Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Active
2026/2027/03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Gallup Electric Department is soliciting a turnkey Engineering, Procurement, and Construction (EPC) contract for the new Carbon Coal Electrical Substation under solicitation number 2026/2027/03. This project is designed to increase system capacity and reliability to support significant electrical demand from the recently annexed Carbon Coal area, including a new regional hospital, trade port development, and expanded residential and industrial growth. The selected contractor will serve as the single point of responsibility for the entire project lifecycle, encompassing engineering, procurement, construction, and commissioning to ensure a fully operational substation. The response deadline for this solicitation is November 5, 2026. The contract is governed by a sample agreement for 2026 with a primary term running through 2027 and potential renewals until 2030. Compliance requirements are extensive, including the submission of a Statement of Intent to Pay Prevailing Wages before construction and an Affidavit of Wages Paid upon completion. Environmental and regulatory mandates require the filing of EPA Notice of Intent and Notice of Termination forms for stormwater discharges. Additionally, the contractor must secure a Gallup Municipal Right-of-Way/Public Easement Work Permit and NMDOT Traffic Control Roadway Work Permits, while providing indemnification and liability insurance of at least 1,000,000 dollars per occurrence to the New Mexico Department of Transportation.

General Info

EPC contract for Carbon Coal Electrical Substation; deadline November 5, 2026.

Agency

New Mexico → Electric DepartmentView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

NM, USA

Set-Aside

NONE

Documents

(12)

AS653A_SKETCH Plat Notes and Approvals

PDF1 pageplat

City of Gallup Sample Agreement 2026

PDF5 pagescontract-document

Substation_Supporting_Images.zip

ZIP

Type A Prevailing Wage Poster - Effective July 1, 2026

PDF3 pageswage-determination

RFP No. 2026/2027/03 - Carbon Coal Electrical Substation EPC

PDF68 pagesrfp

Affidavit of Wages Paid for Construction Project

PDF2 pagesaffidavit-of-wages-paid

EPA Form 3510-9 NPDES Notice of Intent for Storm Water Discharges

PDF4 pagespermit-notice

Statement of Intent to Pay Prevailing Wages

PDF2 pageswage-determination

EPA Form 3510-13 Notice of Termination for Stormwater Discharges

PDF4 pagesnotice-of-termination-form

NMDOT Indemnification and Hold Harmless Agreement

PDF1 pagecontract-document

Gallup Municipal Right-of-Way/Public Easement Work Permit

PDFpermit

NMDOT Traffic Control Roadway Work Permit

PDF1 pagepermit

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Mexico → Electric Department
Contacts2 people available
OfficeGallup, NM, 87305, USA
Organization / Agency
New Mexico → Electric Department
View Agency Profile
Office AddressGallup, NM, 87305, USA
Contacts
Jose RomeroElectric Deputy Director
Frances RodriguezPurchasing Director

Interested Companies (26)

Show more
IMS
San Diego, CA
SEL Engineering Services
Pullman, WA
Enercon Services
Kennesaw, GA

See All 26 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Carbon Coal Substation project is being undertaken to support significant existing and anticipated electrical demand within the recently annexed Carbon Coal area of the City of Gallup. Planned developments within the area include a new regional hospital, trade port development, and continued residential, commercial, and industrial expansion, all of which require additional electric infrastructure to provide safe, reliable, and adequate electrical service. Construction of the new substation is necessary to increase system capacity, improve reliability, maintain operational flexibility, and ensure the City's electric system can meet both near-term service demands and long-term load growth within this expanding service area. The project represents a major capital investment that will strengthen the City's electric distribution system while supporting economic development and critical public infrastructure. This project is consistent with the City's commitments under the 2024 Supplemental Annexation Agreement, which provides for the coordinated planning, construction, and long-term operation of utility infrastructure necessary to serve the annexed area. The Carbon Coal Substation is a key component of that infrastructure and is essential to supporting future development within the corridor. Given the size, complexity, and schedule requirements of this project, the City has elected to utilize a turnkey Engineering, Procurement, and Construction (EPC) delivery method. The selected contractor will serve as the single point of responsibility for all aspects of project delivery, providing complete accountability for engineering, procurement, construction, commissioning, and successful delivery of a fully operational substation. The City expects a collaborative approach that emphasizes quality, constructability, cost control, schedule adherence, safety, and effective project management throughout the duration of the project.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Keystone Power Outage Repairs
Solicitation # keystone-power-outage-repairs
The Keystone Power Outage Repairs solicitation seeks a contractor to perform electrical infrastructure restoration at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work involves repairing three damaged poles, specifically poles 35, 43, and 45. Technical requirements include the installation of one 100 kva and two 50 kva transformers on pole 45, one 100 kva transformer on pole 43, and one 75 kva transformer on pole 35. Additionally, the contractor must install new polymer cut outs and 10kv lightning arresters on poles 35 and 43, implement new service drops to buildings, install a new secondary quadplex for the main trunk line, and handle the demolition and disposal of old secondary cabling. Final deliverables include verified voltage and proper rotation in buildings. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 237130. Offerors must be registered and active in SAM.gov and are required to separate labor and materials on their bids. The project is subject to Davis-Bacon wage standards, and the selected contractor must provide certified payroll. The solicitation was posted on September 6, 2026, with a response deadline of September 9, 2026. Primary contact for this requirement is Jennie Drumheller.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
CONTRACT : 26-333577; PHASE V COMMUNICATION FACILITIES REPLACEMENT: GROUP A ;CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION (CALFIRE);HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
Solicitation # 0000040277
The State of California Department of General Services is soliciting bids for Contract 26-333577, Project No. 1512A, 1512B, and 1512E, regarding the Phase V Communication Facilities Replacement for the California Department of Forestry and Fire Protection (CALFIRE). The project involves the replacement of communication facilities at three sites: Pratt Mountain, Bunchgrass Mountain, and Mt. Pierce, located in Humboldt and Shasta Counties. The scope of work includes demolition, excavation, structural steel, fencing, cast-in-place concrete, CMU block wall vault construction, panelboards, switchgear, generators, and tower erection. The state has estimated the project cost at 20,739,900.00 dollars with a project term of 991 calendar days. Eligible bidders must hold a Class A or B license and attend mandatory pre-bid site inspection tours on September 16 and 17, 2026. Sealed bids are due by 2:00 PM on September 30, 2026, with a public bid opening scheduled for October 1, 2026. Awardees must provide payment and performance bonds totaling 100 percent of the contract price and submit Certificates of Reported Compliance for any fleet vehicles subject to California Air Resources Board regulations. The contractor is also responsible for adhering to all federal, state, and local health and safety mandates, with all associated costs being the responsibility of the contractor.
California Department of General Services

POSTED

2 days ago

DEADLINE

in 24 days
View Details

More opportunities from New Mexico → Electric Department

Same awarding agency