This Solicitation opportunity from Nebraska was posted on January 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNO Medium Voltage Infrastructure Phase 3-Cable Installation-13731
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The University of Nebraska-Lincoln is soliciting proposals through an electronic bidding system for the final phase of a medium voltage distribution project, specifically Phase 3, which involves installing and connecting medium voltage cables from a new 15kV switchgear to existing pad-mount switches and building transformers across campus. Bidders must register on the eBid platform to access detailed project information and submit responses electronically, as paper bids are not accepted. The scope includes the phased installation, connection, and concurrent disconnection and removal of existing medium voltage infrastructure, including duct banks, manholes, and switchgear, which are already in place. The project is estimated to be valued between two and five million dollars and is open to qualified contractors under the NAICS code 541715. The solicitation was posted on January 16, 2025, with a response deadline of February 11, 2025. Interested bidders can contact the designated senior sourcing agent, Chris Dier, via email or phone for further information. Additional project details and bid documentation are accessible through the provided online link.
General Info
Place of Performance
NE, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The University of Nebraska is requesting proposals from qualified bidders to provide all material and labor for the last phase required to complete the medium voltage distribution from a new stand-alone switchgear building north of the existing ceramics studio. The scope of Phase 3 involves the phased installation and connection of the medium voltage cable from the 15kV switchgear to owner-furnished pad-mount switches across campus; the cable is then connected from each pad-mount switch to the individual building transformers. This new work will be concurrent with the disconnection and removal of the Allwine switchgear and the existing medium voltage cable on campus. The duct banks, manholes, switchgear building, and switchgear are existing.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS