Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on December 5, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U1a Access

Closed
001-NR-24Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange is soliciting bids for the restoration and reconstruction of approximately 8 acres of developed parkland at the City Center Sport Complex Ballfields. Because the site is located on a former municipal landfill, the project focuses on managing legacy landfill conditions to ensure long-term stability and safety. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of solid waste, the installation of a 300,000 square foot reinforced geotextile membrane, and the replacement of topsoil and suitable fill. Additional requirements include the reconstruction of ballfields, parking lots, and associated site improvements, such as asphalt pavement and chain link fencing. The contract will be awarded to the lowest responsive and responsible bidder, with an engineer's estimate of 3,500,000 dollars and a projected performance term of 395 days. Bidders must be certified General Contractors licensed in the State of Florida. Submissions require a hybrid approach, consisting of an electronic bid via OpenGov and a hand-delivered hard copy including a PDF on a flash drive, with a final deadline of November 9, 2026. Mandatory requirements for bidders include attendance at the pre-bid site visit, the provision of a bid bond typically valued at 5 percent of the bid amount, and the submission of numerous compliance affidavits covering workers compensation, E-Verify, and anti-collusion. Payments will be processed via ACH within 45 days of receiving a proper invoice.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 11 days

General Info

NAICS

238910 - Site Preparation Contractors

Place of Performance

North Las Vegas, NV, 89030, USA

Set-Aside

NONE

Documents

1

U1a Access Request for Information (RFI)

PDF, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Deadline changed

Response deadline changed from Nov 7, 2024 to Nov 7, 2023.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Msts � DOE Contractor
Contacts1 person available
OfficeNorth Las Vegas, NV, 89030, USA
Office AddressNorth Las Vegas, NV, 89030, USA
Contacts

Full Description

Show more
BACKGROUND 1.1. The Nevada National Security Site (NNSS) is a U.S. Department of Energy (DOE) installation, operated by Mission Support and Test Services (MSTS, referred to from here forward as CONTRACTOR), comprising approximately 3,561 square kilometers (1,375 square miles) of federally owned land located in southeastern Nye County, Nevada. It is located approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and is accessed from U.S. Highway 95, which roughly forms the southern boundary of the site. 1.2. At the NNSS, the U1a Complex is a Hazard Category 2 Facility located another 23 miles from the entrance of the NNSS and consists of a surface complex and underground facility that is located approximately 1,000 feet below surface. REQUIREMENT 2.1. Project Overview. The CONTRACTOR is investigating subcontracting construction of a new access shaft and hoist project at the U1a Complex for ingress and egress to the underground facility in support of personnel, equipment, and muck transport to a specialized firm (referred to from here forward as SUBCONTRACTOR). SUBCONTRACTOR employees must be able to provide proof of U.S. citizenship. This project is considered a DOE capital asset project subject to, at a minimum, the principles of DOE Order 413.3B. Any potential project would not be expected to be designed prior to fiscal year (FY) 25. 2.2. The new access shaft and hoist will meet the following requirements: Access Shaft The U1a Complex is located approximately 1,000 feet below the surface complex. The access shaft will connect nominally 100 feet off an existing drift, so some mining may be required. Will include (at minimum) a permanent hoist, headframe, shaft steel, guides, and hoist house. Shaft lining shall be either steel or precast concrete. New shaft must accommodate dedicated utility space for future ventilation, utilities, and other infrastructure equivalent to 4-foot diameter shaft. Utilities are not included in this scope, only dedicated space in shaft. Must support facility mining operations with hoist equipped skip (enables - muck to be transported to the surface) or similar feature. Topside and bottom side features to support safe and effective access, use, and maintenance of the access shaft and hoist for personnel, equipment, mining support, and other potential uses. Hoist System Must support a minimum load of 36,000 lbs. and be qualified under an American Society for Mechanical Engineers Nuclear Quality Assurance (NQA-1) Certification equivalent quality program, (e.g., commercial grade dedication process, QG2). Must be compliant with DOE-STD-1195. Must provide a means for reliable underground ingress and egress to support a shift change of at least 100 workers to exit and enter within a 30-minute time window. Cage dimensions must be designed to accommodate a payload of at least 8 feet wide x 8 feet deep x 10 feet high to accommodate underground ingress and egress of current and future experimental equipment in support of CONTRACTOR programs. Must have independent backup power (for example, generator backup) to ensure ability to egress underground staff during loss of site delivered/distributed line power. 2.3. The SUBCONTRACTOR shall design the shaft and supporting equipment, construct the shaft, and install equipment. 2.3.1. Design the Shaft and Supporting Equipment. The SUBCONTRACTOR will design the new access for the U1a Complex to meet the Requirements, listed in section 2.2 above. CONTRACTOR will provide a concept design that the SUBCONTRACTOR may consider. Design shall be accomplished by or under the direction of, and stamped by, a qualified Professional Engineer registered in the State of Nevada. The SUBCONTRACTOR will conduct any pre-design investigations to provide design documents that include basis of design, design drawings, and design specifications, reports, and submittal register. 2.3.2. Construct the Shaft. The SUBCONTRACTOR will provide the full range of civil, structural, geologic, mechanical, and electrical work to construct the new access for the U1a Complex in accordance with design specifications and drawings. The SUBCONTRACTOR will be required to comply with statutory construction wage rate determinations. 2.3.3. Install Equipment. SUBCONTRACTOR will provide the labor, equipment, materials, delivery, and testing to install equipment as designed. Installation services include: - Factory acceptance tests - Installation - Functional and operational testing (Site Acceptance Testing) - Commissioning - Operations and maintenance training to CONTRACTOR designated personnel 2.3.4. Quality. SUBCONTRACTOR'S design must follow and be compliant with DOE-STD-1195. Additionally, the design, fabrication, installation and services for the new hoist shall either; - Have an auditable quality assurance program that is comparable to stringent consensus quality standards and can be shown to exceed ISO 9001 requirements in design, procurement, fabrication, inspection, and software quality assurance areas, or - Be prepared to accept and support significant CONTRACTOR oversight and independent checks in these areas. CAPABILITIES QUESTIONNAIRE Please respond to the following questions to assist the CONTRACTOR in determining the availability of sources capable of meeting the requirement, gain an understanding of possible approaches to execute the work, and an understanding the estimated value of the project. 1. Company information: - Name of company, point of contact name, phone number, and email address. Indicate whether your firm is a U.S. firm or a foreign firm. - CAGE Code, DUNS number, or a copy of your Representation and Certification in SAM.gov. - Company size and socio-economic status (e.g., small business, service-disabled veteran owned small business) - Firm's Bonding Capacity - single and aggregate capability. 2. If you have performed similar work on a US Government project, identify the contract type (e.g., design-build, design-bid-build), the pricing strategy used (e.g., Firm-Fixed-Price), and what the work was. If you have experience with multiple projects, provide the information for up to three projects. 3. In the event the CONTRACTOR decides to employ a design-build strategy, does your company have existing relationships or the ability to obtain that will enable you to respond? Does your firm have any suggestions or concerns the CONTRACTOR should consider if a design-bid-build strategy is determined where a construction firm is expected to execute a design that is already finalized? 4. During the construction and equipment installation, what site utilities and services would be required? If CONTRACTOR has services (e.g., fuel, batch plant, etc.) available at the NNSS site, explain what services would be beneficial and how they would positively affect the project. 5. What system requirements and interface specification would be needed? 6. What is the approximate duration of design and execution? 7. What is the typical delivery schedule for these types of shaft hoists? 8. Are any significant components available or designed and ready to manufacture that can expedite project schedule? What impact would such items have on the project? 9. What components and materials can be identified as requiring early procurement (e.g., site prep, hoist mechanics and equipment, structural steel and piping/conduit, electrical panels)? 10. Describe up to three projects that demonstrate your experience in designing or constructing similar projects. 11. Based on the information available, please provide a Rough Order of Magnitude (ROM) estimate for this project. Define any assumptions you made in developing your ROM. 12. What technical investigations would you require during the proposal preparation period to improve the quality of your proposal? INSTRUCTIONS The purpose of this notice is to perform SOURCES SOUGHT/MARKET RESEARCH. This is NOT a solicitation. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. RESPONSES REQUESTED FROM ALL INTERESTED FIRMS. This is for market research to determine if there are any vendors, regardless of business size, that can support CONTRACTOR in providing a new access to the underground of the U1a Complex. We are also soliciting industry input for the acquisition strategy. There is no Request for Proposal document at this time. If your firm is interested in this opportunity but do not possess the capabilities or capacity to perform the full scope as currently defined, are there specific requirements that preclude your participation that you'd like to identify for our consideration? Please be as specific as possible. If we find a requirement is either unclear or potentially overly restrictive, this is the time during the process for those requirements to be clarified and/or revised. Firms interested in this potential opportunity, please email your information to Nancy Ramos at contact@example.gov by 2:00 pm PDT on 7 November 2023. Direct all questions by email to Nancy Ramos at contact@example.gov by 2:00 pm PDT on 26 October 2023. This survey is issued solely for information and planning purposes and does not constitute a solicitation. Responses will become property of CONTRACTOR upon receipt. All information received in response to this request that is marked proprietary will be handled accordingly. CONTRACTOR will not compensate a responder for providing information.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS