair transmission lines that have sagged or fallen due to insulator or pole failures. All transmission line repairs are subject to inspection and approval by the COR and operational verification by the transmitter plant prior to acceptance of repairs. (c) Transmission Pole Removal In the event that an unused transmission line pole breaks or falls, the station, based on the operational use of the transmission line system may elect to have the pole removed rather than replaced. Typically, pole removal shall include transmission line cleanup activities as specified in C.2.2(d) below. Contractor shall secure transmission lines to adjacent poles to prevent further transmission line failure, remove the defective pole, and backfill the vacated hole. Depending on the nature of pole failure, COR and contractor shall coordinate for best method, i.e., cutting the pole below ground level or pulling entire pole. (d) Transmission Line Removal/Cleanup In the event that an unused transmission line breaks or falls, the station, based on the operational use of the transmission line system may elect to have the transmission line affected spans removed rather than repaired. In the event that removal is elected by the station, the contractor shall secure transmission lines at appropriate points to prevent further damage to the transmission lines. Contractor will cut transmission lines at the secured points, and remove fallen span/s from the antenna field. Contractor will clean the affected area from any broken insulators, metal parts, and debris. For 50kW single lines, contractor shall dispose of all wire and associated debris, for 500kW lines, contractor shall disassemble copper tubing and messenger lines. Contractor shall cut copper tubing into lengths of no greater than 15 feet and store within a designated location as specified by the COR. Contractor shall dispose of remaining materials to include: wire, clamps, and other associated hardware and debris. Station shall provide suitable work area for the contractor personnel for the disassembly of transmission lines as required. C.3 QUALITY ASSURANCE C.3.1 Contractor Qualifications Licensed firm with minimum of five (5) years experience in: the electrical/utility trade, antenna tower and feed line construction, or other related construction activity that required use of technical and mechanical disciplines associated with line pole replacement. C.3.2 Contractor Personnel Qualifications (a) Contractor shall provide/assign a lead employee possessing a journeyman skill level with a minimum of five years experience in the disciplines associated with construction and safety principles involving elevated work. Lead employee will be on site at all times during maintenance activities. (b) All Contractor employees shall be proficient in the use of equipment and basic hand tools required in the performance of the repair activities. C.4 SAFETY AND HEALTH C.4.1 General Safety Requirements (a) The Contractor shall comply with such health, safety, fire protection and reporting requirements as may be prescribed by the COR or federal or state regulations. (b) The Contractor shall take precautions to protect all U.S. Government and utility company property from damage while performing the work. The Contractor is especially cautioned to avoid either personnel or equipment contact with overhead transmission lines, line poles, towers and tower bases, grounding or guy wires, and guy wire anchors. (c) The Contractor shall promptly report to the COR any incidents or damage to government or utility company property, no matter how slight the damage may appear, in order to judge if immediate repairs are required. (d) The Contractor shall take all steps necessary to prevent its employees from setting fires during performance of work under this contract. The Contractor shall immediately report all fires in accordance with station regulations and local laws, and shall attempt to extinguish and/or contain fires until adequate fire fighting equipment and personnel arrive. (e) The contractor shall comply with all requirements for Non-Ionizing Radio Frequency safety as specified in ANSI C.95.1-1999 and station policies and procedures relating to RF safety in the antenna fields. Contractor shall be briefed by the ARCO regarding local RF Safety Plans and areas of concern during normal operations. The IBB shall provide the Contractor with RF Personal Protection Monitors, as necessary, for use during on-site performance of work. C.4.2 Code Of Federal Regulations (CFR) - 29 CFR 1926 Construction Standards (a) Personal Protective Equipment (b) Fall Protection (c) Elevated Work Platforms (d) General Safety (e) Hand Powered Tools C.5 GOVERNMENT FURNISHED EQUIPMENT AND MATERIALS C.5.1 Materials (GFM) The Government shall provide all materials to include: replacement poles, cross arms, hardware for cross arm refit, insulators as required, sand, and all miscellaneous hardware i.e., screws, bolts, nuts, etc. C.5.2 Equipment (GFE) (a) The station makes no guarantee regarding the serviceability of equipment afforded to the contractor for use under this contract, but strives to maintain all equipment in operational condition at all times. Contractor shall be responsible to provide all driver/operator resources for all GFE equipment. All contractor personnel that will be driving Govt. vehicles shall possess a valid driver's license. (b) Contractor shall be liable for any damage to GFE that is attributable directly to contractor abuse, misuse, or negligence on behalf of the operator. (c) As required by the contractor, the Government shall make available the station GMC rigging truck for pole and transmission line replacement and repair activities. Contractor shall ensure that all operators are competent on boom, bucket, and boring operations. (d) As required by the contractor, the Government shall make available the station Dodge Ram with platform lift for pole replacement and transmission line repairs. Contractor shall ensure that all operators are competent and aware of safety operations. C.6 EXECUTION C.6.1 Pole Replacement (a) Pole Storage and Disposal The Station shall stage all new poles in a common area. Contractor shall be responsible for transport of all poles to the specific work site. Removed poles shall be moved to a centralized location as identified by the COR and subsequently removed from the facility by the contractor. (b) Preparation Prior to any pole work, Contractor shall ensure that the associated transmission line has been de-energized, grounded and locked out. Prior to pole removal, contractor shall measure and record cross arm/s heights to ensure correct replacement on new pole. Contractor shall install safeties on each adjacent pole to provided additional stress relieve for worksite cross arm assembly. (c) Pole Removal and Replacement Contractor shall remove existing pole and preserve original hole. New pole shall be inserted into existing hole and leveled. New pole shall be compacted/sunk using a minimum of 3000 lbs of downward force and backfilled and tamped with provided sand material. Cross arms shall be reinstalled to predetermined heights and secured with new hardware. Contractor shall ensure that all installed lines maintain a straight path between adjacent pole transmission line runs and that all loaded insulators are perpendicular with minimal lateral tensions. Poles shall be trimmed at top for a maximum 6 extension above the upper cross arm. (d) Cleanup And Disposal Contractor shall remove all debris from the facility or on-site container. C.6.2 Transmission Line Repairs (a) Apply safety ties on support insulators closest to problem area on both sides of problem area. (b) If line is disconnected from a termination at the antenna or at a turn pole, reconnect the line at that point. (c) Pick up the line and affix it to each cross arm end points with ropes. Starting in the center of the downed span, work each side from center dividing the remaining sections in half until the entire length of the line is suspended. (working from one end to the other will cause the dog-legs and insulators to be misaligned) (d) Replace the broken insulators making sure that the insulators hang vertical. Repair any broken joints using silver solder, solder any broken joints in the copper tubing and tubing to dog-leg connections. (e) Replace any bent or damaged equal potential clamps maintaining the original spacing. If any clamps are loose they should be removed and re-arched to ensure that when installed they make firm contact with the cable and the tubing. (f) Adjust the tubing so that it hangs straight down from the cable and has minimal waviness. Straighten the tubing as required to achieve a neat appearance. (g) Remove all rope ties before returning the line to service. (End of Section C) ALL PROSPECTIVE OFFERORS ARE ENCOURAGED TO READ AND UNDERSTAND THE ATTACHED REQUEST FOR PROPOSALS IN ITS ENTIRETY PRIOR TO RESPONDING TO THIS SOLICITATION.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS