This Solicitation opportunity from Cherokee Nation was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cherokee Nation Cultural and Economic Development, L.L.C. is soliciting bids for the construction of a restroom addition at Sallisaw Creek Park in Sallisaw, Oklahoma. The project involves a construction area of approximately 936 square feet and requires the contractor to provide all labor, materials, equipment, and supervision necessary to complete the facility according to detailed architectural, civil, structural, mechanical, plumbing, and electrical plans. Key technical requirements include adherence to specific geotechnical recommendations for moisture-sensitive clays and shallow bedrock, as well as compliance with municipal regulations, OSHA standards, and various industry codes.
Bids must be submitted via email by August 19, 2025. The procurement process emphasizes preferences for Cherokee Nation-owned businesses and other federally recognized tribal enterprises, requiring all bidders and subcontractors to provide a Tribal Employment Rights Office certificate. Contractors must meet stringent insurance requirements, including general liability, automobile, and pollution liability coverage, and must name the company and its affiliates as additional insureds. The project is governed by a strict code of conduct for jobsites and requires adherence to specific product substitution controls and quality-control testing standards.
HighAI Summary for 163747_25-0617_CN_Sallisaw_Park_Drawings_100 - Cherokee Nation Park Sallisaw Creek Restroom Addition Drawings: This document is a set of construction drawings for the Cherokee Nation Park Sallisaw Creek Restroom Addition located at 457959 E. 1118 Road, Sallisaw, Oklahoma. It includes an index of drawings covering general, civil, architectural, structural, mechanical, plumbing, and electrical plans. The project directory lists key contacts including the owner, architect, and various engineers. The document provides detailed general site notes, paving notes, concrete pavement specifications, and utility notes. It outlines compliance requirements with municipal regulations, OSHA standards, and construction codes, as well as technical details for materials, joint spacing, reinforcement, and coordination with utility providers. The construction area is approximately 936 square feet.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for 163747_CN_Park_Geotechnical_Report Revised July 1, 2019: This Revised Geotechnical Engineering Report dated July 1, 2019, presents the findings of the geotechnical investigation for the National Cherokee Nation Park in Sequoyah County, Sallisaw, Oklahoma. Prepared for Cherokee Nation Entertainment, LLC, the report covers site description, subsurface borings, laboratory testing, soil and bedrock conditions, earthwork, foundation recommendations, pavement design, and construction observation. Key considerations include variable soil and bedrock conditions, moisture-sensitive clays, undocumented fill near structures, and foundation bearing capacities. The report classifies the site as Site Class C per the 2012 IBC and recommends retaining Palmerton & Parrish, Inc. for construction observation and materials testing to ensure proper subgrade and pavement performance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 163747_CN_Sallisaw_Restroom_Addition_Specification_100: Project Manual for Cherokee Nation Park Sallisaw Creek Restroom Addition located at 457959 E. 1118 Road, Sallisaw, Oklahoma, dated June 17, 2025. The document includes general requirements and divisions 01 through 32 covering all aspects of construction such as concrete, masonry, wood, roofing, openings, finishes, specialties, plumbing, mechanical, electrical, and fire alarm systems. It also contains an index of drawings and instructions to bidders outlining bid submission, conditions, and interpretation of bidding documents. This comprehensive specification document serves as a critical technical guide for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 01 for Cherokee Nation Sallisaw Park Improvements: This document is Addendum Number 01 dated August 6, 2025, for the Cherokee Nation Sallisaw Park Improvements project located at 457959 E. 1118 Road, Sallisaw, Oklahoma. It modifies the original bidding documents by replacing drawing C5.0 with an updated version reflecting a flume elevation update. The addendum includes detailed general grading notes outlining construction compliance, site grading, utility verification, soil and compaction requirements, excavation tolerances, drainage, and landscaping instructions. It emphasizes adherence to geotechnical reports and local codes, ensuring proper site preparation and positive drainage throughout the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 01 for Sallisaw Park Improvements 457959 E. 1118 Road: This document is Addendum Number 01 dated August 6, 2025, for the Sallisaw Park Improvements project located at 457959 E. 1118 Road, Sallisaw, Oklahoma. It modifies the original bidding documents by replacing drawing C5.0 with an updated version reflecting a flume elevation update. The addendum is part of the contract and includes general grading notes outlining construction compliance, site grading, utility verification, soil and compaction requirements, excavation tolerances, drainage responsibilities, and restoration of disturbed areas. The document ensures contractors follow updated technical specifications and site preparation instructions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 02 for CN Sallisaw Park Improvements: This document is Addendum Number 02 dated August 14, 2025, for the Cherokee Nation Sallisaw Park Improvements project. It modifies the original bidding documents by approving manufacturer substitutions, providing preconstruction RFI responses clarifying scope and specifications, and detailing changes to specifications and drawings including roofing and fire alarm sections. The addendum includes revised finish schedules, removal of certain scope items, and updated drawings dated August 12, 2025. It also contains a new specification section 073113 for asphalt shingles with detailed requirements for materials, submittals, quality assurance, and installation standards.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 for Cheroke Nation Sallisaw Park Improvements: Addendum Number 02 dated August 14, 2025, for the Cheroke Nation Sallisaw Park Improvements project in Sallisaw, Oklahoma. This document modifies the original bidding documents by approving manufacturer substitutions, providing preconstruction RFI responses clarifying scope and specifications, and detailing changes to specifications and drawings including roofing and fire alarm system omissions. It includes specification section 073113 for asphalt shingles and revisions to multiple drawing sheets dated August 12, 2025. The addendum ensures all changes are incorporated into the contract and clarifies contractor responsibilities and product requirements.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for Cherokee Nation Park Sallisaw Creek Restroom Addition Drawings: This document contains detailed construction drawings for the Cherokee Nation Park Sallisaw Creek Restroom Addition project located in Sallisaw, Oklahoma. It includes an index of general, civil, architectural, structural, mechanical, plumbing, and electrical drawings. The document provides project directory information, general site notes, paving notes, concrete pavement specifications, and utility notes. The drawings and notes specify compliance with municipal regulations, OSHA standards, and construction codes, along with detailed technical requirements for materials, joint spacing, reinforcement, and utility coordination. The construction area is 936 square feet.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cherokee Nation Park Sallisaw Creek Restroom Addition Project Manual and Instructions to Bidders: This document is the Project Manual for the Cherokee Nation Park Sallisaw Creek Restroom Addition located in Sallisaw, Oklahoma, dated June 17, 2025. It includes general requirements covering divisions 01 through 32, detailed specifications for construction materials and methods, and an index of drawings for architectural, structural, mechanical, plumbing, and electrical plans. Additionally, it contains Instructions to Bidders outlining bid submission requirements, conditions relating to construction, and procedures for interpretation or correction of bidding documents. The document serves as a comprehensive guide for contractors preparing bids and executing the construction work.
DOC
DOC, High priority: read this firstcode-of-conduct
HighAI Summary for Code of Conduct for Cherokee Nation Businesses Jobsites: This document is the Code of Conduct for Cherokee Nation Businesses (CNB) jobsites, outlining behavioral and operational expectations for contractors and their subcontractors working on CNB construction projects. It emphasizes safety, respect, professionalism, and environmental care, including prohibitions on smoking, profanity, illegal drugs, and offensive clothing. The code mandates proper site maintenance, secure job sites, respectful interaction with visitors, and adherence to work schedules and safety protocols. Contractors must ensure their teams agree to and follow this code, which aims to maintain a safe, respectful, and professional work environment for all involved and the surrounding community.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for Revised Geotechnical Engineering Report for National Cherokee Nation Park: This Revised Geotechnical Engineering Report (Rev. 1, July 1, 2019) was prepared for Cherokee Nation Entertainment, LLC for the proposed National Cherokee Nation Park in Sequoyah County, Sallisaw, Oklahoma. The report summarizes the results of a geotechnical investigation including subsurface borings, laboratory testing, and site geology. It provides detailed geotechnical considerations for various site conditions such as soils, bedrock, groundwater, and earthwork recommendations. The report includes foundation design recommendations for light and heavily loaded structures, pavement design, seismic considerations, and construction observation/testing guidance. The site is generally suitable for the proposed development, with specific recommendations for dealing with variable soil conditions, shallow bedrock, and moisture-sensitive clays. The report emphasizes the need for continued geotechnical review during final design and construction phases.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for RFP 163747 Sallisaw RV Park Restroom Addition: This Request for Proposal (RFP) numbered 163747, dated July 24, 2025, is issued by Cherokee Nation Cultural and Economic Development, L.L.C. for the Sallisaw Creek Park Restroom Addition project located in Sallisaw, OK. The document includes solicitation to bid, instructions to bidders, statement of work, bid form, confidentiality and non-collusion representations, and bond and insurance requirements. Key details include a pre-bid meeting on August 5, 2025, a question submission deadline of August 12, 2025, and bid submission deadline of August 19, 2025. Bids must be submitted by email due to COVID-19 protocols. The RFP outlines bidder responsibilities, qualification requirements, and compliance with Cherokee Nation Tribal Employment Rights Office (TERO) regulations.
DOCX
DOCX, High priority: read this firstbid-narrative
HighAI Summary for Sallisaw Creek Park Restroom Addition Construction Documents and Bid Narrative: This document outlines the construction scope and bid narrative for the Sallisaw Creek Park Restroom Addition project. It includes requirements for furnishing labor, materials, equipment, and supervision to complete the restroom addition per design documents and specifications. Contractors must review all construction documents and coordinate with architectural, civil, MEP, and structural engineering teams. Responsibilities include final grading and sod placement within project boundaries. The document emphasizes thorough review and integration of all disciplines and recommends project management software for tracking RFIs, submittals, product data, and schedule.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for 163747 Prebid Meeting Sign-In Sheet Salisbury Creek Park Restroom Addition: This document is a meeting sign-in sheet for the prebid meeting related to the Salisbury Creek Park - Restroom Addition project. The meeting was facilitated by Amy Eubanks and took place on August 5, 2025, at 11:00 AM at Salisbury Creek Park. The sheet includes multiple entries for attendees, primarily senior buyers, who signed in to acknowledge their attendance and agree to confidentiality regarding the meeting information.
PDF
PDF, Low prioritycertificate-of-insurance
LowAI Summary for Certificate of Insurance for Cherokee Nation Businesses: This Certificate of Insurance provides information about insurance coverage for Cherokee Nation Businesses, L.L.C. It lists various insurance policies including General Liability, Automobile Liability, Umbrella Liability, and Workers Compensation with their respective limits and conditions. The certificate clarifies that it is for informational purposes only and does not alter the coverage. It notes that Cherokee Nation Businesses is named as an additional insured and includes a waiver of subrogation and a 30-day cancellation clause in their favor. The document includes policy numbers, effective and expiration dates, and coverage limits, although some details are not filled in. The certificate holder's contact information is also provided.
PDF
PDF, Low prioritycertificate-of-insurance
LowAI Summary for Certificate of Insurance for Cherokee Nation Businesses L.L.C.: This Certificate of Insurance provides information about the insurance policies issued to the insured, including general liability, automobile liability, umbrella liability, and workers compensation. It specifies coverage limits, policy periods, and endorsements such as additional insured status and waiver of subrogation in favor of Cherokee Nation Businesses L.L.C. The certificate clarifies it is for informational purposes only and does not alter the coverage terms. It includes a 30-day cancellation notice clause and contact details for the certificate holder and producer.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for Meeting Sign-In Sheet Salisbury Creek Park Restroom Addition 8-5-2025: This document is a meeting sign-in sheet for the Salisbury Creek Park - Restroom Addition project, facilitated by Amy Eubanks. The meeting took place on August 5, 2025, at 11:00 AM at Salisbury Creek Park. The sheet records the names and titles of attendees, primarily senior buyers, and includes a confidentiality agreement regarding the information shared in the meeting.
Bids are being solicited by Cherokee Nation Cultural and Economic Development, L.L.C. (“Company”) or the Cherokee Nation Cultural and Economic Development, L.L.C wholly-owned entity identified in the attached Statement of Work to furnish pricing for a restroom project at the Sallisaw Creek Park.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award