This Solicitation opportunity from California was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UC Berkeley – Electrified Heating & Cooling Plant Project – Increment 2 – MEPF, TES Tank, Metal Panel (WP-05 Mechanical and Controls)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Webcor Builders, acting as the Construction Manager At Risk for UC Berkeley, is soliciting bids for Work Package 05 (WP-05) of the Electrified Heating & Cooling Plant Project, Increment 2. This project involves the design and construction of Mechanical and Controls systems, MEPF (Mechanical, Electrical, Plumbing, Fire Protection), a 2-million-gallon Thermal Energy Storage (TES) tank, and metal panel work. The goal of the facility is to replace the existing natural gas cogeneration plant with an all-electric central heating and cooling system. The estimated value for Work Package 05 is 22 million dollars within a total project estimate of 159 million dollars. The contract will be awarded to the lowest responsive and responsible bidder. To be considered responsive, subcontractors must have been prequalified through a prior Request for Qualifications process and must have attended a mandatory pre-bid job walk on May 20 or 21, 2026. Bids must be submitted exclusively through the BuildingConnected platform by June 16, 2026. Required submission materials include a completed Exhibit F1 without modifications or exclusions and a 10 percent AIA bid bond, which must be physically delivered to Webcor's San Francisco office within 48 hours of the bid deadline. Performance will take place in Berkeley, California, and contractors must hold a valid CSLB Class C-20 license for mechanical work. The project is covered under the University Controlled Insurance Program (UCIP), and successful bidders may be required to provide a 100 percent Payment and Performance Bond or enroll in the Subcontractor Default Insurance program. All technical requirements and scope details are governed by the Project Manual in Exhibit F and the trade-specific instructions in Exhibit F1.
General Info
Place of Performance
Berkeley, CA, 94720, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 14 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS