This Solicitation opportunity from Department Of Defense was posted on November 20, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Unit 1 and 2 Turbine/Generator Rehab at Philpott Powerhouse in Basset, VA

Closed
W9127820R0069Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 7 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Bassett, VA, 24055, USA

Set-Aside

NONE

Documents

14

W9127820R0069+Amendment+0001.pdf

PDF

W9127820R0069+Amendment+0002+w+attachments.pdf

PDF

W9127820R0069+Amendment+0003+with+attachments.pdf

PDF

W9127820R0069+Amendment+0004+with+Attachments.pdf

PDF

W9127820R0069+Amendment+0005+with+Attachment.pdf

PDF

W9127820R0069+Amendment+0006+with+Attachment.pdf

PDF

W9127820R0069+Contract+Drawings.pdf

PDF

W9127820R0069+Corrected+Amendment+0002+w+attachments.pdf

PDF

W9127820R0069+Reference+Drawings+1+of+5.pdf

PDF

W9127820R0069+Reference+Drawings+2+of+5.pdf

PDF

W9127820R0069+Reference+Drawings+3+of+5.pdf

PDF

W9127820R0069+Reference+Drawings+4+of+5.pdf

PDF

W9127820R0069+Reference+Drawings+5+of+5.pdf

PDF

W9127820R0069++Solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 3, 2020 to Dec 1, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Dec 1, 2020 to Dec 8, 2020. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA

Full Description

Show more
Amendment 0006 is issued on 20 November 2020, see attachment W9127820R0069 - Amendment No. 0006 Amendment 0004 is issued on 10 November 2020, see attachment W9127820R0069 - Amendment No. 0004 Amendment 0003 is issued on 28 October 2020, see attachment W9127820R0069 - Amendment No. 0003 Amendment No. 0002 is issued with a correction on Block 2 SF 30 changing it from 0001 to 0002. Issued on 30 September 2020. Amendment 0002 is issued on 30 September 2020, see attachment W9127820R0069 - Amendment No. 0002 Amendment 0001 is issued on 29 June 2020, see attachment W9127820R0069 - Amendment No. 0001 The Government intends to award one Firm Fixed Price 'C' type contract as a result of this solicitation. The work to be performed under this contract consists of perform all work required to rehab two hydroelectric generating turbine units at Philpott Powerhouse, Basset, VA. The contractor shall be responsible for field verifying existing drawings and creating as-built drawings. The contractor shall furnish all labor, material, and equipment to perform this work in strict accordance with the detailed requirements of the Scope of Work (SOW) specifications and associated drawings. The work described within these specifications shall include, but not necessarily be limited to the following: Perform all work required to comply with the site operations, environmental protection, and safety and health provisions. Perform all work required for painting including lead-based paint removal and disposal. Perform all work required for miscellaneous welding, machinist, electrician, and other skilled craftsman hire. Replace draft tube man door. Replace mounts for turbine maintenance platform (TMP). Design, manufacture, prepare, and load for shipment, deliver f.o.b. destination, and unload the Francis turbine runner and appurtenances. The runner design will using computer aided turbine design and numerical flow simulation methods, and evaluation techniques. Design, manufacture, prepare, and load for shipment, deliver f.o.b. destination, and unload the wicket gates. The wicket gate design will using computer aided turbine design and numerical flow simulation methods, and evaluation techniques. Disassemble generating unit by removing rotating and stationary components and related ancillary systems. Perform alignment investigations and provide recommendations. Analyze and provide recommendation on the wicket gate mechanism component and shear linkage design. Inspect and refurbish, or replace miscellaneous turbine and generator mechanical components and piping including but not limited to: brake cylinders, brake rings (option), wicket gate shear linkages, runner wearing rings, turbine shaft packing box and gland, wicket gate packing boxes and glands, servomotor, seals, runner coupling bolts, and other components as specified. Disassemble, inspect, and refurbish the gate shaft and operating ring. Replace all greased bushings with self-lubricating and rehabilitate or replace all mating journals and running surfaces to stainless steel. Work shall include line boring of the bottom ring and head cover bushing housings and bushings. Remove grease lines, plug holes, and equipment. All grease lines and equipment will remain property of the Government. Perform draft tube liner inspection and repair. Replace generator air coolers and size appropriately to the uprated generator. Inspect turbine and generator guide bearings and generator thrust bearings with option for refurbishment. Inspect thrust bearings with option for refurbishment. Supply and install RTDs for each bearing shoe for the Thrust and Generator Guide Bearings. Replace cooling and packing water piping 1 " and smaller (steel) or 3" and smaller (copper). Remove existing generator fire protection system (high pressure CO2) and replace with new low pressure CO2 system. Reassemble generating unit with a new turbine runner and appurtenances and other rehabilitated and replacement components. Clean turbine pit, generator, and work and storage areas used by the Contractor. Dispose of (recycle) grease, etc. Perform complete alignment of the turbine/generator unit. Perform pre and post operational tests on the generating unit. Design, manufacture, and perform voltage endurance testing on four (4) total prototype coils (only required for first unit). Design, manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload one complete set of stator coils and all accessories specified herein. Furnish new stator core. Replace the rotor field poles. Replace the existing pole bodies, remove the existing field coil insulation, reinsulate the existing field coils, assemble the reinsulated field coils with the new pole bodies, install new amortisseur winding, and reinstall pole assemblies on the rotor. Replace the field lead bus stand-off insulators from the slip ring to the field winding. Inspect and test the rotor. Install and test new stator winding and accessories specified herein. Remove existing and install new stator cores. Rewind rotating exciter armature. Reinsulate rotating exciter field winding. Refurbishment of collector rings and replacement of brushes, and brush holders. Supply spare parts. Perform generator special field tests. Perform start-up, commissioning, and testing of the generator. Perform electrical equipment/wiring removal and installation including replacement of cable, wiring, gauges/meters, miscellaneous relays, and RTDs within the air housing, turbine pit, and associated with all bearings as required and directed. Note No. 1: All prospective contractors and their subcontractors and suppliers must be registered in System for Award Management (SAM) before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov/SAM/ prior to award of this contract. Solicitation documents, plans and specifications will only be available via SAM. Registration for plans and specifications should be made via SAM Internet Homepage. If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. This solicitation will not be issued on CD-ROM. Neither telephonic, mailed, nor fax requests will be accepted. Registration should be completed one week prior to the issue date. It is therefore the Contractor's responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. Plans and specifications will not be provided in a printed-paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government's best interest. NOTE: This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. N ote No. 2: All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, shall be electronic format with the proposal. N ote No. 3: Critical path method (network analysis system) is not required. N ote No. 4: For this job, a small business is defined as having average annual receipts of less than $39,500,000 for the past three years. N ote No. 5 All advertisements of Mobile District projects will be through the System for Award Management (SAM). Detailed information on this and other Mobile District Projects (Ordering Solicitations, Points of Contact, Synopsis of Work, etc.) are available on the Internet at: https://www.sam.gov. Address questions concerning downloading of plans/specifications to the Contract Specialist indicated above. N ote No. 6: Site Visit information will be posted with the solicitation. N ote No. 7: The request for information (RFI) process for bidder inquiries during the advertisement period will be through the ProjNet internet based system, and specifics will be contained in the RFP solicitation package available exclusively from SAM. Other forms of communicating RFIs to the Government will not be honored. The Government will try to respond to all questions.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
Solicitation W9127826RA087 is an unrestricted, two-phase, design-build construction project issued by the U.S. Army Corps of Engineers, Mobile District. The project involves the construction of a multi-level Operations Division office building for the Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work encompasses all necessary labor, equipment, and materials for site work, utilities, and environmental remediations, ensuring compliance with Department of War, U.S. Federal, and partner nation codes. The project has an estimated value between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars; any proposal exceeding this limit will be deemed non-responsive. The anticipated completion period is 545 days. The procurement process is divided into two phases, with Phase One focusing on the evaluation of proposals to select a maximum of five firms for Phase Two, where detailed design requirements will be provided. Award will be based on a non-price/price trade-off analysis to determine the best value, prioritizing the design concept, preliminary schedule, and small business participation. Key requirements include a 100 percent performance bond, adherence to EM 385-1-1 safety standards, and the provision of a specialized design-build team including a Design Quality Control Manager. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS