Savannah Harbor Expansion Project (SHEP), Fish Passage Weir and Floodplain Bench, Augusta, GA

Closed
W912HN21R5000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 16 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 16 hours ago

DEADLINE

in about 14 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 16 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 21 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Augusta, GA, 30905, USA

Set-Aside

NONE

Documents

23

Amendment 0002 for W912HN21R5000 - Fish Passage and Floodplain Bench

PDF, High priority: read this firstamendment
High

W912HN21R5000 Amendment 0003 - Savannah Harbor Expansion Project

PDF, High priority: read this firstamendment
High

W912HN-21-R-5000 As-Built and Construction Drawings

PDF, High priority: read this firstspecifications
High

W912HN21R5000 - Savannah Harbor Expansion Project (SHEP)

PDF, High priority: read this firstrfp
High

W912HN21R5000-0001 Site Visit Sign In Sheet

PDF, Low priorityother
Low

B.08+W912HN21R5000-0001.pdf

PDF

B.08+W912HN21R5000-0001+Site+Visit+Slides.pdf

PDF

Drawings+W912HN21R5000-0003+Part+1.pdf

PDF

Drawings+W912HN21R5000-0003+Part+2.pdf

PDF

W912H21R5000-0002+vol1.PDF

PDF

W912HN21R5000-0002+Pre-Bid+Contractor+Questions+11.4.20.pdf

PDF

W912HN21R5000-0002+vol3.pdf

PDF

W912HN21R5000-0003+Vol1.PDF

PDF

W912HN21R5000-0004.pdf

PDF

W912HN21R5000-0004+Vol+1.PDF

PDF

W912HN21R5000+Drawings.pdf

PDF

W912HN21R5000vol1.PDF

PDF

W912HN21R5000vol2a.pdf

PDF

W912HN21R5000vol2b.pdf

PDF

W912HN21R5000vol2c.pdf

PDF

W912HN21R5000vol2d.pdf

PDF

W912HN21R5000vol3.pdf

PDF

W912HN21R5000vol4.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Nov 19, 2020 to Dec 1, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
This solicitation is Lowest Priced Techically Acceptable(LPTA) stand alone contract. The U.S. Army Corps of Engineers, Savannah District intends to award a contract on the basis of this notice. Location of Work: The proposed Fish Passage at the New Savannah Bluff Lock & Dam work is located along the Savannah River at the existing New Savannah Bluff Lock and Dam. The existing New Savannah Bluff Lock & Dam (NSBLD) and New Savannah Lock and Dam Park areas located on the Savannah River in Richmond County, Georgia and Aiken County, South Carolina, about 13 miles southeast of the City of Augusta downtown area and approximately 187 miles upstream of the Atlantic Ocean. The proposed Fish Passage channel will be located on government-owned property in Richmond County, Georgia and Aiken County, South Carolina. Background: The NSBLD project was authorized by the 1930 and 1935 Rivers and Harbors Acts for the sole purpose of improving commercial navigation on the Savannah River between the upper limits of the Savannah Harbor and Augusta, Georgia. In 1979, maintenance of the navigation channel was discontinued and according to the most recent Periodic Inspection (2014) the current condition of the project is poor. The dam consists of a lock and gated spillway. Although the NSBLD no longer serves commercial navigation, the pool impounded above behind the dam provides water supply for multiple users, including two municipalities and several industries upstream. The lock was also operated to pass migratory anadromous fish species until it was closed in May of 2014 due to significant deterioration and structural issues. An inspection of the lock and dam structure was conducted in 2016 to develop a list of recommended repairs to support the fish passage. In 2019, the United States Army Corps of Engineers (USACE) Savannah District recommended that a fixed weir rock arch fish passage with a floodplain bench be constructed to replace the NSBLD and support fish passage (USACE Savannah District 2019). Description of Work: This project is to construct a fish passage and floodplain bench at the NSBLD site. The nature-like rock weir fish passage was designed to address passage of the entire suite of native aquatic life in the Savannah River while addressing hydraulic, geomorphic, stability and safety issues based on proven concepts in nature-like fish passage. The rock arch rapids concept has been applied at over 100 sites in Minnesota, North Dakota, Iowa, Wisconsin, Michigan, Illinois, New York, Maine, North Carolina, and other states. The floodplain bench is designed to handle excess flows in the Savannah River from 8,000 cfs to 25,000 cfs. The Fish Passage contract constitutes the largest segment of proposed New Savannah Bluff work and is intended as a follow-on to the First Order of Work services. The project has been conceived with the assumption that all construction access will be from the Georgia property owned by the USACE. With no upper pool property available at the construction site for mooring along the Georgia shoreline, the Contractor will need to secure an offsite loading dock for marshalling of materials, dockage for numerous transport and work barges. With much of the reliant on marine construction, there will be a high reliance on careful river flow regulation. The scope of this contract includes three major construction features: (1) construction of a 175-foot wide rock and vegetation-lined floodbench channel to help alleviate peak river flows, (2) construction of a 12 acre rock arch fish passage structure upstream of the present dam, and, (3) demolition of the existing dam and lock structures. When complete, the Fish Passage structure will cover any remaining deep foundations or concrete remnants from the dam or lock structures. Shorelines on both the South Carolina and Georgia shores will be cut back to 1v:4h stable sideslopes and armored with imported 14-inch diameter granite riprap. Floodbench construction entails demolition of present park features, including remaining park roadways and other surface features. Topsoil and lawn areas will be stripped before 116,000 CY of soil material is excavated and disposed offsite. During excavation, soil plugs will remain at both upstream and downstream river openings. A permanent 20-foot wide stone weir constructed with D50=21" 3.5-foot thick armor layer will have an impermeable sheetpile core extended across the upper floodbench entrance. The weir elevation of 113.0 will limit flows greater than 8,000 cfs into the overflow channel. Stone armor on sideslopes and the channel bottom will be a rock section consisting of 1.9-foot armor layer of D50=14" granite riprap over continuous layers of 12-inch layer of GDOT Type II Stabilizer Aggregate "bedding stone" and a heavy 12-ounce non-woven geotextile fabric. To aid in floodbench construction, the Fish Passage Contractor is to construct 1,350 feet of 28-foot wide aggregate roadway for access following the floodbench top-of-slope. Two additions to the floodbench are a full-width 400-foot long section of the floodbench bottom reinforced with a geosynthetic grid with soil infill and seeded with a native seed mix suited to wet soils. Once established, vegetation is expected to require little maintenance other than removal of larger trees or shrubs that could inhibit flows through the floodbench. To complete floodbench construction, tops of the downstream lock walls need to be demolished so that floodbench flows can reach the Savannah River. The second major feature and by far the largest item of the Fish Passage contract will be the actual rock arch fish passage structure. Two large combi-wall temporary cofferdams will be used to construct the bifurcated 12-acre terraced rock footprint. The completed structure will be 900'x 500' plus abutting shorelines. The rock structure will be constructed inside dry cofferdams using GPS controlled equipment to assure critical elevations are produced and maintained within specified tolerances. The full width upper 300 feet of structure armoring will consist of 3.5 feet of Type A D50=21" granite armor stone over a 12 inches of GDOT Type II Stabilizer aggregate. A continuous layer of heavy 12-ounce non-woven geotextile fabric will separate bedding stone from a prepared base or, where required, an estimated 116,000 tons of imported GDOT Type 3 riprap underlayer stone. A second smaller placement of the heavier Type A armor stone will be in the floodbench weir armoring. Total bid quantity of the larger Type A Armor Stone will be 46,000 tons. The remainder of the downstream fish passage surface footprint, upstream and downstream 1v:4h stone approaches, and riverbank 1v:4h sideslopes will use a lighter, Type B Armor Stone section with D50=14". Project modeling has demonstrated expected peak river velocities will be lower across these armored areas. This lighter armor section will consist of a 1.9-foot minimum thickness of Type B Armor Stone, 12" of bedding stone, and heavy geotextile separator fabric. Imported underlayer aggregate fill will also be required in deeper locations, primarily on the Georgia half of the river near the lock. A minimum of 82,000 tons of Type B Armor Stone will be required to construct the remainder of the fish passage and abutting sideslopes. The flow controlling feature of rock arch fish passages, are the 1850+ large 4-to-10 ton granite "Weir Stones" that are set to a 2 percent grade and embedded 12"+ into the armor stone surface and project 2 to 3 feet, where defined, above armor stone. Each of the 23 each 500+-foot long arches are placed in lines spanning the river with intermediate gaps between weir stones varying from 1 foot to 4 feet. Larger gaps are staggered to form a sinusoidal flow pattern intended to lower velocities needed to facilitate fish passage through the structure. The fish passage design also includes four smaller cobblestone or "glide" stone beds primarily for robust redhorse propagation. The four beds total 11,500 square feet and are located on upper and middle terraces along each Two permanent steel pile wall structures are needed to accommodate the fish passage layout. A 313-foot long cantilever combi-wall is required along the upstream South Carolina shoreline, and a second 215-foot cantilever wall will be installed along the upstream property line on the Georgia side at the upstream end of the floodbench. Lastly, the third major item within the Fish Passage contract will be demolition of the present dam, lock and esplanade structures. Demolition work will largely be in accordance with a Contractor-prepared work plan and coordinated with other ongoing construction sequencing. Much of the lower demolition work for the lock and dam structure removals is to be performed "in the dry" and within cofferdams. Working in the dry will facilitate removals of equipment, piping and conduits from the earlier structures. Upon completion of construction, the Fish Passage Contractor will restore the site and demobilize job trailers and equipment. Evaluation Criteria: This contract will be solicited and procured using FAR Part 15.101-2 Lowest Price Technically Acceptable (LPTA) source selection procedures in rendering the best value decision for award of this contract. The nonprice evaluation factors for this solicitation are as follows: FACTOR 1: CORPORATE RELEVANT SPECIALIZED EXPERIENCE FACTOR 2: PAST PERFORMANCE The Government will evaluate all proposals and those offerors achieving Acceptable ratings in both technical factors will then be evaluated by price with the lowest price offeror to be selected for award. Note: Please note that the proposal due date is specified in the solicitation. No additional media (CD-ROM, floppy disks, faxes, etc.) will be provided. Any prospective Offeror must register in the System for Award Management (SAM) at https://www.sam.gov. After completing SAM registration, interested Contractors and their subcontractors must then register at https://beta.sam.gov in order to obtain solicitation documents, plans and specifications for this solicitation. Contractors that have an existing account should be able to use their existing logins to search for the solicitation number once it is released at https://beta.sam.gov. It is the Offeror's responsibility to check the Internet address provided as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. Contractual Questions should be forwarded to Contract Specialist, Jennifer Cavanagh at jennifer.s.cavanagh@usace.army.mil or to the attention of Contracting Officer, Whittni Hiscox at Whittni.C.Hiscox@usace.army.mil.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 541620
New
Federal
Requirement to support the Formerly Used Defense Sites (FUDS) Program Single Award Task Order Contract (SATOC)
Solicitation # W912HN-27-S-1001
The United States Army Corps of Engineers Savannah District is conducting market research for a Single Award Task Order Contract (SATOC) to provide comprehensive Environmental Consulting Services (ECS) in support of the Formerly Used Defense Sites (FUDS) program. Under NAICS code 541620, the selected contractor will provide program management, administrative, logistical, and community relations support for the South Atlantic Division. Key responsibilities include maintaining the FUDSMIS database and FUDS Documents portal, developing Project Management and Site Management Action Plans, coordinating Cost-to-Complete estimates, and managing community outreach activities such as Restoration Advisory Board meetings and the creation of Section 508-compliant materials. All task orders under this contract will be performance-based in accordance with FAR 37.6 and FAR 37.102, utilizing a tailored Quality Assurance Surveillance Plan (QASP). The prime contractor must possess a Facility Clearance (FCL) and ensure personnel complete required OPSEC and Controlled Unclassified Information training. Additionally, personnel performing IA/IT services must comply with DoD 8570.01-M certifications. Deliverables must be uploaded to government-controlled platforms to prevent vendor lock-in. Interested respondents must submit their business identification, size status, and corporate structure via the provided survey link by November 18, 2026.
Environmental Consulting Services

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract under NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small control tower, a small arms range operations control area, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, and latrine pads. Supporting infrastructure requirements encompass electric service, site improvements, information systems, cybersecurity measures, and sustainability energy measures. The period of performance is 720 calendar days following the notice to proceed. Technical requirements are extensive, covering underground electrical distribution, telecommunications outside plant infrastructure, and specific structural standards for metal roof and wall panels, unit masonry, and concrete. Key deliverables include the installation of fiber optic cabling, grounding and lightning protection systems, and the emplacement of various infantry and armor targets. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Following several amendments to revise drawings and specifications, the final bid opening date is established as October 30, 2026, at 2:00 PM local time. Offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Commercial and Institutional Building Construction

POSTED

about 16 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging Select Sites
Solicitation # W912HN27S5000
The Savannah District Corps of Engineers is conducting a sources sought market research effort to identify capable contractors for the FY26 Atlantic Intracoastal Waterway maintenance dredging project. The scope of work involves unclassified dredging at Hell Gate and Florida Passage in Chatham County, Georgia, and Fields Cut in Jasper County, South Carolina. The project requires dredging to an authorized width of 150 feet and a depth of 12 feet, with an estimated total removal of 265,000 cubic yards of material. Dredged sediment will be transported via pipeline or alternative methods to beneficial use sites or confined upland containment areas, with some transport distances reaching up to 9 miles. The estimated magnitude of this requirement is between 5 million and 10 million dollars, falling under NAICS code 237990 with a size standard of 45 million dollars. The expected duration of performance is 165 days from the notice to proceed. Contractors must demonstrate capabilities in hydraulic cutterhead dredging, island shaping to specific slopes, and the use of low ground pressure or aquatic equipment for soft foundations. Additionally, the government is seeking evidence of experience operating in environmentally sensitive areas, managing high vessel traffic, and working within tidal cycles featuring flows up to 4 feet per second. Responses must be submitted via PIEE by November 20, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS