Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 27, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U.S. Coast Guard Phase Ii Tenant Improvements Project Fy 20/21

Closed
2019-38State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves comprehensive construction and remodeling work for the U.S. Coast Guard Phase II Tenant Improvements project at the National Distribution Center in National City, California. The scope includes both exterior and interior modifications, requiring the contractor to furnish all necessary labor, materials, equipment, and disposal services. Exterior work encompasses constructing a new concrete vehicle loading ramp, replacing existing dock doors with a larger one, and managing soil removal after backfilling. It also involves implementing stormwater pollution prevention BMPs to control discharges to local waterways. Internally, the project entails hazardous material abatement, demolition of existing facilities, utility trenching, and the construction of new restroom and locker room facilities, along with a secure wire mesh enclosure, remodeled medical exam room, and conditioned office spaces. Additional tasks include installing new electrical and HVAC systems, integrating fire sprinkler and alarm services, painting, sewer trenching for future connections, and soil disposal. The project emphasizes compliance with environmental and safety standards, including hazardous material removal and stormwater management. It also involves significant utility work, such as utility trenching and future sewer tie-ins, alongside interior renovations to improve functionality and security. The contract, issued by the Port of San Diego under solicitation number 2019-38, was posted in August 2020 with a response deadline in October 2020. The work is managed by the California office, with Natasha Dulik serving as the primary contact. The project aims to enhance the facility’s operational capacity while ensuring safety, environmental compliance, and efficient use of space within the designated budget and timeline.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2

Notice Inviting Bids for Spec 2019-38 U.S. Coast Guard Phase II Tenant Improvements

PDF, High priority: read this firstitb
High

Specification No. 2019-38 Pre-Bid Conference Sign In Sheet

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of San Diego
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Work Includes:1. Furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of the proposed project includes the construction and remodel of the U.S. Coast Guard Phase II Tenant Improvements project located at the National Distribution Center, 1022 Marina Drive, Suite 150, National City, CA2. The work shall include, but not limited to the following as shown in the Plans and described in these Specifications:A. Exterior:1. Construct new concrete vehicle loading ramp at existing loading dock. Excavation for ramp foundation, set-up forms, place reinforcing steel, concrete placing, and finishing.2. Replace two existing roll-up dock doors for one single larger roll-up dock door.3. Removal, characterization, and disposal of extra soil not needed after backfilling and compaction is complete for new concrete loading ramp.4. Preparing a Construction BMP Plan and implementation and maintenance of storm water pollution prevention Best Management Practices (BMPs) required to control discharges to the storm water conveyance system or direct discharges to the San Diego Bay from construction activities. B. Interior:1. Abatement of hazardous materials including but not limited to lead paint and universal waste to include fluorescent light tubes and associated ballasts, and smoke detectors.2. Demolish existing restroom, to include plumbing fixtures, partitions, existing mop sink, existing concrete curb wall, stub out water supply and drain from adjacent finished surface and cap.3. Trenching for required utility services.4. Remove existing tactical lockers to be reused. Temporarily store and protect prior to re-installation.5. Construct new restroom and locker room facilities (910 gross square footage).6. Construct new woven wire mesh partition cage enclosure for personnel and supplies (no gross square footage added).7. Remodel existing medical exam room (no gross square footage added).8. Remove and install new suspended ceiling panels.9. Construct new Secret Internet Protocol Router (SIPRNET) Network room.10. Partial remodel of existing front office area (no gross square footage added).11. Construct new conditioned office areas (7,402 gross square footage).12. Remodel existing locker room area (6,182 gross square footage).13. Install new electrical work.14. Supply and install new HVAC system, to include testing and commissioning.15. Install new and tie-in into existing Fire sprinkler and Alarm services.16. Paint all new, modified walls, and existing walls within the project area.17. Sewer trenching for future tie-ins.18. Removal and disposal of extra soil not needed after backfilling and compaction is complete for proposed utility work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS