Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

UDSP Self Storage & District Expansion, Municipal Code Text Amendment TA24-0004

Forecast
TA24-0004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Marcos Planning Division is implementing Municipal Code Text Amendment TA24-0004, titled UDSP Self Storage and District Expansion. The primary objective of this action is to exclude the University District Specific Plan Self-Storage Overlay Zone from the requirements established in San Marcos Municipal Code Section 20.400.180. The project is located in San Diego County on the south side of East Carmel Street, 300 feet east of Industrial Street, identified by APN 220-201-92-00. Administrative processing for this amendment includes a Notice of Exemption filed on January 15, 2026, with the San Diego County Clerk. This filing certifies that the project is exempt from environmental fees under CEQA Guidelines Section 15061(b)(3), as it is determined to have no significant environmental impact. Joseph Farace, the Planning Director, serves as the primary point of contact for the lead agency. The only associated cost identified is a fifty dollar county documentary handling fee.

General Info

San Marcos amends code TA24-0004 to exclude self-storage zones from specific municipal requirements.

Place of Performance

San Marcos, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Marcos
Contacts1 person available
OfficeN/A

Full Description

Show more
A Municipal Code Text Amendment to exclude the University District Specific Plan Self-Storage Overaly Zone from the requirements of San Marcos Municipal Code Section 20.400.180.

Similar Contracts

Same NAICS industry code

NAICS: 541490
SLED
RFQ No. 44-047 Exhibition Services
Solicitation # 44-047
The Los Angeles Public Library is issuing Request for Qualifications No. 44-047 to establish a pool of qualified entities for professional exhibition services on an as-needed basis for a three-year term. The scope of work is divided into four primary functional areas: curatorial services for content development, exhibition design for inclusive environments, graphic design for visual and interpretive materials, and installation and fabrication for the production of display components, including specialized supports for rare archival documents. All work must adhere to ADA accessibility standards and strict conservation guidelines for the protection of library materials. Proposals are due by January 11, 2027, and must be submitted as a single, searchable OCR PDF via Google Drive. Evaluation is based on a 100-point scale focusing on the description of professional services, qualifications, experience, and references, with a minimum score of 80 required for contract recommendation. Because this is an as-needed contract, there is no fixed total value; instead, the library will issue a Notice of Available Work for specific projects, and contractors will submit individual cost estimates based on hourly rates or fixed project costs. Awardees must comply with extensive City of Los Angeles regulatory requirements, including the Living Wage Ordinance, the Contractor Responsibility Ordinance, and the Equal Benefits Ordinance. Mandatory certifications include the Americans with Disabilities Act, child support compliance, and the Iran Contracting Act of 2010. Contractors are required to maintain minimum insurance limits of 1 million dollars for Workers Compensation, General Liability, and Automobile Liability. Payment for satisfactory invoices is issued no later than 60 days after receipt.
Library, Los Angeles Public

POSTED

about 1 month ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of San Marcos

Same awarding agency

NAICS: 541620
SLED
University District Specific Plan
Solicitation # SP26-0002
The Scripps San Marcos New Hospital Campus project, managed by the City of San Marcos, involves the development of a full-service regional acute-care hospital and integrated healthcare campus on a 15-acre vacant site at the northwest corner of Twin Oaks Valley Road and Discovery Street. The project requires amendments to the University District Specific Plan, a Tentative Parcel Map, and Conditional Use Permits to establish a facility providing emergency, inpatient, outpatient, diagnostic, and specialty medical services. Key infrastructure includes two acute care hospital towers, a medical office building, a rooftop helipad, a central energy plant, and structured parking. The development also incorporates a publicly accessible plaza, frontage improvements for pedestrian and bicycle circulation, and a design that preserves the capacity for a future pedestrian bridge across Twin Oaks Valley Road. Under solicitation numbers SP26-0002, CUP26-0004, CUP26-0007, and TPM26-0002, the project is subject to the California Environmental Quality Act, requiring a Subsequent Environmental Impact Report. A separate Conditional Use Permit is included to allow for the temporary use of a rock crusher during the construction phase. The project is led by the City of San Marcos with Scripps Health as the applicant, and it is designed to expand regional healthcare capacity for residents of San Marcos and North San Diego County. Public engagement and environmental review processes were initiated in August 2026, with a specific public comment period running from August 20 to September 21, 2026.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS