Trunk Sewer Rehabilitation and Repair Program Contractor Engagement

Open
International
Response DeadlineDue in 24 days
Solicitation #
26-0699

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Metro Vancouver is seeking expressions of interest from experienced general contractors specializing in trunk sewer rehabilitation for the Trunk Sewer Rehabilitation and Repair Program Contractor Engagement. This initiative aims to gather professional feedback to improve the understanding of construction costs, schedule impacts, procurement effectiveness, and risk allocation for large-diameter gravity trunk sewers and forcemains. The scope of engagement includes various assets within the liquid waste collection system, such as circular and non-circular gravity sewers, interceptors, siphons, and low-pressure forcemains. This sources sought solicitation, numbered 26-0699, was posted on November 24, 2026, with a response deadline of December 22, 2026. The project will be performed in Canada. There is no specific set-aside status associated with this opportunity.

General Info

Metro Vancouver seeks general contractors for trunk sewer rehabilitation feedback and cost analysis.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Potential competitors

3 companies
3similar awards
  • Mr. Rehab LLC 33%
  • SAK CONSTRUCTION LLC 33%
  • Shanghai Construction (Canada) Group 33%
  1. 1Mr. Rehab LLC1 similar awards
  2. 2SAK CONSTRUCTION LLC1 similar awards

Review awarded contracts behind each match to see who has relevant experience.

Explore potential competitors

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMetro Vancouver
ContactsNo contacts available
OfficeCAN
Organization / AgencyMetro Vancouver
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
The Greater Vancouver Sewerage & Drainage District (“the Corporation”) invites Expressions of Interest from experienced trunk sewer rehabilitation general contractors interested in providing feedback to better understand factors influencing construction cost, schedule impacts, procurement effectiveness, and risk allocation for large-diameter gravity trunk sewers and forcemains. The engagement initiative covers rehabilitation and repair projects within the Corporation's liquid waste collection system, including circular and non-circular gravity sewers and interceptors, low-pressure forcemains, siphons, and related assets.

Similar Contracts

Same NAICS industry code

More opportunities from Metro Vancouver

Same awarding agency

NAICS: 541330
International
CONSULTING ENGINEERING SERVICES FOR THE DETAILED DESIGN, CONSTRUCTION, AND DECOMMISSIONING OF THE SAPPERTON PUMP STATION
Solicitation # 26-0444
Metro Vancouver is seeking professional consulting engineering services for the detailed design, construction, and decommissioning of the Sapperton Pump Station in New Westminster, BC. The scope of work involves decommissioning the original Sapperton Pump Station, converting the original wet well into a grit chamber, modifying the dry well to enable a 750 mm ID interconnection, and reconfiguring the backup power system through the permanent installation of two 2.0 MW generators. The project is divided into two phases: Phase A, covering detailed design and tendering services, and Phase B, covering construction and post-construction engineering services. Proposals are evaluated based on a 100% weighting, with 70% allocated to technical qualifications—specifically project management and resource adequacy—and 30% to commercial considerations. The Corporation will determine the greatest value, with favorable consideration given to proponents with local knowledge and a presence in the Metro Vancouver region. Submissions must be made electronically via the Bidding System by November 19, 2026. The successful contractor must be in good standing with the Workers Compensation Board of British Columbia and comply with Engineers and Geoscientists British Columbia quality management guidelines. Invoicing is performed monthly in Canadian dollars with a 30-day payment term. There is no set-aside status for this solicitation.
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 6 days
View Details
NAICS: 236210
International
Engineering and Construction Services Production Way Operations Center Renovation
Solicitation # 26-0244
Metro Vancouver is seeking a Design-Builder for the renovation of the Production Way Operations Center through a progressive design-build (PDB) delivery model. The project is divided into two distinct phases: Phase 1 focuses on design and pre-construction, encompassing project definition, preliminary design, and detailed design stages, while Phase 2 covers construction and commissioning. The scope of work includes structural and seismic upgrades, interior renovations for operational use, and the expansion of the parking lot to include EV charging stations. The estimated direct construction budget for Phase 2 is approximately $33 million, with a specific estimate of $32,952,000. Eligible proponents for this solicitation include Bird Construction Group, Canadian Turner Construction, Chandos Construction LP, and Ledcor Construction Limited. Proposals must be submitted in English via the designated bidding portal by December 18, 2026. Award selection is based on a weighted scoring system evaluating the qualifications of key personnel, the proponent's approach to project challenges, and the Phase 1 fee. The contract requires the Design-Builder to implement a comprehensive Quality Management Plan and provide performance and labor and materials payment bonds equal to 50% of the Phase 2 price. There is no set-aside status for this contract.
Industrial Building Construction

POSTED

about 2 months ago

DEADLINE

in 20 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS