This Solicitation opportunity from Texas was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
TxDOT Aviation Division - Addenda
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Texas Department of Transportation is soliciting bids for pavement rehabilitation at Haskell Municipal Airport under solicitation number NTB2508HASKL00031, with a deadline for submissions on June 11, 2026. The project scope includes the rehabilitation of the runway, apron, and taxiway systems, involving the removal of existing asphalt pavement, construction of new flexible pavement structures using TxDOT Item 341 HMAC Type DG-D and base course repairs per Item 351 and Item 247, application of reflective and non-reflective pavement markings in white, yellow, black, green, and temporary white, and installation of erosion and sediment control measures. Work must be performed within a 75-calendar-day performance period under the base bid, with liquidated damages of $1,000 per calendar day for delays. The Engineer's estimated probable cost for the base bid is $1,058,811.00. All contractors must adhere to operational safety standards outlined in FAA AC 150/5370-2G, including mandatory runway closures when construction occurs within 60 feet of the runway centerline, monitoring of the CTAF frequency 122.9 MHz, and strict limitations on airfield access requiring prior approval from the Airport Director. All construction vehicles and equipment must be equipped with 3-foot square orange and white flags and amber flashing lights for visibility. Proposals must include a completed bid form, bid bond, bidder qualifications, addendum acknowledgement, and a HUB Subcontracting Plan, which is required even though the HUB goal is 0%, as any use of HUB subcontractors triggers the obligation. A proposal lacking an up-to-date HSP will be rejected without further consideration. Contractors must submit all contract documents, pay requests, change orders, certified payroll, DBE/HUB reports, and insurance certificates via the eGrants electronic system. Prior to beginning any construction activities, the contractor must provide a minimum of 72 hours’ notice to the Resident Project Representative to facilitate issuance of a Notice to Airmen, and must maintain a quality control program with a certified testing laboratory, while Centurion provides independent quality assurance. The prime contractor is required to perform at least 30% of the work. The bid must comply with Buy American provisions and Title VI of the Civil Rights Act. Waste materials must be removed from airport property, and any material tracked onto active air
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
