Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Trinity Independent Church Rehabilitation Project - Bell Tower Reconstruction

Closed
26015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
Federal
NCR-NAMA: HOLDING CELL DOOR REPAIR
Solicitation # 140P3026Q0039
This firm-fixed-price purchase order, issued by the National Park Service under the Department of the Interior, is a total small business set-aside under NAICS 238190. The project involves the reinforcement of four holding-cell doors at the USPP District 1 Substation in Washington, DC. The contractor is required to install eight 1/4-inch thick stainless-steel plates, two per door, using continuous full-perimeter Metal Inert Gas welding to protect the lower glass areas. The scope includes field verification of dimensions, surface preparation by removing paint to expose sound metal, installation of the plates, and complete site restoration to ensure no residue remains in the active police facility. The contract follows a Lowest Price Technically Acceptable (LPTA) award basis, requiring a feasible approach to welding, hot-work control, and cleanup. Performance must commence within 10 calendar days and be completed within 30 calendar days after the notice to proceed. Key requirements include the submission of an accident-prevention and hot-work plan, evidence of welder qualifications, and compliance with Davis-Bacon Act wage determinations. Final acceptance is contingent upon the doors passing functional tests for movement, locking, and tamper-resistance, with all work inspected by the Contracting Officer's Representative. Invoicing must be processed electronically through the Invoice Processing Platform.
Washington Contracting Office

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 238190
New
Federal
Supply & installation of metal guardrails & handrails for a U.S Mission Residence in Marseille.
Solicitation # 19FR6326Q0098
The US Embassy Paris is soliciting a firm-fixed price contract for the supply and installation of metal guardrails and handrails at the US Consulate General residence garden in Marseille, France. The project requires the fabrication of carbon steel railings with hot-dip galvanizing and powder coating suitable for marine environments, adhering to both US and French building codes, including IBC 2024 and Eurocodes. The contractor must hold a valid Qualibat certification for structural and architectural metalwork and provide a minimum 10-year anti-corrosion warranty. Performance is mandatory, with work beginning within 20 calendar days of award and completion required within 90 calendar days. Eligible offerors must be registered in the System for Award Management and possess a permanent business address and telephone listing in France. Technical requirements include at least five years of experience with five similar projects and the provision of an English-speaking supervisor on site. Award will be granted to the lowest priced, acceptable, and responsible quoter. Proposals must be submitted electronically in English by September 10, 2026. Payment will be made monthly based on the value of labor and materials completed and in place, with a modified prompt payment period of 30 days.
US Embassy Paris

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 238190
New
SLED
Vallejo Home Complex Exterior Preservation and Fire HardeningThe California Department of Parks and Recreation is seeking a contractor for the Vallejo Home Complex Exterior Preservation and Fire Hardening project at Sonoma State Historic Park in Sonoma, California. This effort focuses on critical preservation repairs and fire resiliency upgrades to protect the buildings and their internal collections. The scope of work is divided by structure, with the Vallejo Home requiring exterior preservation including the repair of historic wood, restoration of carved eave trim, siding, porches, and dormers, and the installation of bird-deterrent measures following an assessment of woodpecker damage. The Hermitage and Delirio buildings will undergo roof replacement and fire hardening, which includes removing failing wood shingles, repairing framing and sheathing, and installing Class A fire-resistant roofing, ember-resistant vents, and fire-resistant underlayment. Across all structures, the project includes general envelope protection measures such as sealing penetrations, flashing upgrades, drainage corrections, and enhanced weatherproofing. All work must be performed in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties and the 1995 Guidelines for Preserving Rehabilitating Restoring And Reconstructing Historic Buildings by Weeks And Grimmer. This project is categorized as a forecast under NAICS code 238190 and has been granted a Notice of Exemption under CEQA Section 15331 for the restoration of historical resources. The primary point of contact for this effort is Environmental Coordinator Caitlin Powers.
California Parks and Recreation, Department of

POSTED

2 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The Trinity Independent Church Rehabilitation Project focuses on reconstructing the bell tower of the historic Trinity Independent Church, located at 84 Bridge Street, St. Augustine, Florida. Built in 1913, the church is a significant contributing structure within the Lincolnville National Register Historic District and is currently in urgent need of structural stabilization and repair. The bell tower, having been dilapidated for many years, is the primary focus of this initial phase of a multi-phase rehabilitation effort aimed at preserving the building's historical integrity. This project is funded by the City of St. Augustine Community Redevelopment Agency through the Lincolnville Community Redevelopment Area Institutional Rehabilitation Grant Program. The solicitation for this contract was posted on May 27, 2026, with a response deadline of July 1, 2026. The work will be performed in St. Augustine, Florida, and the contract is managed by the city's Community Services agency. Primary contacts for the project include Jaime Perkins, Neighborhood Services and CRA Manager, and Danielle Falkner, Procurement Specialist III. The goal of this phase is to enhance the structural soundness of the bell tower while maintaining its historic characteristics.

General Info

Rehabilitation of Trinity Church bell tower in St. Augustine funded by city redevelopment agency.

Agency

Florida → Community ServicesView Agency

NAICS

238190 - Other Foundation, Structure, and Building Exterior ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(4)

Architecture Trinity Phase 1 Tower Site Plan

PDFsite-plan

Draft Construction Agreement - City of St. Augustine

PDFcontract-document

Structural Notes and Roof Framing Plan for Trinity Phase 1 Tower

PDFspecifications

Trinity Independent Church Rehabilitation Project - Bell Tower Reconstruction RFB 26015

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Community Services
Contacts2 people available
OfficeSt. Augustine, FL, 32084, USA
Organization / Agency
Florida → Community Services
View Agency Profile
Office AddressSt. Augustine, FL, 32084, USA
Contacts
Jaime PerkinsNeighborhood Services and CRA Manager
Danielle FalknerProcurement Specialist III

Interested Companies (22)

Show more
Sun State Nursery and Landscaping
Jacksonville, FL
Ketom Construction Co. Inc. dba Southern Preservation Systems
Loganville, GA
NEFI Services, Inc. (Surety & Commercial Insurance)
St. Augustine, FL

See All 22 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Trinity Independent Church, located at 84 Bridge Street, St. Augustine Florida 32084, was constructed in 1913. The rehabilitation project is funded through the City of St Augustine Community Redevelopment Agency (CRA), Lincolnville Community Redevelopment Area (LCRA) Institutional Rehabilitation Grant Program. Trinity is a contributing structure to the Lincolnville National Register Historic District and is in dire need of repair and structural stabilization. The dilapidated bell tower is in disrepair and has needed rehabilitation for many years. As Phase I of the multi-phased project, the bell tower will be reconstructed to improve the integrity of the structure and maintain its historic integrity.

More opportunities from Florida → Community Services

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS