Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Twentieth Century Women’s Club of Eagle Rock

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Los Angeles Department of City Planning is overseeing a Project Compliance and Design Review for tenant improvements to the Women’s Twentieth Century Club of Eagle Rock, a designated Historic Cultural Monument (HCM No. LA-537). Located at 5105 North Hermosa Avenue and 1855 West Colorado Boulevard, the project involves interior remodeling, ADA accessibility upgrades, and exterior façade improvements. Specific exterior work includes repairing wood shingles, installing a new wood trash enclosure, a 42-inch wood fence and gate, a decorative mechanical equipment screen, and replacing three wood windows to match the original design. The project also includes removing paint from brick at the southwest exterior stair and repairing the roof and walls of a non-historic addition. The project maintains the existing building footprint of 6,370 square feet and is exempt from additional parking requirements under AB 2097, preserving three existing spaces. It is categorized as a forecast action and has been granted a CEQA Class 1 categorical exemption for existing facilities, as the alterations result in no expansion of use. All work must adhere to the City of Los Angeles Building Code, including regulatory compliance measures for noise, stormwater management, and green building standards. Final acceptance is contingent upon approval from the Design Review Board and the Office of Historic Resources, with permit clearance already confirmed as of June 2, 2025.

General Info

Historic renovation of Twentieth Century Women’s Club with ADA upgrades, no footprint increase, preserving historic character under local codes.

Agency

California → City of Los Angeles

NAICS

236118 - Residential RemodelersView NAICS

Place of Performance

Hermosa Ave & W Colorado Blvd, Los Angeles, CA, 90041

Set-Aside

NONE

Documents

(1)

ENV-2025-1594-CE Notice of Exemption for Twentieth Century Women's Club Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Debbie LawrencePlanning Associate
Whitney Del RealRepresentative

Full Description

Show more
The proposed project is a Project Compliance and Design Review (Design Review Board) for a Tenant Improvement to an existing one-story historic commercial building, identified as the Women’s Twentieth Century Club of Eagle Rock and designated as a City of Los Angeles Historic Cultural Monument (HCM) No. LA-537. The organization is identified in the California Federation of Women's Clubs as type IRS 501(c)(3). The project is located in Subarea II of the Colorado Boulevard Specific Plan and includes interior remodeling and exterior façade improvements, and ADA upgrades. The façade design shall consist of repair to exterior wood shingles, a new wood trash enclosure, a new 42-inch wood fence and entry gate, a decorative screen to block mechanical equipment, removal of paint from brick at southwest exterior stair, three (3) new wood windows matched to replace existing windows, and repair to damaged roof and walls of existing non-historic addition matching existing finishes; along Colorado Boulevard, Hermosa Avenue, and the west elevation as depicted in Exhibit “A.” The exterior finishes shall match the existing exterior finishes of the façade elements. No additional square footage is proposed. The existing square footage comprises a total of 6,370 square feet, consisting of 5,700 square feet of interior first floor area and 670 square feet of interior basement floor area. Parking for the project is exempt per AB 2097 and three (3) existing parking spaces will be maintained. The subject site is located at 5105 North Hermosa Avenue and 1855 West Colorado Boulevard, on the north side, between Highland View Avenue and Hermosa Avenue. According to ZIMAS, the site encompasses two lots totaling approximately 16,860 square feet. The site is zoned [Q]C4-1XL and has a General Plan Land Use Designation of Neighborhood Commercial. Surrounding properties are also zoned [Q]C4-1XL, with properties to the north zoned R1-1. The commercial properties are generally improved with one- and multi-story commercial buildings with neighborhood commercial uses such as retail, office, gas station and restaurant.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
SLED
Housing Rehab-5525 Delona Road
Solicitation # 26-061
Santa Rosa County, Florida, is soliciting bids for a housing rehabilitation project located at 5525 Delona Road in Milton, Florida. The scope of work includes replacing windows at ten openings with windborne debris protection, installing a new kitchen sliding glass door and side entry door, and replacing the central HVAC system and registers. Additional requirements involve blowing attic insulation to achieve R-38, converting the primary bathroom shower with grab bars and GFCI outlets, replacing soffits with vented vinyl, wrapping fascia in aluminum coil, and recladding the rear addition with new vinyl siding and a water-resistive barrier. All work must comply with the Florida Building Code, OSHA standards, and the Americans with Disabilities Act. The project must reach substantial completion within 90 calendar days, with final completion and readiness for payment within 120 calendar days. Liquidated damages for delays are set at 75 dollars per day. Payment is structured with a 5 percent retainage, meaning the contractor is paid 95 percent of the work completed until final acceptance. Final payment is contingent upon a successful walkthrough by the homeowner and approvals from the Housing Program Inspector, the County Inspections Division, and the State Health Department. Bidders must be financially sound, of good reputation, and submit their proposals electronically via the OpenGov portal by October 14, 2026. Award selection is based on the best interest of the County, primarily considering the low bid alongside the contractor's qualifications.
Housing

POSTED

about 17 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236118
New
SLED
Solicitation A10-09-26-9613- Housing Rehab- Sequoyah County
Solicitation # A10-09-26-9613
Solicitation A10-09-26-9613 is a request for bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a single-family home located at 704 NW 4th St, Muldrow, Oklahoma, in Sequoyah County. The scope of work includes carpentry, flooring, and tree removal, specifically involving window replacement, vinyl flooring installation, subfloor repair, and lapboard siding replacement. The project must be completed within 30 working days, with work commencing within two weeks of notification. Bids are due by October 6, 2026, at 5:00 P.M. The contract will be awarded to the lowest responsive and responsible bidder, with preference given to those with TERO certification from the Cherokee Nation Tribal Employment Rights Office. Mandatory submission documents include the Mandatory Bid Response sheet, the Work Write Up, and form HUD-5369-A. The project is subject to HUD general conditions, the Buy American Recovery Act, and Davis-Bacon wage determination OK20260079. Contractors must provide a one-year warranty on materials and workmanship and maintain appropriate commercial general liability and automobile insurance. Payment is structured with a minimum of 50 percent upon an inspection report and final payment upon 100 percent completion and acceptance by the HACN Inspector. Liquidated damages of 100 dollars per working day will be applied for extensions beyond the contract end date.
Cherokee Nation Housing Authority

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 236118
New
SLED
ADA Ramp
Solicitation # 171995
The Choctaw Nation Housing Authority is soliciting bids for the construction of an ADA-compliant ramp and landing at a residence in McAlester, Oklahoma. The project involves building a 5-foot wide flat landing extending 7 feet from the front porch with a 90-degree turn toward the parking area, anchored to the existing concrete porch. The ramp must be built to ADA specifications with a minimum clear width of 36 inches and include a concrete landing at the end that is at least 4 inches thick and extends 4 feet from the ramp. All work must meet or exceed 2019 IRC standards. Technical requirements specify the use of pressure-treated ground contact lumber and deck screws, 2x6 frame and deck material, joists spaced 16 inches on center, and 4x4 posts concreted at least 2 feet deep. Handrails must feature spindles at 4 inches on center and be sanded with rounded ends. Prospective contractors are required to visit the site before bidding, as change orders for identifiable site conditions will not be approved. The contractor is responsible for all measurements, material counts, permits, line locates, waste removal, and restoring the yard to mowing condition. Bids must be itemized, include a price validity date, and be submitted exclusively through the Housing Bid Board by September 28, 2026, at 4:30 p.m. This solicitation is subject to Davis-Bacon rules and provides preference to Indian organizations and Indian-owned economic enterprises. Project coordination is managed by Case Manager Andrea Strawn and Inspector Kevin Mings.
Choctaw Nation Housing Authority

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS