Tunnel Outlet Canal Lining

Closed
Tunnel Outlet Canal LiningState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 18 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves comprehensive earthwork and canal lining activities for the Stockton Tunnel Outlet Canal project in California, managed by the Stockton East Water District. The scope includes excavation to achieve proper grades for the placement of aggregate base and shotcrete lining, with all excavated material to be off-hauled. The project requires furnishing and installing imported aggregate base, which must be compacted to 95% before shotcrete application. A reinforced shotcrete lining, approximately 400 linear feet long and reinforced with wire mesh, will be installed to line the canal. Additionally, wall drains equipped with check valves and drainpanels will be installed along the North canal bank to facilitate drainage. The project also mandates complete dewatering of the site throughout construction, ensuring a dry working environment. An access ramp made of reinforced concrete will be constructed for canal access, and approximately 120 linear feet of existing 12-inch PVC pipe will be demolished and removed, with the pipe cut flush with the new shotcrete lining at the connection point to a 12-inch HDPE canal drain pipeline. The project is valued between $500,000 and $1,500,000, with a scheduled completion period of approximately 90 days. Bidding is open until October 24, 2025, with detailed technical specifications and project maps provided in the bid documents. The contract emphasizes adherence to technical standards, proper installation procedures, and coordination of earthwork, drainage, and lining activities. The primary contact for inquiries is David Strohm, reachable via email and phone. The project aims to improve canal integrity and drainage capacity, supporting water conveyance infrastructure in the region.

General Info

Agency

California → Stockton East Water District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

Tunnel Outlet Canal Lining Project Technical Specifications and Bid Documents October 2025

PDF, High priority: read this first588 pages · rfp
High

Stockton Tunnel Outlet Canal Lining Project Maps

PDF, Low priority6 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Stockton East Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Stockton East Water District
Office AddressN/A

Full Description

Show more
Performing the necessary earthwork excavation to cut canal to appropriate grades foraggregate base and shotcrete placement and off-haul of all excavated material. Furnishingand installing imported aggregate base to be placed and compacted to 95% compactionprior to shotcrete placement. Furnishing and installing of 400 LF of shotcrete canal liningreinforced with wire mesh. Furnishing and installing wall drains with check valves and drainpanels on the North canal bank. Complete and continual dewatering of the canal and projectsite during the entire project duration. Installation of one reinforced concrete canal accessramp. Demolition and off-haul of approximately 120 LF of 12” PVC pipe up to a point ofconnection with a 12” HDPE canal drain pipeline, cutting the pipe to flush with the newshotcrete lining.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS