Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND0025068 - Asphalt Concrete Pavement and Other Work

Closed
AB-2026-02287International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signals and lighting, along with environmental support through storm water pollution prevention. Required materials include precast concrete, ready mix supply, manhole materials, and various valves and fittings. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certified entities. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. A critical requirement is that subcontractors and material contractors must provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44
Solicitation # 27-B-17JD, C2103
The County of Volusia, Engineering and Construction department, is soliciting bids for the Beresford Avenue Extension Phase 2B project, identified as solicitation number 27-B-17JD, C2103. This infrastructure project involves the new construction of Beresford Avenue, extending the roadway from approximately 1,100 feet east of Kepler Road to the intersection of SR 44 and Summit Avenue, as well as the realignment of 1,600 feet of Summit Avenue. The scope of work includes the creation of two 11-foot travel lanes in each direction with 6-foot paved shoulders, roadside ditches, drainage structures, and a 12-foot concrete trail on the south side. All pavement markings must be thermoplastic and adhere to FDOT standard plans. The estimated construction cost for this project is 4,911,975.00 dollars. The contract will be awarded to the single lowest responsive and responsible respondent based on criteria including business location, financial resources, technical experience, and past performance. Bids are due by December 1, 2026, and must be accompanied by a bid bond of at least five percent of the bid amount. The project is subject to liquidated damages of 2,529.00 dollars per day for failure to meet delivery dates. Payment terms are set at thirty days from the receipt of undisputed invoices, with funding limited to the budget approved by the Volusia County Council. The contractor is responsible for all quality control sampling and must comply with ADA and civil rights regulations.
Engineering & Construction

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 13 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract calls for the construction and paving of roadways in Alberta’s Peace Region, specifically from Highway 43 to 14 kilometers east of it and from Highway 665 to Highway 669, covering a total length of nearly 46 kilometers. The work includes supplying and placing approximately 39,540 tonnes of EPS Mix Type M1 asphalt concrete pavement and 40,040 tonnes of aggregate, as well as adding 500 tonnes of gravel surfacing. Other tasks involve asphalt surfacing, application of roadway lines for directional dividing and edge markings along over 30 kilometers, and the installation of milled rumble strips on both shoulders and centerlines totaling around 48 kilometers. Tender submissions are to be emailed by 2:01 PM on April 28, 2026, to the designated government email, with inquiries directed to the Project Procurement Officer Kenneth Adagala. The contractor is responsible for providing all necessary materials, and the project’s completion due date is October 15, 2026. This solicitation is issued by the Government of Canada’s Transportation and Economic Corridors office, with all procurement communications centralized through Alberta Transportation.

General Info

Construct and pave 46 km of Alberta roads with asphalt, aggregate, markings; complete by October 15, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kenneth AdagalaContracting Authority

Full Description

Show more
Tender available date: Wednesday March 18, 2026 Tender closing date: Tuesday April 28, 2026 Project Inquiries: Kenneth Adagala, Project Procurement Officer, Alberta Transportation E-mail: contact@example.gov TENDERS will only be received by email at contact@example.gov, before 2:01:00 P.M., for construction of the following work: TND0025068 Asphalt Concrete Pavement and Other Work 665:02 Hwy 43 to 14 Km E of Hwy 43 kilometre 0.000 to 14.450 747:01 Hwy 665 to Hwy 669 kilometre 0.000 to 15.897 Peace Region APPROXIMATE QUANTITIES: 40 040 tonnes Supply of Aggregate – With Option 39 540 tonnes Asphalt Concrete Pavement – EPS Mix Type M1 (PG 52-34 500 tonnes Gravel Surfacing Des. 4 Class 25 110 cubic metres Asphalt Surfacing 30.28 kilometres Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 31.44 kilometres Milled Rumble Strip - Shoulder 16.99 kilometres Milled Rumble Strip - Centreline Contractor to supply all materials. Contract Completion Date: October 15, 2026.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS