Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TUBE ASSEMBLY, METAL

Closed
SPE7M4-26-T-266KFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract specifies the procurement of a metal tube assembly constructed of steel material per MIL-T-3520 Type 3, with a 0.250-inch outer diameter and 0.028-inch wall thickness, featuring SAE flared fittings at both ends and three bends. The item is identified by NSN 4710-00-566-7134, with a required quantity of 57 units to be delivered FOB origin within 158 days of award, targeting a delivery date of January 2, 2027. The contract enforces strict adherence to technical and quality requirements as defined in the DLA Master List of Technical and Quality Requirements, referenced by R and I numbers, and prohibits the use of Class I ozone-depleting chemicals in manufacturing or incorporation, overriding any conflicting specification but not relaxing product performance standards. Substitute chemicals require prior approval unless explicitly authorized. Inspection and acceptance must occur at origin, with sampling conducted per MIL-STD-1916 or ASQ H1331 Table 1 using zero-based acceptance criteria; critical, major, and minor attributes must be verified at levels VII, IV, and II respectively, or AQLs of 0.1, 1.0, and 4.0, with unspecified attributes treated as major. The contractor must maintain a quality system compliant with SAE AS9003 or ISO 9001 tailored to AS9003, and physical marking of bare items must follow RQ017 guidelines. Packaging must comply with MIL-STD-2073-1E and MIL-H-775, applying Level A preservation when the ZZ method is used, with all items labeled per MIL-STD-129 including barcoding via 2D Data Matrix, and palletization must meet DLA’s RP001 requirements. Shipping and delivery are routed to the DLA Distribution facility in New Cumberland, Pennsylvania. The contract is a fixed-price type under FAR 52.216-1 with deviations applied to multiple clauses including changes, subcontracting, inspection, and safeguarding of covered defense information. It incorporates stringent cybersecurity mandates under NIST SP 800-171 and DFARS 252.204-7012, requires compliance with prohibitions on hexavalent chromium and toxic material handling, and explicitly bans acquisition of items from Communist Chinese military companies

General Info

Procure 57 steel tube assemblies per MIL-T-3520 Type 3 with flared fittings, deliver FOB origin by Jan 2, 2027, compliant with rigorous quality and cybersecurity standards.

Agency

Department Of Defense → FLUID HANDLING DIVISIONView Agency

NAICS

332996 - Fabricated Pipe and Pipe Fitting ManufacturingView NAICS

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

NONE

Documents

(1)

RFQ SPE7M4-26-T-266K for DLA Land and Maritime Fluid Handling Division

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → FLUID HANDLING DIVISION
View Agency Profile
Office AddressUSA

Full Description

Show more
TUBE ASSEMBLY,METAL
TUBE ASSEMBLY, METAL, STEEL MATERIAL PER
MIL-T-3520 TY 3, 0.250 INCH TUBE O.D.
BY 0.028 INCH WALL THICKNESS, SAE FLARED
FITINGS BOTH ENDS, 3 BENDS.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
SPE7M4-26-T-266K
SECTION B
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
RD003, COVERED DEFENSE INFORMATION POTENTIALLY APPLIES
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS)
RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
DETAILED DRAWING (ONE ITEM)
LATER DRAWING REVISION IS AVAILABLE AT
TACOM. CHECK DCSC TIIF TO SEE IF LATER
REVISION HAS BEEN ORDERED OR RECEIVED.
IF LATER REVISION IS AVAILABLE AT DCSC,
REVIEW IT AND ADD TO CTDF, IF APPROPRIATE.
IF STILL NOT ORDERED, PROCESS REQUEST TO
DCSC-SDA TO ORDER LATER REVISION.
STANDARD
DRAWING NUMBER DOES NOT MATCH TACOM FILE.
CHECK FORMAT TO ASSURE THAT DRAWING IS
COMPATIBLE WITH TACOM FILE. THIS FORMAT
SHOULD BE RECONCILED WITH TACOM FILE WHEN
DRAWING IS VALIDATED.
CRITICAL APPLICATION ITEM
TDP Rev A Gen 1 IAW BASIC DRAWING NR 19207 8733922 REVISION NR H DTD 07/30/2009 PART PIECE NUMBER:
TDP Rev A Gen 1 IAW REFERENCE DRAWING NR 19207 8733923 REVISION NR J DTD 09/12/2019 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017528551 0001 EA 57.000
NSN/MATERIAL:4710005667134
DELIVERY (IN DAYS):0158
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
SPE7M4-26-T-266K
SECTION B
PR: 7017528551 PRLI: 0001 CONT’D
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ
WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z
UNIT CONT:ZZ OPI:M
INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
"PRESERVATION AND PACKAGING SHALL BE
I-A-W THE LATEST REVISION OF FEDERAL
SPECIFICATION MIL-H-775, HOSE."
"WHEN ZZ IS THE METHOD OF PRESERVATION, USE
LEVEL "A" PRESERVATION AS CITED IN THE
COMMODITY SPECIFICATION."
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Need Ship Date:01/02/2027 Original Required Delivery Date:01/02/2027
SPE7M4-26-T-266K NSN/Part Number: 4710-00-566-7134 Quantity: 57 EA Purchase Request: 7017528551QTY: 57 Delivery: 158 days ADO

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency