This Solicitation opportunity from Texas was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
TxDOT Aviation Division - Addenda
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Texas Department of Transportation is soliciting bids for the Taxilane Reconstruction/Widening and Apron Construction project at Mesquite Metro Airport under solicitation number NTB2618MSQTE00030, with a response deadline of May 28, 2026. The project involves pavement removal, earthwork, drainage structures, concrete pavement installation, and edge lighting, structured around a base bid with two additive alternates for additional apron construction. Bidders must provide pricing for the base bid and both alternates, with estimated costs of $1,628,391.75, $654,490.69, and $706,712.25 for the base bid schedules, and $271,878.75 and $76,306.50 for the two alternates. The base bid has a performance period of 130 calendar days, while the alternates require 20 and 10 calendar days respectively, with liquidated damages of $1,000 per calendar day for delays. All work must comply with FAA Advisory Circular 150/5370-2G and the safety phasing plan outlined on sheets G05 and G06, and contractors must submit a project-specific Safety Plan Compliance Document and a Contractor Quality Control Program per Item C-100. The contract requires full compliance with Buy American standards and mandates a Buy American Certification. Bidders must be registered in SAM.gov and must submit a complete set of required documents including a Bid Form, a bid bond of at least two percent of the total bid amount containing a Power of Attorney and claim notice page, certifications regarding debarment, suspension, and non-segregated facilities, required AIP language, and a DBE Participation Plan. Although the DBE participation goal is zero percent, submission of a DBE plan demonstrating good faith effort is mandatory within five calendar days after bid opening, with required forms available for subcontractor commitments. Wage rates are predetermined and must be adhered to, and payment will be made up to 95 percent of the contract amount or installed work items prior to final acceptance, with no retainage. The contractor is fully responsible for protecting existing utilities and must perform all Quality Control Testing, while Quality Assurance Testing is conducted by the state. All payment requests, certified payroll, insurance certificates, and reports must be submitted electronically via the
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
