Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Underground Utilities

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity, titled Underground Utilities and managed by the Aviation Project Management Group in Washington, focuses on the installation of water distribution and storm drainage systems for Port of Seattle renovation projects. The scope of work involves installing water distribution piping, storm drain and culvert piping, as well as manholes, catch basins, and inlets to ensure the delivery of functional underground systems for prime contractors. The solicitation was posted on September 17, 2026, with a response deadline of October 22, 2026. Classified under NAICS code 237110, this project is specifically designed for those capable of executing specialized utility infrastructure within the aviation project framework.

General Info

Subcontract for installing water and storm drainage systems for Port of Seattle renovations.

Documents

This scope was carved out of MC-0322761.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Building 161E Renovation and Systems Retrofit_

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Aviation Project Management Group
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water distribution and storm drainage systems for prime contractors on Port of Seattle renovation projects. Installs water distribution piping, storm drain and culvert piping, and manholes, catch basins, and inlets. Delivers functional underground water and storm systems.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing facilities. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope also encompasses electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project emphasizes the inclusion of minority, women, and disadvantaged business enterprises, offering assistance with bonding, insurance, and materials to maximize their participation.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Washington → Aviation Project Management Group

Same awarding agency

NAICS: 335110
New
SLED
LED Runway and Taxiway Lighting Materials
Solicitation # 26-94
The Port of Seattle is soliciting bids for the procurement of LED runway and taxiway lighting materials for Seattle Tacoma International Airport. This contract aims to establish a standard manufacturer for airfield lighting materials as the airport transitions to LED technology over a four-year period from 2027 through 2030. The contract will be awarded to the lowest priced, technically acceptable, responsive, and responsible bidder. The period of performance extends from the date of execution through December 31, 2030, with the initial purchase of materials required for delivery by April 1, 2027. Technical requirements mandate that all new fixtures be sourced from a single manufacturer and comply with FAA specifications AC 150/5345-53, AC 150/5345-46, and AC 150/5345-43. Deliverables include various LED lighting fixtures and transformers, with elevated fixtures requiring specific mounting hardware for 12-inch L-867 base cans. The contract requires a 12-month general warranty against defects and a specific 4-year manufacturer warranty for LED fixtures. Bidders must be registered and licensed in the State of Washington and provide fully burdened unit pricing across the four-year delivery schedule. Submissions are due electronically by October 21, 2026, and must include a bid form, entity information sheet, pricing schedule, specification checklist, and technical supporting documentation.
Electric Lamp Bulb and Part Manufacturing

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS