Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on April 20, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UPS Compacitors and Fans Replacement

Awarded
36C25521Q0325Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334416
New
DIBBS
RESISTOR, FIXED, FILM
Solicitation # SPE7M3-27-T-0778
Solicitation SPE7M3-27-T-0778 is a small business set-aside request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 41 fixed film resistors, identified by NSN 5905011687459 and part number RLR05C1182FS. The items must comply with basic specification MIL-PRF-39017/5M and are subject to Qualified Products List or Qualified Manufacturers List requirements. Delivery is required within 119 days after the order, with an original required delivery date of December 21, 2026, and a need ship date of March 9, 2027. The items are to be delivered FOB Origin to the DLA Distribution Depot at Hill AFB, Utah. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for general marking. Additionally, the contractor must apply specific lead finish markings to each unit pack in accordance with IPC/JEDEC J-STD-609 to identify lead or lead-free attributes. Quality and technical requirements are governed by the DLA Master List, and inspection and acceptance will occur at the destination. The procurement includes various federal and defense clauses, including the Buy American Act, NIST SP 800-171 cybersecurity assessments, and prohibitions on the use of mercury and certain telecommunications equipment. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 334416
New
DIBBS
CAPACITOR, FIXED, MICA D
Solicitation # SPE7M2-27-T-0591
Solicitation SPE7M2-27-T-0591 is a small business set-aside request for quotations issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 72 fixed mica dielectric capacitors, identified by NSN 5910-01-093-6317. This critical application item must comply with basic specification MIL-PRF-39001/5F and reference specification MIL-PRF-39001F. Because the item is listed on a primary Qualified Products List or Qualified Manufacturers List, adherence to QPL or QML standards is mandatory. The required delivery date is June 2, 2027, with a need ship date of April 26, 2027, and a delivery lead time of 167 days after order. Shipping is FOB destination to DLA Distribution Warner Robins in Georgia. The contract mandates strict quality and environmental compliance, including a prohibition on the intentional addition of mercury and the use of Class I ozone-depleting substances. Packaging must follow MIL-STD-2073-1E and MIL-STD-129, with specific unit package marking for component lead finish required per IPC/JEDEC J-STD-609. Inspection and acceptance will occur at the destination. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with various FAR and DFARS clauses, including the Buy American Act, safeguarding of covered defense information, and the prohibition of certain telecommunications equipment. Quotations must be submitted through the DIBBS portal by November 9, 2026.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in 10 days

General Info

Contract Value

$30,631.64

NAICS

334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing

Place of Performance

Wichita, KS, 67218, USA

Set-Aside

SBA

Award Issued Date

Documents

1

36C25521Q0325-.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA

Full Description

Show more
Statement of Work UPS CAPACITOR AND FAN REPLACEMENT INTRODUCTION The Maintenance and Operations (Facilities) is responsible for the operation, maintenance and repair of Robert J Dole VA Medical Center; The Medical Center is located at 5500 East Kellogg (US 54) in Wichita, Kansas herein after referred to as the "job site". SUMMARY OF WORK The contractor will perform the work described below for the 9315 300/330kVA Full Capacitor and Fan Replacement on the (Cath Lab UPS) and the Mitsubishi 2033A 75kVA (:IT UPS) New Capacitor and Fan Replacements Parts - Cath lab Bldg. 2 (36) Duracap Capacitor - 5,800 uF, 300VDC (36) Aerovox Capacitor - 40uF, 600VAC, 4.75 Length, 2.5 Dia., Spade Terminals, Mounting (18) Aerovox Capacitor - 60uF, 370VAC, 3.875 Length, 2.5 Dia, Spade Terminals, Mounting Stud (3) Duracap Capacitor - 150.000. 35VDC (10) Cpp;trpm Fam-Axoa;. 24VDC. Sensing. Mew ) shipping, Freight, Delivery and Handling Charges - Ground f)Service/Labor for UPS - Normal Hours New Capacitor and Fan Replacements parts - IT area Bldg. 19 (8) Capacitor - 2800uF, 450 VDC (1) Capacitor - 3x298uF, 220 VAC (1) Capacitor - 3x83uF, 240 VDC (2) Capacitor - 0.027uF, 1600 VDC (1) Capacitor - 33,000uF, 35 VDC (2) Fan - Axial, 200VAC, 3 phases new New Capacitor Inspection Inspect new capacitor to ensure correct capacitor and quantity received. Inspect new capacitor for any damages prepare mew capacitor for installation Measure/test new capacitor Replacement With Client permission, take system out of service (transfer system to bypass). If required and available transfer system to external maintenance bypass. I NOTE: Some makes and models may require system and attached loads to be de-energized for Complete capacitor replacement. Disconnect and remove existing capacitor. Install new capacitor. Re-install capacitor connections a) Correct any corroded or damaged cables/connections. If external maintenance bypass was utilized. With client permission. Place system back into service (transfer unit out of bypass) Record as left condition. Discuss findings with customer and provide field service report. Dispose of old capacitors, packing, and refuse in client approved manor. Note 1: See capacitor proposal for additional scope of work. Note 2: Scope of work may be generic and subject to change to accurately reflect equipment on site. Note 3: Capacitor replacement performed in accordance with IEEE and OEM standards. Note 4: Complete power down of unit and supported loads may be required Responsibility Provide dates and times when the scheduled work can be performed Provide a point of contact during the tome of service Provide the name of project manager Have parties responsible for operation of the equipment for basic operator training Assumptions All service performed on-site by the contractor will be executed during the business hours unless otherwise requested by the customer. The contractor will provide the customer with certified service personnel to start-up the UPS. DEFINITIONS AUTHORITY - The Robert J. Dole VA Medical Center (Safety Officer) CMMS - Computerized Maintenance Management System (Vista) VA TECHNICAL REPRESENTATIVE -An Authority (Safety officer) specifically designated to assist in carrying out the responsibilities at the project site. CONTRACTOR'S PROJECT MANAGER (CPM) - The Contractor's employee who has the overall responsibility and authority to fulfill all the requirements of the Statement of Work. CORRECTION - Means the elimination of a defect. EMERGENCIES - Unscheduled maintenance and service required because the creating a safety potential hazard interfering with the operation of the Medical Center (IT and Gath Lab department), etc. GROUNDS - Includes land, parking lots, and roadways at the Medical Center. JOB SITE - The area within the Authority's property lines or portions of such area which are defined within the Contract or as described by the technical representative. LITTER - Debris, waste paper, water, cleaning products, personal protection equipment, containers, etc. M&O- Engineering and Maintenance Department, Maintenance Engineering Division MSDS - Material Safety Data Sheet OSHA - U.S. Occupational Safety and Health Administration. The Federal government agency PULL -A pull is the Contractors requirement to remove old batteries and stack on a wooden pallet. QUALITY CONTROL - A method used by the Contractor to assure that quality services are provided to satisfy the requirements of the contract. QUALITY ASSURANCE - A means by which the Authority to confirm that the quantity and quality of services received conform to contract requirements. These methods/procedures are not included to aid the Contractor in the performance of the contract requirements or be a substitute for contract quality control. RECYCLABLE - Any material which retains useful properties that can be reclaimed after the production or consumption process. SERVICES - Includes services performed, workmanship, and material furnished or utilized in the performance of services. SOW - Statement of Work STATE - Kansas TRASH - Waste that is not recyclable BASE SERVICES The Contractor shall be required to accomplish all the tasks and fulfill all the requirements of this SOW as described herein: INSPECTIONS Service shall be performed between 8:00 a.m. and 4:00 p.m., Monday through Friday, excluding federal holidays. Installation shall be scheduled with Engineering SeNice, giving a minimum of three (3) normal working days advance notice prior to arrival. Collection and Disposal All waste and bio-hazard materials collected and removed by the Contractor shall be contained, tied, or enclosed to prevent leaking, spilling, or blowing during transport. All waste and bio-hazard collected and removed by the Contractor shall be disposed of at an authorized licensed disposal site selected by the Contractor. The recycling material shall be collected in a single stream/commingled method. Disposal shall be in accordance with existing local, state, and federal regulations. The Contractor shall be responsible for any and all permits or fees associated with the disposal. The Contractor shall be responsible for immediately cleaning up any spills, debris, etc., which may occur during installation or removal of batteries. whether spilled by the Contractor or placed there by others, shall be picked up by the Contractor during collection. The Contractor shall thoroughly clean (interior and exterior) each container two times per year on a schedule acceptable to the Safety Officer. Reporting and Documentation Upon completion of work the VA technical representative shall be responsible for closing out the work order by inputting all relevant information data that relates to work performed by the Contractor. This information data shall include, but not be limited to; ticket number, name of technician(s), date of service, duration of work performance, specific service accomplished, labor, date completed and any comments necessary to explain corrective action or work performed. he Contractor shall meet this requirement by providing the required information on paper copies of the work orders, which will be provided by the Authority. Non- Performance In the event of non-performance of work by the Contractor, the VA technical representative will have the right to exercise one of the following options within ten (15) calendar days after the event of non-performance: The Contractor shall correct such Non-Performance upon notification by the Contracting Officer and the Authority shall make no deductions for Non-Performance. The Authority shall allow the Non-Performance to remain uncorrected and shall make a deduction from payments to the Contractor. When applicable, deductions shall be made in accordance with the following. Parking No airport parking shall be provided to the Contractor. . Security Provisions The Contractor shall comply with all the Authority's security requirements on the job site. Unless otherwise provided in the SOW, the Contractor shall not remove and/or possess of any confidential data, materials, supplies, or equipment, which are the property of the Authority. Keys shall include key cards, and other entry devices and/or codes provided by the Authority. The Contractor shall secure and safeguard all keys. The Contractor shall maintain a detailed record of the key issued to its employees. The Contractor shall not duplicate and shall not allow any such keys to be duplicated or removed from the job site. All keys and other entry devices used by the Contractor's employees in the performance of the work shall be returned to the Authority at the end of the period of the contract or as required by the Authority. The Contractor shall immediately report to the Authority all keys issued and all keys issued by the Authority which have been lost or stolen. The Contractor shall be responsible for all loss, damages and expenses which the Authority incurs as a result of the Contractor's loss of Authority keys. These costs include the expense of changing all locks to which the lost keys provided access. The Contractor shall ensure that, under no circumstances, any of his employees shall enter an area not authorized for access by the Contractor. The Authority may not issue keys to the Contractor for some restricted security areas at the Airport. Instead the Authority may require the Contractor's employees to be accompanied at all times in such areas by Authority security escorts. Safety The Contractor shall ensure that all its personnel on the job site comply with all applicable regulatory requirements. The Authority reserves the right to inspect all areas for potential safety hazards and violations at its discretion, direct the Contractor to make immediate improvement of necessary conditions and/or procedures, and/or stop the work if potential safety hazards are deemed to exist. The operation of the Contractor's vehicles or private vehicles by the Contractor's employees on or about the job site shall conform to Authority's posted restrictions, and safe driving practices. shall be responsible for maintaining a reliable fire prevention and protection program for its employees and the property serviced. Smoke Free Facilities All the Authority's facilities on the job site are smoke free. The Contractor and its employees shall adhere to the Robert J. Dole VA requirements in regard to this facility's maintenance of a smoke free environment. Regulatory Compliance The Contractor shall promptly notify the VA technical representative if the work site is visited by an official in charge of compliance with the Occupational Safety and Health Act. This shall include but not be limited to the Contractor complying with all the Authority requirements including but not limited to the following: Construction Safety Manual Orders and Instructions Advisories Delivery of Supplies/Equipment The Contractor shall schedule all deliveries on the job site to occur only during times that cause minimum disruption and inconvenience to the Authority's operations as determined by the VA technical representative. In general, all such deliveries shall be scheduled between 7:30 AM and 5:00 PM. Accident Reports The Contractor shall immediately notify the Authority's Police department (53207) and the VA technical representative of any accident on the job site that is related to the performance of this SOW that involve bodily injury or damage to property. Timely Performance The Contractor shall be responsible for the complete and timely performance of all the services as described in the Statement of Work. If the Contractor fails to comply with this requirement or if in the opinion of the Authority, the Contractor's work methods are not adequate to assure completion of the work per the allotted schedule, the Authority may direct the Contractor, at no additional costs to the Authority, to revise his work schedule to ensure completion of the work. MSDS The Contractor shall provide the VA representative with material safety data sheets (MSDS) for all materials used and/or stored on the job site by the Contractor PERSONNEL Attire All employees, including supervisors and subcontractors of the Contractor, at all times while employed on the job site to fulfill the requirements of the Statement of Work shall be attired in distinctive attire which is acceptable to the Authority. This attire shall have the Contractor's name easily identifiable, affixed thereon in a permanent or semi-permanent manner such as a badge or monogram. These uniforms must be supplied and maintained by the Contractor at no cost to the Authority. The Contractor's employees, at all times while on the job site shall fulfill the requirements of the Statement of Work, shall conspicuously, display their respected Airport photo identification security badge issued by the Airport Operations Department. Supervision All Contractor supervisors shall clearly and understandably communicate in the English language both verbally and in writing with the Authority. These Supervisors shall communicate verbally and in writing with all of the Contractor's employees and subcontractors as required to fulfill the requirements of this Scope of Work. Contractor's Personnel The Contractor shall provide trained and qualified personnel in sufficient numbers as required to fulfill the requirements of this specification and the terms of the contract documents. At all times while at the job site, whether on or off duty, the Contractor's employees shall conduct themselves in an orderly and safe manner. Fighting or engaging in horseplay, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling soliciting, stealing, taking pictures or bringing cameras or other photographic devices anywhere on the property (unless approved in writing by the Authority), and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct from work under this contract. The Contractor's Personnel shall for the purpose of this contract include the Contractor's employees and subcontractors who are on the job site fulfilling the requirements of the Statement of Work

More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

NAICS: 238210
New
Federal
657A5-26-111, Triennial Electrical Testing
Solicitation # 36C25526R0186
Solicitation 36C25526R0186 is a negotiated, fixed-price construction contract issued by the Department of Veterans Affairs for triennial electrical testing at the Marion VA Medical Center in Illinois. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 238210, with an estimated construction magnitude between 500,000 and 1,000,000 dollars. The scope of work involves the maintenance, inspection, adjustment, and testing of the Electrical Power Distribution System, including approximately 325 electrical panels, 135 transformers, 220 switches, 6 generators, and 25 automatic transfer switches. All work must adhere to NETA 2019 specifications, the latest National Electrical Code, VHA Directive 1028, and NFPA 99 and 110 standards. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, evaluating five key factors: prime contractor past performance, technical construction and electrical testing experience of the prime, technical experience of the electrical subcontractor, qualifications of proposed staffing, and the prime contractor's safety plan. Performance must begin within 10 calendar days of the notice to proceed and be completed within 90 calendar days. Required deliverables include maintenance and testing reports and a schedule of costs submitted within 14 days of award. Proposals must be submitted in three separate volumes covering technical details, pricing via SF 1442, and a bid bond. Additional requirements include compliance with the Davis-Bacon Act, Buy American requirements, and the submission of an electronic security memorandum to maintain the confidentiality of sensitive information.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Z2DA--657-27-103JB, FCA Replace Building 51 Roof, JB
Solicitation # 36C25527Q0044
The Department of Veterans Affairs, Network Contracting Office 15, is conducting market research through a Sources Sought Notice to determine the availability of qualified Service-Disabled Veteran-Owned Small Business (SDVOSB) firms for a construction project at the St. Louis Medical Center Jefferson Barracks. The project involves the replacement of the roof and associated components for Building 51, covering approximately 56,000 square feet. The scope includes installing a 70-mil thermoplastic polyolefin (TPO) roofing system, replacing four skylights, and updating the penthouse roof-access ladder to meet OSHA and VA safety standards. The estimated value of the resulting contract is between 2 million and 5 million dollars, with a required performance period of 222 calendar days from the Notice to Proceed. The project requires the contractor to manage work within an occupied 24/7 facility, necessitating a detailed phasing plan and strict adherence to infection control and HVAC-intake protection. Key technical requirements include providing a 20-year no-dollar-limit warranty, ensuring positive drainage to prevent standing water for more than 48 hours, and submitting as-built record drawings in searchable PDF and editable CAD formats. Interested firms must be registered in SAM.gov under NAICS code 236220 and provide a capability statement by November 9, 2026, including evidence of CVE certification, bonding capability, and a history of comparable work performed within the last five years.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS