Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Uninterruptible Power Supply (UPS) System Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the supply and installation of two new Uninterruptible Power Supply (UPS) systems, incorporating essential components such as battery chargers, safety disconnects, bypass breakers, and transformers. The scope includes the removal of outdated equipment and seamless integration of the new UPS units into the existing electrical infrastructure, ensuring improved system reliability and continuity of power. The project is managed by the Great Plains Regional Office under the Department of the Interior, categorized under the NAICS code 238210, which relates to electrical contractors and other wiring installation contractors. The work is designated as a subcontract with no specified set-aside type. Although specific location details and points of contact are not provided, the contract was posted on April 21, 2026, and aims to enhance the operational resilience of critical electrical systems through modernization and replacement of obsolete power supply units.

General Info

Supply and install two UPS systems including removal of old equipment and integration.

Agency

Department Of The Interior → Great Plains Regional OfficeView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

MT

Set-Aside

NONE

Documents

This scope was carved out of 140R6026R0008.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z--WY CCC UPS & Breaker Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Great Plains Regional Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Great Plains Regional Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of two new UPS systems, including battery chargers, safety disconnects, bypass breakers, and transformers. Involves removal of obsolete units and integration into existing electrical infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 13 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of The Interior → Great Plains Regional Office

Same awarding agency

NAICS: 335311
Federal
61--UNITROL 6800-Exciter HMI & Firmware Upgrade
Solicitation # 140R6026Q0114
Solicitation 140R6026Q0114 is a request for quotes issued by the Bureau of Reclamation, Missouri Basin Regional Office, for the upgrade of six UNITROL 6800 Exciter Human Machine Interface (HMI) units and associated firmware. The project focuses on replacing obsolete terminals and migrating operating systems from Windows XP/7 to Windows 10 to improve reliability and ensure compliance with cybersecurity and regulatory standards, including NERC-CIP, NIST 800-53, ISA-99, and IEC 62443. The scope includes the procurement of ABB brand-name hardware, such as the ECT Panel Model TPC-1551Tb and specific software licenses, along with certified engineering services for installation, power-up support, and the recommissioning of the exciter to resolve a critical Power System Stabilizer firmware bug. This procurement is a total small business set-aside, requiring offerors to be actively registered in SAM.gov and to provide exact ABB brand-name products to be considered technically acceptable. The period of performance is scheduled from September 1, 2026, to March 1, 2027, with delivery set for March 1, 2027, at the Grand Coulee Dam facility in Washington. Award will be based on a comparative evaluation of technical and price factors to determine the most advantageous offer to the government. Contractors must adhere to strict safety protocols, including Grand Coulee Lockout/Tagout procedures, and utilize the Invoice Processing Platform (IPP) for electronic payments. Following several amendments, the final quote submission deadline was extended to September 14, 2026.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

16 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS