Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Travers Creek Bridge Replacement On E. Manning Avenue

Closed
20260722009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 17 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The project involves the replacement of the structurally deficient two-lane Travers Creek Bridge on E. Manning Avenue near Reedley, California, with a new four-lane bridge designed to accommodate two travel lanes and a total width of 77.5 feet and length of 64.5 feet. The new structure will be constructed using precast, prestressed concrete voided slabs with a concrete deck, supported by concrete abutments and Cast-In-Drilled Hole piles. Ancillary work includes reconstructing 1,144 feet of asphalt concrete approach roadways, installing concrete barriers and guardrails, establishing drainage swales and roadside pipes, and implementing comprehensive erosion control measures. Specific safety hardware, including the Lindsay Universal TAU-M Crash Cushion and Road Systems Inc. MFLEAT flare end terminals, are mandated with no substitutions permitted. All work must comply with the 2023 Caltrans Standard Specifications, County of Fresno standard drawings, and MASH TL-2/TL-3 safety standards for temporary and permanent crash cushions. The contractor is required to perform at least 30% of the work in-house using direct employees, comply with Buy America provisions, and adhere to Davis-Bacon prevailing wage requirements with certified payroll records retained for three years. The contract is administered under the County of Fresno’s Department of Public Works and Planning, with payment and oversight managed through the California Department of Transportation’s Office of Contract Administration in Sacramento. Financial reporting obligations include submission of Exhibit 9-P for payment reporting, Exhibit 15-G and Exhibit 10-02 for accounting and federal aid data, and Optional Form WH-347 for certified payroll. DBE participation goals under 49 CFR Part 26 are required, and contractors must document good faith efforts to meet these targets, with annual compliance certificates due between March and June. EEO and ADA compliance are mandatory, extending to subcontractors, with requirements to avoid discrimination in hiring, promotion, and pay across protected categories. Bids are evaluated on a Lowest Price Technically Acceptable basis, with proposals submitted either electronically via Bid Express or as hardcopy sealed envelopes. The bid deadline is August 20, 2026, and the solicitation number is 20260722009. The contract contains no federal FAR clauses, instead relying on state-specific modified sections for surveying, change orders, and construction areas. All specified materials and equipment must be procured without substitution, and inspections

General Info

Replace Travers Creek Bridge with four-lane structure, install crash cushions, guardrails, and roadway upgrades in Fresno County.

Agency

California → County Of FresnoView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fresno, CA, 93721, USA

Set-Aside

NONE

Documents

(3)

26-01-C Specifications for Travers Creek Bridge Replacement

PDFspecifications

Federal Bridge Replacement Project Travers Creek Bridge Plans

PDFplans

26-01-C Notice to Bidders - Travers Creek Bridge Replacement

PDFnotice-to-bidders

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County Of Fresno
Contacts3 people available
OfficeN/A
Organization / Agency
California → County Of Fresno
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #26-01-C: The project involves the removal and replacement of the structurally deficient two-lane Travers Creek Bridge on E. Manning Avenue (Bridge No. 42C-0175 / 42C) near Reedley, approximately 0.6 miles west of Alta Avenue. The new bridge will accommodate four lanes, striped for two, with a width of 77.5 feet and length of 64.5 feet. The structure will consist of precast, prestressed concrete, voided slab with a concrete deck supported on concrete abutments and Cast-In-Drilled Hole piles. Additional work includes installing concrete barriers, a guardrail system, and channel slope protection. The project also requires reconstructing 1,144-feet of asphalt concrete approach roadways, re-striping pavement, installing drainage swales and pipes at roadsides, and implementing erosion control measures on disturbed areas. Specific barrier systems (Lindsay Universal TAU-M Crash Cushion) and flare end terminals (Road Systems Inc. Flare End Terminal Type MFLEAT) are specified with no substitutions allowed.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS