This Solicitation opportunity from Connecticut was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UConn Field House - Old Rec Center Renovation - Phase 2B - REBID #3 - Signage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The solicitation pertains to re-bidding for the signage package associated with the UConn Field House - Old Recreation Center Renovation - Phase 2B project at the University of Connecticut's Storrs Campus. Managed by Daniel O’Connells Sons as the construction manager, the project is based on complete construction documents prepared by Newman Architects. The bid period opens on August 20, 2025, and closes on September 25, 2025, with a vendor Q&A window from August 20 to September 12, 2025. The procurement is open to all vendors, with an estimated project value between $50,000 and $150,000. The solicitation does not specify set-asides, evaluation criteria, or detailed terms and conditions, nor does it include attachments or supporting documentation beyond the bid documents. There are no references to federal or state regulations, contract clauses, or specific contractual obligations within the available content. The scope involves supplying and installing signage as detailed in the project's construction documents, with no explicit line items, unit prices, or detailed cost breakdowns provided in the solicitation. Administrative details are minimal, with only a general contact email ([email hidden]) and the project location specified. No packaging, marking, inspection, or acceptance procedures are outlined, nor are there any special contractual requirements, representations, or certifications indicated. The procurement appears straightforward, focusing solely on the signage work, with no explicit evaluation factors or award methodology detailed in the available documentation. Overall, the project emphasizes adherence to the provided construction documents, with administrative and contractual provisions remaining unspecified in the current set of documents.
General Info
Place of Performance
CT, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Building 262 Renovations FLETC GlyncoOpen now, due in 15 days
- Repair Auto Maintenance Bldg 575Open now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
